DRAFT DIV 00s_RELEASED - W9128F24B0010_GA Spillway Approach Dredge_07.09.2024.pdf

PDF 1 MB Posted

Attached to
Garrison Dam Spillway Approach Dredge Federal contract opportunity
Solicitation number
W9128F24B0010
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This document is a two-step sealed bid solicitation for the Garrison Spillway Approach Dredge project. The solicitation is utilizing a two-step sealed bidding procurement method under FAR Part 14.5. Step-One is a request for technical proposals only, and Step-Two will involve the submission of sealed priced bids by those firms with acceptable technical proposals.

The project is 100% set-aside for small business under NAICS 237990. No bid bonds are required for the Step-One technical proposal, but bid bonds will be required with the Step-Two sealed bids. The solicitation provides details on the project requirements, submission instructions, evaluation factors, and the overall two-step sealed bidding process. The project involves dredging, slope repair, and other rehabilitation work on the Garrison Dam Spillway Approach in North Dakota. The government will award a firm-fixed price construction contract to the responsive and responsible bidder with the lowest overall price in Step-Two.

View the file

Other files for this federal contract opportunity

Other files attached to Garrison Dam Spillway Approach Dredge, newest first.
File Type Posted
Abstract of Bids-W9128F24B0010 - GA Spillway Approach Dredge.pdf PDF
Bid Abstract - W9128F24B0010 - Garrison Spillway Approach Rehabilitation - Certified.pdf PDF
Bubbler Info - ProjNet BI 10914669.pdf PDF
W9128F24B0010 AM0001- 12 Jul 2024 - Updated Dredge Spec.pdf PDF
AM0001 - Register_dredge_updated.pdf PDF
AM0001 - Dredge_01 35 26_Updated.pdf PDF
Technical Data.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GA Spillw ay Approach Dredge

THIS SOLICITATION AND RESULTING CONTRACT IS UTLIZING A TWO-STEP SEALED BIDDING PROCUREMENT METHOD AS DESCRIBED IN FAR PART 14.5. IN ADDITION, THIS SOLICITATION PORTION IS THE STEP-ONE, WHICH IS A REQUEST FOR TECHNICAL PROPOSALS ONLY. BID

BONDS ARE NOT REQUIRED TO BE SUBMITTED WITH THE STEP-ONE TECHNICAL PROPOSAL.

BID BONDS ARE REQUIRED TO BE SUBMITTED WITH THE STEP-TWO SEALED BID.

THIS SOLICITATION IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237990.

X

CHASE T WILLSON 402-293-6029

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Jul-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1017 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Aug 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F24B0010 84

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F24B0010

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

BID SCHEDULE

PRICING SCHEDULE

ITEM

DESCRIPTION

QUANTITY

UNIT

UNIT PRICE

COST

BASE ITEMS

MOBILIZATION AND

DEMOBILIZATION

JOB

RIPRAP FOR EAST BANK SLOPE

REPAIRS

81,675

TON

RIPRAP FOR DREDGED MATERIAL

MANAGEMENT AREA

5,736

SPALLS

4,883

BEDDING

4,523

FILTER AGGREGATE

9,887

GRAVEL ROAD SURFACING

DISPOSAL OF UNSUITABLE

MATERIAL

18,850

CY

SILT FENCE BAFFLES

4,900

LF

DISPOSAL OF EXISTING DRAINAGE

STRUCTURE

ALL REMAINING WORK TO

CONSTRUCT NEW OUTLET

STRUCTURE AND OUTFALL DITCH

DREDGING STA 34+50 TO 49+50

127,822

CONSTRUCT DREDGED MATERIAL

MANAGEMENT AREA

REHABILITATE SPILLWAY

APPROACH EAST BANK

TOTAL BASE AMOUNT (ITEMS 0001 THRU 0013) $_____________________________

OPTION ITEMS

Option 1

DREDGING STA 49+50 TO 62+30

69,565

TOTAL BASE PLUS OPTIONS AMOUNT (ITEMS 0001 THRU 0015) $_____________________________

NOTES:

1. The Government reserves the right to exercise the options within 250 calendar days after issuance of Notice to

Proceed. No additional construction days will be given to the Contractor should the Option be awarded.

2. Prices must be entered for all items of the schedule. Total amounts submitted without prices being entered on individual items will be rejected. In case of variation between the Job (lump-sum) prices and the total amount, the lump-sum prices will be considered the price submitted. In case of variation between the unit prices and the CLIN amount, the unit prices will be considered the price submitted.

3. A modification to a proposal which provides for a single adjustment to the total amounts, should state the application of the adjustment to each respective lump-sum price and unit price affected.

4. Quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to General Conditions (Contract Clauses) Clause “Variation in Estimated Quantities”.

** NOTE: THIS BID SCHEDULE IS DRAFT ONLY AND IS PROVIDED IN

STEP-ONE FOR INFORMATIONAL PURPOSES ONLY. THE OFFICIAL

BID SCHEDULE WILL BE INCLUDED IN STEP-TWO. NO PRICING

INFORMATION SHALL BE SUBMITTED OR WILL BE ACCEPTED BY

THE GOVERNMENT IN STEP-ONE.

Section 00 21 00 - Instructions

INSTRUCTIONS FOR PROCUREMENT

This solicitation and resulting contract are utilizing a Two-Step Sealed Bidding procurement method as described in Federal Acquisition Regulation (FAR) Subpart 14.5.

This solicitation is the Step-One which is a request for technical proposals only. The technical drawings and specifications for Step-One are approximately 95% complete and not considered final or for construction.

Submitted technical proposals in response to this solicitation shall not include prices or pricing information.

Bid bonds are not required to be submitted with the Step-One technical proposal. Bid bonds will be required to be submitted with the Step-Two bid submission.

Step-One submissions will be reviewed for acceptability only. In Step-One a proposal shall be rated acceptable for all evaluation factors in order to receive an overall “acceptable” rating, and to be able to participate in the Step-Two bid.

In Step-Two only offers who submitted acceptable technical proposals in Step One will be allowed to submit bids.

The 100% final technical drawings, final bid schedule and other final bidding information will be provided to all technically acceptable firms during Step-Two via a solicitation amendment.

The Step-One request for technical proposal is due no later than the date and time listed on the Standard Form 1442, Block 13 A.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-2 Availability of Defense Specifications, Standards, and Data

Item Descriptions in the Acquisition Streamlining and Standardization Information System (ASSIST) Website

SEP 2023

52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-23 Late Submission, Modifications, And Withdrawals Of

Technical Proposals Under Two-Step Sealed Bidding

NOV 1999

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.228-1 Bid Guarantee SEP 1996 252.204-7009 Limitations on the Use or Disclosure of Third-Party

Contractor Reported Cyber Incident Information

JAN 2023

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors

JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer:

USACE – Omaha District Attn: Ms. Jessica Jackson 1616 Capitol Avenue Omaha, Nebraska 68102-4901

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 16 July 2024 at 09:00 AM Cerntral Time.

(c) Participants will meet at-- Garrison Dam Administrative Facility 201 1st Street Riverdale, ND

(c) Interested contractors should contact Ms. Leeann Wimer at leeann.r.wimer@usace.army.mil NLT COB 15 July 2024. Ms. Wimer may be reached at 701-301-0437 regarding the site visit only. All other questions shall be submitted via ProjNet. See Section 00 22 00.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.acquisition.gov

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

N/A

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,

DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)

The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:

Please see solicitation documents.

Section 00 22 00 - Supplementary Instructions

INSTRUCTIONS TO BIDDERS

TWO-STEP SEALED BID OVERVIEW,

GENERAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, EVALUATIONS

AND CONTRACT AWARD

1. OVERVIEW

a. This is a “Two-Step Sealed Bid” Invitation for Bid (IFB) for the Garrison Spillway Approach Rehabilitation, Garrison Dam, North Dakota. The Contracting Officer will award one (1) firm fixed-price construction contract to the responsive and responsible bidder whom the Government determines to have an acceptable Step-One technical proposal, conforms to the solicitation requirements, is fair and reasonable, and bids the lowest overall price in Step- Two.

b. The Step-One Request for Technical Proposals (RFP) is issued with approximately 95% complete sufficiently descriptive technical specifications and construction drawings. The information contained in Step-One is not binding on the Government, and the actual delivery or performance requirements will be contained in the invitation issued under Step-Two. The 95% specifications and drawings are not final or to be used for construction. Only those firms determined to be technically acceptable during Step-One will be issued the 100% final technical specifications and construction drawings during Step-Two.

c. The Two-Step Sealed Bidding procedure is a combination of competitive procedures designed to obtain the benefits of sealed bidding while ensuring only technically acceptable firms participate in the priced sealed bid. The process allows for the Step-One technical proposal submission and evaluation to be performed concurrent with the development of the final 100% technical specifications and construction drawings. Step-One ensures that only technically acceptable firms participate in the Step-Two, the sealed bid process.

d. Step-One under this process consists of the request for, submission of, evaluation and (if necessary) discussion of a technical proposal. Only one technical proposal may be submitted by each offeror. The proposals are evaluated for technical acceptability. The Step-One technical proposal must not include prices or pricing information.

e. In Step-One, offerors must submit technical proposals that are complete and acceptable without the need for additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with Step-Two without requesting further information from any offeror; however, the Government may request additional information from, or enter into discussions with, the offerors of proposals that are determined to be reasonably susceptible of being made acceptable. Discussions will only be held if necessary, and if determined to be in the best interest of the Government.

f. A notice of “acceptable” or “unacceptable” will be forwarded to each Step-One offeror upon completion of the technical proposal evaluation and final determination. The names of the offerors that submitted acceptable technical proposals will be listed on the Government’s https://sam.gov website for the benefit of prospective subcontractors.

g. In Step-Two, an amendment with the final 100% technical specifications and construction drawings will be issued to only those offerors whose technical proposals are determined to be acceptable in Step-One. The normal sealed bidding process in FAR Part 14 will be followed. In Step-Two, only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. Each bid submitted in Step-Two must be based on the bidder's own technical proposal that was submitted, evaluated and determined to be acceptable in Step-One. Bidders must comply with the 100% technical specifications and construction drawings and the bidder’s acceptable technical proposal.

h. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one (1) or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.

The Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in an offer or, for arrangements entered into after submission of an offer, before the arrangement becomes effective. The Government will not normally require or encourage the dissolution of contractor team arrangements. The Offeror must identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.

i. Any Offeror submitting an offer in the name of a Joint Venture must include a fully executed copy of the Joint Venture Agreement with the offer. Joint Venture Agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed Joint Venture for this project with the appropriate SBA personnel.

2. STEP-ONE TECHNICAL PROPOSAL SUBMISSION INSTRUCTIONS

All offerors are required to submit a technical proposal with the minimum content as specified herein.

Proposals without the minimum content may be rated other than “acceptable”. Step-One Technical Proposals shall be emailed to the below individuals no later than the date and time established in Block 13 of the Standard Form (SF) 1442, or Block 14 of the most recent SF 30, as applicable:

Contracting Officer: Jessica Jackson, jessica.r.jackson@usace.army.mil

Contract Specialist: Chase Willson, chase.t.willson@usace.army.mil

Each email shall contain the following information:

a. Solicitation No: W9128F24B0010

b. Bid Due Date and Time: [Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable]

c. Bid Validity Date: 60 Days

Submissions received after the date and time stated within Block 13 of the SF 1442 or Block 14 of the most recent SF 30, as applicable, will be considered late and will not be considered for award. To avoid rejection of a submission, the offeror must ensure the e-mail submission is virus-free. The Government will follow FAR

14.406 if an e-mail bid is unreadable.

Bidders must be registered in the System for Award Management (SAM) when sending the submission to comply with the annual representations and certifications requirements. The offeror certifies with its offer that the representations and certifications included in SAM are current, accurate, and complete.

3. STEP-ONE TECHNICAL PROPOSAL FORMAT REQUIREMENTS

Submit the Step-One technical proposal via email in PDF format and Optical Character Recognition (OCR)* compatible and word searchable. Each section must be clearly labeled by solicitation number, project name, and Offeror’s name.

*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.

Bidders should enter a description for every file submitted. Bidders should separate files over 20 megabytes (MB) into smaller files and send separate e-mails. Bidders shall identify each e-mail with the number relative to the total number of e-mails submitted (i.e., “e-mail 1 of 4”). Bidders should request Government receipt upon sending all e-mails. Bidders should not assume e-mail submissions are instantaneous and must consider file size and number of files sent. Bidders should send bids at least 1 hour early to ensure delivery and may send test e-mails to USACE the day before bid opening.

Step-One technical proposals will be organized with a table of contents as follows:

COVER LETTER - Solicitation number; Name, address, email, and telephone number of the offeror; Names, titles, emails, and telephone numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP. Name, title and signature of the person authorized to sign the proposal.

A statement specifying agreement with all terms, conditions and provisions included in the RFP;

CAGE Code and UEI number for the offeror, and all teaming partners and / or Joint Ventures.

Note: The inclusion of any exceptions to the terms and conditions of the solicitation in the technical proposal, or the inclusion of any other terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the proposal is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the proposal.

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror, include the offeror’s UEI number in Block 14.

Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).

TAB B – Section 00 45 00 – Representations and Certifications, Printed Entity Record from the online System for Award Management (SAM) database.

TAB C – Teaming & Joint Venture Arrangements: Offers submitting proposals using a teaming arrangement shall submit a fully executed copy of the teaming arrangement signed both by the subcontractor/teaming partner and the offeror and the narrative described in Section 00 21 00 paragraph 1.h above.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal, including letters of commitment from the joint venture firms. See Section 00 21 00 paragraph 1.i above.

TAB D – All submission requirements for Factor 1: Past Performance submission requirements

TAB E– All submission requirements for Factor 2: Construction Approach submission requirements

4. STEP-ONE TECHNICAL PROPOSAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org. To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.

***Please Note: Offerors shall only submit one (1) question per inquiry. All inquiries containing multiple questions may be rejected. Please review all previous inquiries to limit redundant inquiries.

The Project ID is: GR00102 Project Name: Spillway Approach Rehabilitation

- Bidder Inquiry Key: KKAU4Q-U88EQV

Instructions for first-time ProjNet Bid Inquiry Access:

a. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

b. Identify the Agency. Select agency USACE.

c. Key. Enter the Bidder Inquiry Key listed above.

d. Email. Enter the email address you would like to use for communication.

e. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

f. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

g. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for future ProjNet Bid Inquiry Access:

a. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

b. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

c. Identify the Agency. Select agency USACE.

d. Key. Enter the Bidder Inquiry Key listed above.

e. Email. Enter the email address you used to register previously in ProjNet.

f. Click Continue. A page will then open asking you to enter the answer to your Secret

Question.

g. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

The Bidder Inquiry System will be unavailable for new inquiries 10 calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.

Proposing firms are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.

5. ELIGIBILITY FOR CONTRACT AWARD

In accordance with the requirements of Part 9 of the FAR, no contract shall be entered into unless the Contracting Officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award will be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective prime contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

6. STEP-ONE REQUEST FOR TECHNICAL PROPOSALS EVALUATION

The Government will evaluate each offeror’s technical proposal based on how well the proposal addresses each of the evaluation factors listed below. Each of the evaluation factors will be evaluated by the Government and either an “acceptable”, “unacceptable” or “reasonably susceptible of being made acceptable” rating will be determined by consensus of the Government evaluation board. There are no relative weights assigned to the factors. A Step-One acceptable technical proposal must be rated “acceptable” for all evaluation factors in order to receive an overall “acceptable” technical proposal rating.

General Technical Proposal and Evaluation Information:

a. The evaluation will be conducted in accordance with FAR Subpart 14.5, Two-Step Sealed Bidding. For this procurement, only one (1) technical proposal may be submitted by each offeror. The proposal must be complete without the need of additional explanation or information. The Government may proceed with Step-Two without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers “reasonably susceptible of being made acceptable.”

b. Technical Proposals will be rated at the factor level. If any factor is determined to be “unacceptable”, the entire proposal will be determined “unacceptable”. A technical proposal may be determined to be “reasonably susceptible of being made acceptable”, and therefore eligible for discussions. However, a proposal with a factor that is determined to be “unacceptable” will be eliminated from further consideration.

c. Technical proposals which do not provide the specified information in the specified location in accordance with the submission instructions may be rated other than “acceptable”. The Government is under no obligation to search for information that is not in the specified locations. If an offeror submits alternates that are not requested, the information will not be evaluated.

d. In general, example projects or experience that the Government does not consider relevant for the purposes of evaluating experience will not be considered as a part of the minimum project requirement.

e. The degree of acceptability to the Government inherent in the content of the offeror’s technical proposal will be a consideration under every evaluation factor.

f. If discussions are held with offerors whose proposals are considered “reasonably susceptible of being made acceptable” and a request for proposal revisions are requested, the revised proposal will be re-evaluated in accordance with the criteria in the solicitation. After completion of discussions and evaluation of any revised proposals, the proposal will be determined as “acceptable” or “unacceptable”.

If determined “unacceptable”, a notice of unacceptability will be forwarded to the offeror upon completion of the proposal’s evaluation.

g. Any proposal which modifies or fails to conform to the essential requirements or specifications of the request for technical proposals will be considered nonresponsive and categorized as “unacceptable”.

h. The offeror’s conformance with the specified format and submission requirements will be considered during the technical evaluation. Failure to comply with the formatting and/or submission requirements may be seen as indicative of the type of problems that could be expected during contract performance.

Lack of conformance and material omission(s) may cause the technical proposal to be rejected as “unacceptable”.

i. The proposal submission instructions are written to give prospective offerors, where feasible, an indication of the level of detail desired by the Government. The offeror’s failure to include information that the Government has indicated must be included will result in the proposal being found other than “acceptable” if inadequate detail is provided.

j. Do not include exceptions to the terms and conditions of the solicitation in the technical proposal submissions. The inclusion of any terms and conditions in the proposals that conflict with the terms and conditions of the solicitation may result in a determination that the proposal/bid is “unacceptable” and thus ineligible to bid in Step-Two. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the proposal/bid; see “Proposal Inquiries and Questions”, located above in Section 00 21 00.

k. Factor and Overall Technical Proposal Ratings. Each factor and the overall technical proposal as a whole will be given the ratings identified and defined as follows:

FACTOR 1 RATINGS (Past Performance) DEFINITION

Acceptable

Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable

Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will successfully perform the required effort.

FACTOR 2 RATINGS (Construction Approach)

DEFINITION

Acceptable The proposal meets the requirements of the RFP and indicates an adequate approach and understanding of the requirements.

Reasonably Susceptible of Being Made Acceptable (Note: This rating is not used for the overall technical proposal rating)

The proposal, as proposed, cannot be rated as Acceptable because of error(s), omissions(s) or deficiency(ies) which are capable of being corrected without a major rewrite or revision of the proposal.

Unacceptable The proposal does not meet the requirements of the RFP.

Submission Requirements and Evaluation Criteria for the Technical Proposal

The information provided in this section will be used in evaluating the offeror’s specialized technical experience and proposed construction approach, specific to this solicitation.

Factor 1 – Past Performance

There are three (3) aspects to the performance confidence evaluations: recency, relevancy, and quality of past performance. In accordance with FAR 15.305(a)(2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered.

Relevance and quality of performance will be combined to establish one performance confidence assessment rating for each Offeror. The project examples requested within this factor must be of relevant scope and complexity to the solicited project.

Submission Requirements:

Submit a minimum of two (2) example projects and a maximum of five (5) example projects with a minimum contract value of $1,000,000, completed within the last 7 years (from Step-One IFB issue date) demonstrating the proposing firm’s recent, relevant experience on projects of a similar size, scope and complexity as this project. If more than five (5) projects are submitted, only the first five (5) will be evaluated. The projects submitted shall be limited to no more than two (2) pages for each project submission. Additional pages above the limit for each project will not be evaluated.

Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of task orders for the performance of tasks shall not be considered projects for the purposes of this evaluation. Only individual task orders issued under such contracts will be evaluated as projects. However, a phased project using phased task orders for a single customer with multiple inter-dependent facilities on a single site may be considered a project for the purposes of this evaluation. Project descriptions that do not clearly describe the proposing firm’s or team member’s experience, the scope of the project, or the periods of project performance will not be considered.

The information that is required for Factor 1, below, is provided in the template Attachment A, Experience in Relevant Projects, which can be extended as necessary. Offerors are not required to use the form itself as part of their proposal, but the information requested for Factor 1 must be in the offeror’s proposal and should be in the same format as the template.

The following information is required for each submitted project experience:

1) Project Title

2) Location

3) Contract Number

4) Type of Contract: Indicate Firm Fixed Price; Cost Plus Fixed Fee; etc.

5) Total Dollar Amount at Award and Completion: Total amount of the proposing firm’s contract or subcontract

(if a key subcontractor)

6) Project Delivery Method: Indicate Design/Bid/Build; Design/Build; Integrated Design; Design Only; etc.

7) Role of Proposing Firm: Prime contractor or key subcontractor. If a subcontractor, state who is the prime contractor. State if the example project represents a Joint Venture. If a Joint Venture, name the Joint Venture’s parties. Indicate type of work and percentage of work performed by the parties.

8) Brief Description of Project: Provide a narrative with details about the proposing firm’s role and the relevancy to this project

9) Project Relevancy: Address any relevancy of the submitted project using, at a minimum, the relevancy criteria

(a) and (b) below

10) Construction Start and Completion Dates: Project construction must be identified as complete or substantially complete. If a proposing firm presents a project that is substantially complete, the proposal must include an explanation of why that project should be considered.

11) Customer / End User’s Primary Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

12) Procuring Activity Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.

A recent project is a project that is complete, or substantially complete within 7 years of this request for Step- One technical proposal issue date. If a proposing firm submits a project as substantially complete within the 7-year period, the proposal must include an explanation why that project should be considered substantially complete. Project should be substantially complete, meaning more than 90% invoiced and paid.

The relevancy of submitted projects must be substantiated by the proposing firm’s role, work, size, scope, and complexity similar to the requirements in this project. In making this determination, the Government will use the following criteria to establish the acceptable relevancy of a submitted project (this is not an exclusive list and each relevant project does not need to meet all of the criteria):

a. Experience dredging and managing/conveying of dredged material at locations similar in nature to this project such as rivers, reservoirs, and ports (>50,000CY per project).

b. Experience with underwater material placement for an embankment or stream bank (≥10ft deep under water and >20,000 tons per project).

c. Experience constructing earthen embankments along water ways such as dams and stream banks. This will include cohesive material such as clay and slope protection made up of riprap and bedding (cohesive fill >20,000CY, all other materials >20tons per project).

The project descriptions and relevancy narratives must clearly articulate the relevancy in sufficient detail to determine technical capability.

Quality: In addition, submit a completed CPARS for each submitted example project. DO NOT provide past performance information for projects other than project examples provided for this factor. The quantity of CPARS submitted is the same as the quantity of projects submitted.

If a completed CPARS is not available, the Past Performance Questionnaire (PPQ) (Attachment B) is provided for the offering firms to submit to the client of each project the offering firm includes in its submission requirements for Factor 1. Ensure correct phone numbers and email addresses are provided for the client’s point of contact. The completed PPQs should be submitted with the Step-One technical proposals. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Chase Willson, via email prior to the Step-One technical proposal closing date and time. Previously completed PPQs are acceptable.

Evaluation Criteria:

The Government’s overall rating for this factor will be based on the Offeror’s Past Performance to include recency and relevancy of the projects submitted and the quality of performance.

The burden of providing detailed, current, accurate and complete past performance information rests with the proposing firm. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or of the team member. The prime contractor will be rated on its own performance. A prime contractor may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity.

In accordance with FAR 15.305 and DFARS 215.305, the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance will be considered. However, the comparative assessment in FAR 15.305(a)(2)(i) does not apply. Therefore, past performance will be rated on an “acceptable” or “unacceptable” basis only.

In the case of an offeror for whom information on past performance (CPARS or PPQs) is not available or so sparse that no meaningful past performance quality rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably (see FAR 15.305(a)(2)(iv)). Therefore, the offeror will be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered acceptable.

The Government may also review past performance information from any sources available to the Government, to include, but not limited to, the Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/ UEI numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The evaluation may take into account the number and severity of problems, the demonstrated effectiveness of corrective actions taken, and the overall work record.

Minimum Acceptability Criteria:

Past performance information must be submitted for minimum of two (2) example projects and a maximum of five

(5) example projects completed or substantially completed within the last 7 years from the date of the Step-One issuance date demonstrating the proposing firm’s recent, relevant experience.

The recency and relevancy of each submitted project’s shall include:

a. Each project example shall include at least two (2) of the similar scope criteria listed above in a through c.

The experience provided by the compilation of all the submitted projects shall include experience on all items above in a through c.

b. Each submitted project shall have a minimum contract value of $10M.

c. Two (2) of the submitted projects shall include item a. (experience dredging and managing/conveying of dredged material).

d. All project shall have been completed within the last 7 years (from date of Step-One issuance).

The project descriptions and relevancy narratives must clearly articulate the relevancy in sufficient detail to determine technical capability. The more similarities an example project has with the prospective contract, the greater the degree of relevancy

A proposing firm demonstrates acceptable past performance by meeting the minimum submission and past performance solicitation requirements and based on the offeror’s satisfactory or higher performance record, the Government has a reasonable expectation that the offeror will successfully perform the required efforts in the requirements. The Government will have confidence in the firm’s probability to successfully supply products and services that meet all the contract’s plans, specifications requirements.

Factor 2 – Construction Approach

Submission Requirements:

The proposing firm must clearly communicate its proposed technical approach for the solicited project which meets the attached 95% technical specifications and construction drawings. The technical approach shall be described in 15 pages or less. If the offeror’s Factor 2 submission exceeds 15 pages, only the first 15 pages will be evaluated.

The narrative shall address how all assumptions and the dewatering system requirements are determined. If additional assumptions are needed, then clearly list them and explain the reason for each assumption. The proposal shall include, as a minimum, the following elements:

a. Any special work restrictions or phasing identified in the solicitation documents,

b. Subcontractor management,

c. Contract Close-out,

d. Dredging plan meeting the requirements of the specification in 25 20 23

e. Workplan in accordance with the earthwork specification in 31 00 00 (embankment construction, underwater material placement, riprap, etc.),

f. Approach to the management of the dredge material in the disposal area,

g. Description of QC system and testing approach

h. Construction schedule, to include the following:

• Sequencing and managing important construction activities and milestones that demonstrate a firm understanding of how to schedule and manage the project’s construction and earthwork,

• Durations in calendar days that meet the contract requirements. (Note: this is a concept schedule used to ensure the contractor understands the scope and sequencing of the project and is not considered a post- award construction submittal),

• Alternative work schedules, 24-hour work schedules, multiple shifts in a 24-hour period, or concurrent crews to facilitate limited construction windows. Using current personnel on your payroll, demonstrate your capability to cover above schedules.

Include: Superintendents, QC, Safety, and laborer personnel,

• Coordination between features of construction/sequencing work/staging,

• Include the following items:

• Pre-construction submittals,

• Existing Conditions Survey,

• Mob(s) and Demob(s),

• Slope protection material delivery,

• Dredging activities,

• Earthwork activities,

• Slope protection activities,

• Dredged material management area construction

Evaluation Criteria:

The Government will evaluate the technical approach in its entirety and categorize the proposal with one (1) combined technical evaluation for this factor.

The proposing firm’s technical approach narrative must be in an organized manner that acceptably addresses the elements and sub-elements listed in the submission requirements.

Minimum Acceptability Criteria:

1. The proposing firm’s Technical Approach must, at a minimum, include and address all the elements and sub-elements listed in the submission requirements.

2. A proposing firm demonstrates an acceptable Technical Approach by meeting the minimum submission requirements for this factor and providing the Government with a technical approach plan that meets all of the attached plans, specifications, and contract requirements, commensurate with this project’s size, scope, and complexity.

7. STEP-TWO INVITATION FOR BID, EVALUATION, AND AWARD

Step-Two in the process involves the submission of sealed priced bids by those who submitted acceptable technical proposals in Step-One.

The Step-Two Invitation for Bid (IFB) will be issued to the acceptable firms as an amendment to the solicitation and include the final 100% technical specifications and construction drawings, final bid schedule, and other final bidding information. The priced bids will be due no later than the date and time listed in the amendment. The bids submitted in Step-Two will be evaluated and the award made in accordance with Subparts 14.3 and 14.4.

In Step-Two, only bids based upon technical proposals determined to be “acceptable”, either initially or as a result of discussions, will be considered for award. Each bid in Step-Two must be based on the bidder's own technical proposal that was submitted, evaluated, and determined to be acceptable in Step-One.

Bidders must comply with the final technical specifications and construction drawings and the bidder’s acceptable technical proposal. Do not include exceptions to the terms and conditions of the solicitation in the bid submissions.

The inclusion of any terms and conditions in the bid that conflicts with the terms and conditions of the solicitation may result in a determination that the proposal/bid is unacceptable and thus ineligible for Step-Two and award.

Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the proposal/bid; see “Proposal Inquiries and Questions”, located above in Section 00 21 00.

Attachment A Experience in Relevant Projects

Attachment B

EXPERIENCE IN RELEVANT PROJECTS

<<Picture>>

Contractor’s Name:

Project Title: Project Location: (City, State)

Contract Number:

Type of Contract: (Firm Fixed Price, Cost Plus Fixed Fee, etc.)

Total Dollar Amount at Award: (Total amount of the proposing firm’s contract or subcontract (if a key subcontractor))

Total Dollar Amount at Contract Completion: (Total amount of the proposing firm’s contract or subcontract at completion (if a key subcontractor))

Project Delivery Method: (Bid/Build; Design/Build, etc.)

Role of Proposing Firm: (Prime contractor or key subcontractor. If a subcontractor, state who is the prime contractor. State if the example project represents a Joint Venture. If a Joint Venture, name the Joint venture’s parties.

Indicate type of work and percentage of work performed by the parties.)

Brief Description of Project: (Provide a narrative with details about the proposing firm’s role and the relevancy to this project.)

Explanation of the Project’s Relevancy: (Reference the Factor 1 evaluation criteria and the criteria that may be used to establish the acceptable relevancy of a project.)

Construction Start and Completion Dates: (Project construction must be identified as complete or substantially complete. If a proposing firm presents a project that is substantially complete, the proposal must include an explanation of why that project should be considered.)

Customer / End User’s Primary Point…

This is the start of the file's text. The full file is on GovTribe.