Garrett Hull OSS (Makah)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 75H70125Q00018
- Agency
- Indian Health Service Department of Health and Human Services
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Clallam Bay, Washington 98326, United States
- Points of contact
-
- Robert S. Miller robert.miller2@ihs.gov (214) 767-8589
- Andrew E. Hart andrew.hart@ihs.gov (206) 375-4443
Notice details come from SAM.gov. Updated .
About this opportunity
The Indian Health Service (IHS) is seeking a small business contractor to install an on-site septic system (OSS) for Garrett Hull, a Makah Tribe member, located in Clallam Bay, Washington. The solicitation, numbered 75H70125Q00018, requires a licensed septic installer to construct a comprehensive wastewater treatment system that includes a 1,000-gallon dual-chamber treatment tank, a 1,000-gallon pump tank, 220 feet of supply and return lines, and a 900-square-foot sand mound drain field. Contractors must be registered in the System for Award Management (SAM) and comply with Washington State Water Resource Department regulations. Price will be the primary evaluation criterion for this contract, with proposals due electronically by April 17, 2025, at 2:00 pm CST. The solicitation indicates that the U.S. Department of Labor Wage Determination WA20250081 dated 3/7/2025 will apply to the project.
The contract is a 100% small business set-aside under NAICS code 237110 with a $45.0M size standard for water and sewer line construction. The estimated project value ranges between $25,000 and $100,000, with a firm fixed-price structure and a 45-calendar day performance period from the Notice to Proceed. The specific location of performance is 495 Eagle Crest Way in Clallam County, Washington, a residential property owned by Garrett Hull. The project will be managed by the IHS Portland Area Office, with key contacts including Project Engineer Madeline Keep and Contracting Officer's Representative Michelle Bernard. The septic system design was prepared by Absolute Earthworks LLC and is configured to handle 360 gallons per day, with the final system to be transferred to the homeowner upon successful completion and inspection.
Notice text
2 versions
Update #2 · Latest ·
Amendment A01 - Q&As
Garrett Hull (Makah) OSS
Update #1 ·
Garrett Hull (Makah) OSS
Attachments
| File | Type | Posted |
|---|---|---|
| 75H70125Q00018-A00001.pdf | ||
| 9-US DOL WD WA20250081 Dated 3-7-2025.pdf | ||
| 8-Measurement and Payment.docx | DOCX document | |
| 4-Design and County Permit.pdf | ||
| 1-Statement of Work.docx | DOCX document | |
| 7-OSCAR XO2 Installation Manual.pdf | ||
| 5-IHS Technical Provisions.pdf | ||
| 6-OSCAR XO2 Design Manual.pdf | ||
| 3-Aerial View 2.pdf | ||
| 2-Aerial View 1.pdf | ||
| B01 75H70125Q00018 - Rev1.pdf | ||
| A11 Pre-Solicitation SAM notice DRAFT.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Garrett Hull OSS (Makah) | Award Notice | |
| Garrett Hull OSS (Makah) | Solicitation | |
| Garrett Hull OSS (Makah) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity