GAOA Hoonah Road Resurfacing & Wukuklook Rec Area
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1240BJ21B0001
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Hoonah, Alaska 99829, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks bids for road resurfacing and recreation area improvement work on the Hoonah Ranger District of the Tongass National Forest in Alaska. The U.S. Department of Agriculture Forest Service R6-Pacific Northwest Region is procuring these services to provide safe access and enable resource management activities. The base bid includes reconstructing 3.2 miles of Forest Road 8530 along with six optional items such as blasting, road work, parking lot expansion and trail replacement. Bids are due by September 16, 2021 and will be evaluated for best value.
The solicitation is set aside for HUBZone small businesses. The primary NAICS code is 237110 for water and sewer line and related structures construction while the PSC code covers highway and street construction. The work must be completed by December 31, 2022 in Hoonah, Alaska and includes resurfacing over 3 miles of road as well as optional tasks like blasting, parking lot expansion and stockpiling 2,500 cubic yards of aggregate.
Notice text
6 versions
Update #6 · Latest ·
Amendment A05 added to attachments
Amendment A04 added to attachments
No further questions will be accepted.
Amendment A03 added to attachments.
Amendment A02 added to attachments.
Amendment A01 added to attachments.
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Update #5 ·
Amendment A04 added to attachments
No further questions will be accepted.
Amendment A03 added to attachments.
Amendment A02 added to attachments.
Amendment A01 added to attachments.
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Update #4 ·
Amendment A03 added to attachments.
Amendment A02 added to attachments.
Amendment A01 added to attachments.
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Update #3 ·
Amendment A02 added to attachments.
Amendment A01 added to attachments.
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Update #2 ·
Amendment A01 added to attachments.
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Update #1 ·
B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.
B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ (QR Code on page 5 of the solicitation.)
The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.
Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
Files
| File | Type | Posted |
|---|---|---|
| 1240BJ21B0001A05_Wukuklook.pdf | ||
| 1240BJ21B0001A04.pdf | ||
| 1240BJ21B0001A03.pdf | ||
| 1240BJ21B0001A02_Wukuklook.pdf | ||
| 1240BJ21B0001A01Wukuklook.pdf | ||
| 1240BJ21B0001_Wukuklook final.pdf | ||
| 1240BJ21B0001Section J.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA Hoonah Road Resurfacing & Wukuklook Rec Area | Award Notice | |
| This notice | Solicitation | |
| GAOA Hoonah Road Resurfacing & Wukuklook Rec Area | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements | Federal Highway Administration | No set-aside | |
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity