GAOA Hoonah Road Resurfacing & Wukuklook Rec Area

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240BJ21B0001
Agency
Responses due
Set-aside
HUBZone

Opportunity facts

Place of performance
Hoonah, Alaska 99829, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids for road resurfacing and recreation area improvement work on the Hoonah Ranger District of the Tongass National Forest in Alaska. The U.S. Department of Agriculture Forest Service R6-Pacific Northwest Region is procuring these services to provide safe access and enable resource management activities. The base bid includes reconstructing 3.2 miles of Forest Road 8530 along with six optional items such as blasting, road work, parking lot expansion and trail replacement. Bids are due by September 16, 2021 and will be evaluated for best value.

The solicitation is set aside for HUBZone small businesses. The primary NAICS code is 237110 for water and sewer line and related structures construction while the PSC code covers highway and street construction. The work must be completed by December 31, 2022 in Hoonah, Alaska and includes resurfacing over 3 miles of road as well as optional tasks like blasting, parking lot expansion and stockpiling 2,500 cubic yards of aggregate.

Notice text

6 versions

Update #6 · Latest ·

Amendment A05 added to attachments

Amendment A04 added to attachments

  No further questions will be accepted.

Amendment A03 added to attachments.

Amendment A02 added to attachments.

Amendment A01 added to attachments.

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Update #5 ·

Amendment A04 added to attachments

  No further questions will be accepted.

Amendment A03 added to attachments.

Amendment A02 added to attachments.

Amendment A01 added to attachments.

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Update #4 ·

Amendment A03 added to attachments.

Amendment A02 added to attachments.

Amendment A01 added to attachments.

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Update #3 ·

Amendment A02 added to attachments.

Amendment A01 added to attachments.

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Update #2 ·

Amendment A01 added to attachments.

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Update #1 ·

B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line.

B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ    (QR Code on page 5 of the solicitation.)

The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work:
Base Bid
Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx.
3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds.
Option Work:
Option 1 -
Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner.
Option 2 –
Includes reconditioning and placing a 6” lift of crushed aggregate on the first 1.4 miles of the 8576 road.
Option 3 –
Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van).
Option 4 –
Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds.
Option 5 –
Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail.
Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area.

Option 6 –
Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C
End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.

Files

File Type Posted
1240BJ21B0001A05_Wukuklook.pdf PDF
1240BJ21B0001A04.pdf PDF
1240BJ21B0001A03.pdf PDF
1240BJ21B0001A02_Wukuklook.pdf PDF
1240BJ21B0001A01Wukuklook.pdf PDF
1240BJ21B0001_Wukuklook final.pdf PDF
1240BJ21B0001Section J.pdf PDF

Notice history

Notice Type Posted
GAOA Hoonah Road Resurfacing & Wukuklook Rec Area Award Award Notice
This notice Latest solicitation Solicitation
GAOA Hoonah Road Resurfacing & Wukuklook Rec Area Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements Anchorage, Alaska, United States · NAICS 237310 Federal Highway Administration No set-aside
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 Forks, Washington, United States · NAICS 237310 Federal Highway Administration No set-aside
Access Road Repair National Elk Refuge NAICS 237310 — Total Small Business
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors