GAOA-Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction
Pre-Solicitation Posted
- Solicitation number
- 1240LS24R0004
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Logan, Utah, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking to procure the reconstruction of the historic Guinavah-Malibu Campground and Amphitheater located in the Uinta-Wasatch-Cache National Forest in Utah. The project includes demolition work, construction of a new campground loop with roads, spurs, restrooms, and site furnishings, a new entrance road and day-use area, and realignment of existing roads. Optional bid items include asphalt paving, additional pavilions, and restoration of the historic amphitheater. Special care must be taken to protect and retain the existing Civilian Conservation Corps (CCC) historical features throughout the site.
This procurement is designated as a Total Small Business Set-Aside. The NAICS code is likely 236220 (Commercial and Institutional Building Construction) and the PSC code is likely Y1FJ (Parks). The solicitation is expected to be issued on approximately April 23, 2024, with work anticipated to start in Fall 2024/Spring 2025. A pre-solicitation site visit is scheduled for April 2, 2024 at the Guinavah-Malibu Campground. This is not a request for proposal at this time, and the government does not intend to award a contract based solely on the site visit.
Notice text
Presolicitation
Site Visit
GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction
Uinta-Wasatch-Cache (UWC) National Forest
Cache County, Utah
Solicitation #: 1240LS24R0004-Replaces 1240LS23R0006
Date: April 2, 2024
Time: 1:00 PM
Address: Guinavah-Malibu Campground. The Forest Service will open the gate for access to the campground.
THIS PRESOLICITATION NOTICE IS ISSUED FOR INFORMATIONAL PURPOSES ONLY AND TO PROVIDE AN OPPORTUNITY FOR VIEWING, OF THE PROJECT SITE, PRIOR TO ISSUANCE OF THE SOLICITATION. THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE OR BID.
The UWC National Forest may issue Solicitation No. 1240LS24R0004.
The Guinavah-Malibu site includes a campground, group sites, trailhead, day-use area with picnic sites and a historical amphitheater. Special care to protect and retain existing CCC Historical features throughout the site is required.
-
-
- Base Bid:
- Demolition:
- Obliterating existing roads that are to be removed.
- Removal of Crack Willow and Marked Hazard trees and existing exposed tree stumps throughout the site.
- Removal existing site furnishings (tables, concrete slabs, fire rings, water hydrants).
- Removal of 1 Slump Block toilet building.
- Guinavah-Malibu Campground:
- Constructing a new campground "loop", including new road, spurs, restrooms, family units and site furniture.
- Constructing a new entrance road and central intersection, with pull-out and kiosk
- Realigning existing roads and intersections.
- Installing new road signs and campsite unit numbers
- Construct Right Turn Lane on US HWY 89.
- Install CXT Toilets
- Demolition:
- Base Bid:
-
-
-
-
- Day-Use Area, Group Sites, Crimson Trailhead:
- Constructing a new road, day-use parking area, surfaces will be a mix of aggregate and asphalt.
- Install a new bulletin board.
- Constructing a new picnic area, including a pathway system, signs and site furniture.
- Construction pavilions with site furnishings
- Install CXT Toilets
- Day-Use Area, Group Sites, Crimson Trailhead:
- Optional Bid Items:
- Option #1: Asphalt Paving
- Place 3” asphalt pavement on Roads, Parking Areas, and Spurs.
- Option #2: Pavilions
- Erect pavilions at group sites.
- Option #3: Amphitheater Restoration
- Removal of existing amphitheater seating planks and posts.
- Installing new wood plan benches and supports,
- Constructing accessible pathway
- Constructing new wood stairs
- Installing pathway lighting
- Construct pavilion with site furnishings
- Option #1: Asphalt Paving
-
-
This is not a solicitation and in no way commits the Government to award a contract. The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the areas prior to issuing the solicitation. This solicitation should be issued approximately April 23, 2024.
The work anticipated under any contract resulting from the solicitation will be started approximately Fall 2024/Spring 2025.
**This is a Total Small Business Set-Aside**
Documents:
Draft Statement of Work and Specifications
Draft Drawings
Wage Determination, Highway, Cache County Utah #UT20240105 1/5/2024
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business | |
| GRTE 237343 - Rehab 4 Lazy F Ranch | National Office | Total Small Business | |
| GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest | Forest Service | Total Small Business | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities