GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2
Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 1240LT24R0004
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Richfield, Utah 84701, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking offers for the GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2. The project includes the reconstruction of the Mackinaw Campgrounds, which involves removing and disposing of existing site furniture, demolishing and removing designated restrooms, and constructing new asphalt roads, family units, tent pads, a new group site with a pavilion, and installing new precast concrete restrooms and renovating existing ones. The project also includes modifying and installing new utilities. The expected start date is September 16, 2024, with a 365-calendar day contract duration. The complete solicitation package will be made available through SAM.gov within 15-30 days after this pre-solicitation notice.
This procurement is set aside for small businesses, and the NAICS code is 237990 with a $45.0M size standard. The magnitude of the proposed project is between $1,000,000 and $5,000,000. The project is located in the Fremont Ranger District of the Fishlake National Forest, Sevier County, Utah, and can be accessed from Interstate 70 via Utah Roads 119, 24, and 25.
Notice text
Presolicitation Notice
GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2
1240LT24R0004
Project Description:
This project includes reconstruction of the Mackinaw Campgrounds (Little Mackinaw, Mackinaw and Mackinaw Extension Campgrounds).
The work includes:
- Removal and disposal of existing campground site furniture, demolition and removal of designated restrooms, and asphalt pulverizing.
- Constructing new asphalt roads and spurs.
- Constructing new family units and tent pads; and installing new campground site furniture.
- Constructing a new group site with pavilion.
- Installing new precast concrete restrooms.
- Renovating existing restrooms as designated.
- Modifying and installing new utilities, including new electrical, sewer and water lines.
Quantities associated with these options are identified in the Schedule of Items.
Project Location:
The project is located in the Fremont Ranger District of the Fishlake National Forest, Sevier County, Utah. GPS Coordinates: 38.531000°, -111.740957°. It is located approximately 42 miles by road Southeast of Richfield, Utah. From Interstate 70, the project may be accessed via Utah Roads 119, 24 and 25.
Contract Time:
Estimated start date September 16, 2024
365 Calendar Days
The magnitude of proposed project is between $1,000,000 and $5,000,000.
Project drawings will be provided as attachments to the Request for Proposal (RFP).
The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15-30 days after pre-solicitation notice Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov. Contractors will be solely responsible for obtaining amendments from this site to update files.
This requirement is being solicited as a Small Business set-aside, with the intent to award a Firm-Fixed Price contract. A single award will be made from the solicitation.
All prospective contractors must be registered in the System for Award Management (SAM) database at http:www.sam/gov/ before award of contract; failure to register in the SAM database may cause your firm to be ineligible for the award and removed from consideration.
NAICS: 237990, $45.0M
Notice history
| Notice | Type | Posted |
|---|---|---|
| GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2 | Solicitation | |
| This notice | Pre-Solicitation | |
| GAOA 4CV Mackinaw CG-Fish Lake Basin Rec Area DM Reduce Project - Phase 2 | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF | Forest Service | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business | |
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity