Galena 2024 Event PL84-99 Flood Repair
Closed Solicitation Posted
- Solicitation number
- W912EK26BA010
- Agency
-
ENDIST Rock Island
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Woman-Owned Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Galena, Illinois 61036, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Rock Island District, procured storm sewer flood repairs in Galena, Illinois under a 100% Women Owned Small Business set-aside, with bids opened August 13, 2026. The procurement is restricted to qualified WOSB entities.
Place of performance is Galena, IL 61036. Work comprises two repair areas: constructing a new manhole at the intersection of Green and Water Street (Repair Area 1) where a pressurized sewer line meets the City-owned 30-inch storm sewer line, and installing a new 24-inch reinforced concrete pipe storm main connecting City-owned structure MH-86 to Corps-owned structure MH-89 at the Hill and Water Street intersection (Repair Area 2). The brick structure MH-86 will be removed and replaced with a standard concrete manhole. At both areas, the Corps-owned pressurized storm line will be abandoned and grouted from headwall to new work, and two damaged headwalls will be removed. Performance is scheduled for the 2026 construction season and occurs on public roads and city sewer easements. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction); PSC is Y1QA.
Four bids were received. Better By Design submitted the lowest bid at $348,986.07; SD Resources Inc bid $863,560.00; Northwind Engineering LLC bid $1,384,885.00; and GWO Inc bid $1,618,608.46. The government estimate was $1,843,509.05. All bids came in below estimate, with the low bid representing approximately 19% of estimated cost. All bidders acknowledged amendments and provided 20% bid bonds. Amendment 0001 was issued August 6, 2026, revising Attachment 0003 to incorporate historical boring data; no change to the bid receipt date was made. Contact Specialist Stanley L. Bolton at stanley.l.bolton@usace.army.mil or 309-794-5527.
Notice text
3 versions
Update #3 · Latest ·
The Government has a requirement for flood repairs in Galena IL.
The work includes, but is not limited to :
The Galena 2024 Event PL84-99 Flood Repairs Project (“Project”) consists of storm sewer repairs at the following locations: the intersection of Green and Water Street (Repair Area 1) and a section around the intersection of Hill and Water Street (Repair Area 2). Work is expected to be conducted on public roads and on city sewer easements. For Repair Area 1, sewer work consists of constructing a new manhole at an existing intersection of the pressurized sewer line and the City-owned 30” storm sewer line. For Repair Area 2, sewer work consists of a connection between the City-owned structure MH-86 and the Corps-owned structure MH-89. The connection will be installed with a new 24” reinforced concrete pipe (RCP) storm main. The material of MH-86 is a brick structure and will need to be removed and replaced with a standard concrete manhole. At both Repair Areas, the Corps-owned pressurized storm line will be abandoned and filled with grout from the headwall to the new work at the Repair Areas. We will also be removing the two damaged headwalls. Construction is proposed to be completed during the 2026 construction season.
Reference the attached documents for the solicitation, specification, and drawings associated with the requirement.
Responses should be sent to Contract Specialist, Stanley L. Bolton at stanley.l.bolton@usace.army.mil no later than the date time group listed in the attached solicitation.
Note: This action is a 100% Women Owned Small Business (WOSB) set aside.
See attached document for a copy of the amended solicitation and the amended attachment 0003.
See attached document for a copy of the Bid Abstract from the bid opening today at 2pm CST
Update #2 ·
The Government has a requirement for flood repairs in Galena IL.
The work includes, but is not limited to :
The Galena 2024 Event PL84-99 Flood Repairs Project (“Project”) consists of storm sewer repairs at the following locations: the intersection of Green and Water Street (Repair Area 1) and a section around the intersection of Hill and Water Street (Repair Area 2). Work is expected to be conducted on public roads and on city sewer easements. For Repair Area 1, sewer work consists of constructing a new manhole at an existing intersection of the pressurized sewer line and the City-owned 30” storm sewer line. For Repair Area 2, sewer work consists of a connection between the City-owned structure MH-86 and the Corps-owned structure MH-89. The connection will be installed with a new 24” reinforced concrete pipe (RCP) storm main. The material of MH-86 is a brick structure and will need to be removed and replaced with a standard concrete manhole. At both Repair Areas, the Corps-owned pressurized storm line will be abandoned and filled with grout from the headwall to the new work at the Repair Areas. We will also be removing the two damaged headwalls. Construction is proposed to be completed during the 2026 construction season.
Reference the attached documents for the solicitation, specification, and drawings associated with the requirement.
Responses should be sent to Contract Specialist, Stanley L. Bolton at stanley.l.bolton@usace.army.mil no later than the date time group listed in the attached solicitation.
Note: This action is a 100% Women Owned Small Business (WOSB) set aside.
See attached document for a copy of the amended solicitation and the amended attachment 0003.
Update #1 ·
The Government has a requirement for flood repairs in Galena IL.
The work includes, but is not limited to :
The Galena 2024 Event PL84-99 Flood Repairs Project (“Project”) consists of storm sewer repairs at the following locations: the intersection of Green and Water Street (Repair Area 1) and a section around the intersection of Hill and Water Street (Repair Area 2). Work is expected to be conducted on public roads and on city sewer easements. For Repair Area 1, sewer work consists of constructing a new manhole at an existing intersection of the pressurized sewer line and the City-owned 30” storm sewer line. For Repair Area 2, sewer work consists of a connection between the City-owned structure MH-86 and the Corps-owned structure MH-89. The connection will be installed with a new 24” reinforced concrete pipe (RCP) storm main. The material of MH-86 is a brick structure and will need to be removed and replaced with a standard concrete manhole. At both Repair Areas, the Corps-owned pressurized storm line will be abandoned and filled with grout from the headwall to the new work at the Repair Areas. We will also be removing the two damaged headwalls. Construction is proposed to be completed during the 2026 construction season.
Reference the attached documents for the solicitation, specification, and drawings associated with the requirement.
Responses should be sent to Contract Specialist, Stanley L. Bolton at stanley.l.bolton@usace.army.mil no later than the date time group listed in the attached solicitation.
Note: This action is a 100% Women Owned Small Business (WOSB) set aside.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Galena 2024 Event PL84-99 Flood Repair | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity