FY22 Brunswick Inner Harbor Maintenance Dredging

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912HN22B5002
Agency
ENDIST Savannah US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Z1KF Maintenance Of Dredging Facilities

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the U.S. Army Corps of Engineers Savannah District seeks maintenance dredging services for the Brunswick Inner Harbor in Georgia. Contractors will be required to furnish all personnel, equipment, and materials to dredge up to 500,000 cubic yards of sediment from specified areas of the East River, Turtle River, and South Brunswick River. Proposals were due by July 6th, 2022 and will be evaluated based on offerors' unit pricing to dredge quantities from each dredging area. The work must be completed within three months of award.

This requirement has been set aside for total small business participation. Maintenance dredging will be performed under NAICS code 237990 and PSC code R799 with an estimated budget between $1.1 million and $5.4 million. Two incumbent contractors - Southern Dredging Co. and Cottrell Contracting Corporation - submitted offers along with one undisclosed offeror. Dredged materials will be placed in the Andrews Island confined disposal area and all work must avoid a least tern nesting window from mid-April to mid-August to comply with environmental restrictions. Performance will be in Brunswick Harbor, Georgia located 70 statute miles south of Savannah Harbor.

Notice text

5 versions

Update #5 · Latest ·

Bid Opening Abstract has been posted. Please ensure you use the most recent conformed solicitation for submission of your bid. AMD 0002 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. AMD 0001 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors. The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River. Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36? with 1? of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36? with 5? of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36? with 1? of advanced maintenanceEast River, Turning Basin project depth is 36? with 1? of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5002' to obtain more details.*

Update #4 ·

AMD 0003 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. AMD 0002 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. AMD 0001 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors. The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River. Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36? with 1? of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36? with 5? of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36? with 1? of advanced maintenanceEast River, Turning Basin project depth is 36? with 1? of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5002' to obtain more details.*

Update #3 ·

AMD 0002 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid. AMD 0001 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid.The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36? with 1? of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36? with 5? of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36? with 1? of advanced maintenanceEast River, Turning Basin project depth is 36? with 1? of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5002' to obtain more details.*

Update #2 ·

AMD 0001 has been issued. Please ensure you use the most recent conformed solicitation for submission of your bid.The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36? with 1? of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36? with 5? of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36? with 1? of advanced maintenanceEast River, Turning Basin project depth is 36? with 1? of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5002' to obtain more details.*

Update #1 ·

The Brunswick Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be three months from time of award. Up to 500 thousand cubic yards of maintenance material is expected to be removed from the inner harbors.The work is located in Brunswick Harbor Georgia deep draft navigation projects. Brunswick Harbor is located 70 statute miles south of the Savannah Harbor, Georgia, and 25 statute miles north of Fernandina Harbor, Florida (FL), in Glynn County, Georgia. Brunswick Harbor Inner Harbor channel is 36 ft. deep MLLW and 400 ft. wide through St. Simon Sound, Brunswick River, Turtle River, South Brunswick River, and East River.Brunswick Harbor Inner Harbor is generally dredged in late summer or fall and takes approximately two months to complete. The dredging in the Brunswick Inner Harbor primarily takes place annually in the East River which includes the East River Turning Basin and the Transition Areas (stations 0+000 to 12+000) leading up to the turning basin and immediately upriver of the basin. The South Brunswick River (stations 0+000 to 7+000) in the Brunswick Inner Harbor is the other area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. The Lower Turtle River (station 35+000 to 36+000) in the Brunswick Inner Harbor is another area that may requires dredging and is primarily dredged when shoaling become problematic to navigation but is constantly monitored monthly. Approximately 295,000 cubic yards of material is removed from the East River annually, approximately 20,000 cubic yards of material is removed from the South Brunswick River and approximately 300 cubic yards from Lower Turtle River when dredged. The maintenance material removed from the Brunswick Inner Harbor is placed in the Andrews Island Dredged Material Containment Area located adjacent to both the East River and the South Brunswick River. Andrews Island is the only confined upland containment area in the Brunswick Inner Harbor.Advanced maintenance depths and locations for Brunswick Inner Harbor is as follows:East River, 0+000 to 2+500 project depth is 36? with 1? of advanced maintenanceEast River, 2+500 to 4+500 project depth is 36? with 5? of advanced maintenanceEast River, 4+500 to 6+250 project depth is 36? with 1? of advanced maintenanceEast River, Turning Basin project depth is 36? with 1? of advanced maintenanceEnvironmental windows limit the timing of dredging in the Brunswick Inner Harbors. Environmental restrictions on the Brunswick Inner Harbor include a Least Tern nesting window to where dredged material must not be placed in the Andrews Island confined upland disposal area between the middle of April through the middle of August. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912HN22B5002' to obtain more details.*

Attachments

Files attached to this notice, newest first
File Type Posted
C.04 -Abstract of Bidders (Form 1419) W912HB22B5002.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
FY22 Brunswick Inner Harbor Maintenance Dredging Award Award Notice
FY22 Brunswick Inner Harbor Maintenance Dredging This notice · Latest solicitation Solicitation
FY22 Brunswick Inner Harbor Maintenance Dredging Pre-Solicitation
FY22 Brunswick Inner Harbor Maintenance Dredging Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity