The U.S. Army Corps of Engineers, New York District, intends to solicit proposals for maintenance dredging of approximately 330,000 cubic yards of material from channels in the Newark Bay Federal Navigation Project in New Jersey. A contractor will be selected to dredge specified areas to depths between -40 to -50 feet MLLW using a mechanical dredge with a closed clamshell bucket. The contractor must furnish an upland placement site permitted by New Jersey DEP and transport dredged material to the site for dewatering and final placement. The solicitation is expected to be released in May or June 2021 with proposals due in June or July and award by August 2021. Work must be completed between August 2021 and February 2022, maintaining a production rate of at least 2,500 cubic yards per day.

There is no set-aside designated for this project. The primary NAICS code is 237990 and PSC code is D203 for dredging services. The work is estimated to cost between $25-100 million. Liquidated damages of $2,651 per calendar day will be assessed for delays beyond the completion date of February 2022.

Notice text

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the Newark Bay, New Jersey, Federal Navigation Project.  The dredged material would be processed and subsequently transported to and placed at a contractor furnished, State permitted upland placement site(s). The proposed maintenance dredging would remove approximately 330,000 cubic yards (CY) of selected critical shoals from the Main, South Elizabeth, Port Elizabeth, and Port Newark Pierhead Channels of Newark Bay.  Dredging in these channels would be required to depths of -40 feet, -45 feet, and -50 feet Mean Lower Low Water (MLLW) plus 1 foot allowable overdepth. The dredged material is expected to consist primarily of silt and clay.

Due to restrictions found in the New Jersey Department of Environmental Protection Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple barges and tugboats will be needed to perform the work during the dredging, dewatering and unloading operations. The dredged material would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the placement site is located. All necessary permits required for the dredged material placement will be provided by the contractor to the government.

The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government.  Bidders should consult the specifications for all submittal requirements.

Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and maintain an integrated production rate of at least 2,500 cubic yards per calendar day for the dredging, transportation, transfer, dewatering, processing, and final placement of the material.  The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.

Plans and specifications for the subject project are expected to be available in May or June 2021, with bid opening in June or July 2021.  It is the intention of the government to award in August 2021 and the proposed work is anticipated to take place between August 2021 and February 2022.  The work is estimated to cost between $25,000,000 and $100,000,000.

Liquidated damages of $2,651.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.

This is an unrestricted Procurement.
 

Notice history

Notice Type Posted
FY21 Maintenance Dredging of Newark Bay, New Jersey, Federal Navigation Project Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors