Furnish, Remove, Replace & Repair Piping B-129 Lift Station
Closed Solicitation Posted
- Solicitation number
- FA4460-24-Q-0249
- Agency
-
Air Mobility Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562998 All Other Miscellaneous Waste Management Services
- Place of performance
- Little Rock AFB, Arkansas 72099, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Mobility Command is seeking a contractor to furnish, remove, replace, and repair piping at Lift Station 129 at Little Rock Air Force Base. The contractor shall provide all qualified personnel, transportation, tools, equipment, materials, and services required to remove corroded piping and install new stainless-steel piping, check valves, and unions at the lift/pump station. The work must be completed within 5 days and in compliance with all federal, state, and local regulations. A site visit is scheduled for July 3rd, 2024 at 9am, and questions are due by July 5th, 2024 at 4pm.
This is a total small business set-aside solicitation with a North American Industry Classification System (NAICS) code of 562998 - All Other Miscellaneous Waste Management Services. The estimated period of performance is from the date of award through May 30, 2024. Responses are due by July 12, 2024 at 4:00 PM CT. The place of performance is Little Rock Air Force Base, AR 72099, USA.
Notice text
2 versions
Update #2 · Latest ·
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to remove corroded piping and install new stainless-steel piping, check valves and unions at lift/pump station 129. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all Federal, State and local regulations, codes and license requirements. Work shall be accomplished within 5 days from start.
Site visit will be: July 3rd, 2024 at 9am.
Questions are due: July 5th, 2024 at 4pm.
Offers are due July 24th, 2024 at 4pm.
Update #1 ·
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to remove corroded piping and install new stainless-steel piping, check valves and unions at lift/pump station 129. The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). Work shall be in compliance with all Federal, State and local regulations, codes and license requirements. Work shall be accomplished within 5 days from start.
Site visit will be: July 3rd, 2024 at 9am.
Questions are due: July 5th, 2024 at 4pm.
Files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Combo.pdf | ||
| Attachment 1_Provisions and Clauses.pdf | ||
| Attachment 3_Wage Determination.pdf | ||
| Attachment 2_PWS.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services | Air Mobility Command | Total Small Business | |
| Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome Piping | ACC Warren | Total Small Business | |
| R-410A LEAK DETECTORS (Bldgs 750, 751 & 768) | Air Mobility Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity