Fuel Flow Transmitter Test Stand
Closed Pre-Solicitation Posted
- Solicitation number
- FA8126
- Agency
- Air Force Sustainment Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335314 Relay and Industrial Control Manufacturing
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
- Points of contact
-
- Shanita Manuel shanita.manuel@us.af.mil (405) 739-5329
- Anthony Dollard anthony.dollard@us.af.mil (405) 739-4810
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Air Force Materiel Command Air Force Sustainment Center is seeking contractors to design, manufacture, and install a Fuel Flow Transmitter (FFT) Test Stand at Tinker Air Force Base in Oklahoma City. The test stand must be capable of testing fuel flow transmitters and flow valves for multiple aircraft platforms including A-10, B-1, B-52, C-130, KC-135, F-15, F-16, and F-22 aircraft. Key technical requirements include a semi-automated system with Human Machine Interface touchscreen capabilities, high flow and high-pressure testing functionality, and a 63"Wx50"Dx82"H test chamber with clear Plexiglas doors utilizing LabVIEW software and Siemens S7 Programmable Logic Controller. The contractor must provide comprehensive engineering, labor, materials, equipment, software, training, and meet strict technical standards including NFPA and ASME compliance for Class I, Division II environments. Contractor personnel must be US Citizens with no foreign participation permitted, and responses to this Sources Sought Synopsis are due by close of business on August 7, 2025, with submissions required via email to designated Air Force contacts.
This procurement does not utilize any set-aside designations and is open to both large and small businesses under NAICS code 335314 with a size standard of 750 employees. No incumbent contractors or current service providers are identified in the documentation. While specific contract values are not disclosed, the project structure includes multiple payment CLINs totaling 100% of costs with deliverables spanning approximately 18 months from contract award. The government anticipates issuing a one-time purchase order contract with a target delivery date no later than eighteen months after contract issuance. Joint ventures and teaming arrangements are encouraged, and the contractor must deliver one complete FFT Test Stand with full equipment, accessories, comprehensive training programs, factory acceptance testing, correlation testing, and extensive technical documentation including Level 3 drawings and operational manuals.
Notice text
Please see attached Sources Sought Synopsis (SSS) and DRAFT Statement of Work (SOW).
The SSS is a template. Please only answer the questions that pertain to the SOW based on the infrormation from the SOW.
Attachments
| File | Type | Posted |
|---|---|---|
| Sources Sought_FFT Test Stand.pdf | ||
| Statement of Work_FFT Test Stand.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity