FS Road 36 Culvert Replacements - Malheur National Forest

Award Notice Posted

Solicitation number
AG-04KK-S-10-0007
Agency
Awarded
to Choate Construction, LLC
Set-aside
HUBZone

Opportunity facts

Contract number
AG-04R3-C-10-0030 Federal IDV award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THE RESPONSE DATE FOR THIS SOLICITATION IS SEPTEMBER 8, 2010 AT 4:30 PM PST.

Update #1 ·

This is a construction project that replaces two existing culverts on Camp Creek with two new bottomless arch culverts, one with an 18 foot span and one with a 14 foot span. Work shall include excavation, backfill, furnishing and installation of culvert structures and associated pre-cast concrete footings, and associated stream and streambed reconstruction and streambed simulation. Pouring footings on site is acceptable as long as the time frame is met.

In addition, there is an Optional culvert site on Shoberg creek which will be awarded if funding becomes available.


Associated work shall include mobilization, construction of road approaches to the culvert, concrete foundation, and placement of borrow material and crushed aggregate rock.


Streambed simulation material shall be placed under the new arches and then shaped to simulate a natural channel. Stringent erosion and sediment control measures shall be required.


The roadway shall be re-established to the existing horizontal alignment and the aggregate surfacing replaced. All disturbed areas shall be seeded and mulched.



The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies necessary to perofrm all work required. 

THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT
AUGUST 9, 2010.

Files

File Type Posted
36rd_dwg2.pdf PDF
a. amend2.doc DOC document
a. amend1.doc DOC document
h. Experience.Questionnaire.doc DOC document
j. SF-25.pdf PDF
a. AG-04KK-S-10-0007.docx DOCX document
i. SF-24.pdf PDF
l. SF-25B.pdf PDF
b. BiddersPacket0007.docx DOCX document
f. OR2_dvb.mht MHT file
d. 36rd_dwg_rev.pdf PDF
k. SF-25A.pdf PDF
g. 19_r6_fs_6300_52.doc DOC document
c. FSSS.docx DOCX document
e. AOP Conservation Measures.docx DOCX document
Show all 15