Fort pierce harbor maintenance dredging, ST. Lucie county, florida

Closed Solicitation Posted

Solicitation number
W912EP26BA015
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Jacksonville District seeks a contractor for maintenance dredging of Fort Pierce Harbor in St. Lucie County, Florida, with excavated material placed onto Fort Pierce Beach, and bids due October 16, 2026, at 1:00 PM EDT. This is an unrestricted sealed bidding procurement (IFB, FAR Part 14) with no set-aside.

Place of performance is Fort Pierce Harbor and Fort Pierce Beach, St. Lucie County, Florida. Offshore pipeline access to the beach site is prohibited due to extensive hardbottom areas; offloading will occur inside the South Jetty of Fort Pierce Inlet. Staging area and beach access are located at the end of Seaway Drive and near the south jetty pumpout location.

Work includes but is not limited to maintenance dredging (145,000 cubic yards base contract), environmental and water quality monitoring, sea turtle trawl sweeping for hopper dredges, screening, beach tilling, beach fill quality control, construction support, vibration control and monitoring, and transportation and disposal of unacceptable material. The contractor must commence work within 60 calendar days of Notice to Proceed and complete work ready for use by May 30, 2027, with demobilization by June 30, 2027. The contract structure includes a base period and two option periods. Work is divided into a base contract and Options A and B.

The NAICS code is 237990, Other Heavy and Civil Engineering Construction. Small business size standard is $37 million. Target price range is $5,000,000 to $10,000,000. The contract is Firm-Fixed Price. Bid security must equal 20 percent of bid price or $3,000,000, whichever is less. Performance and payment bonds equal to total bid price are required within 10 days of award. Liquidated damages are $4,963 per calendar day of delay. Foreign contractors must submit IRS Form W-14 to address 2 percent federal excise tax withholding. A pre-bid site visit was held September 28, 2026, and a virtual pre-bid conference occurred September 29, 2026. Bids received from five contractors. Technical inquiries closed October 2, 2026. Contracting Officer: Timothy G. Humphrey; Contract Specialist: Meredith Gonzalez.

Notice text

3 versions

Update #3 · Latest ·

PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. BIDS DUE: 16 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 10 December 2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Update #2 ·

PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. BIDS DUE: 13 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 7 January 2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Update #1 ·

PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. BIDS DUE: 22 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 7 January 2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Fort pierce harbor maintenance dredging, ST. Lucie county, florida Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Pass-a-grille-pass, maintenance dredging, pinellas county, florida NAICS 237990 ENDIST Jacksonville Total Small Business
Jacksonville Harbor Maintenance Dredging 32202 · NAICS 237990 ENDIST Wilmington No set-aside
Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors