About this opportunity

The U.S. Army Corps of Engineers, Omaha District, is seeking contractors for a comprehensive 15kV switchgear replacement project at the Fort Peck Powerhouse 1 in Montana. The procurement involves removing and replacing 10 existing breaker cubicles with 5 new indoor breakers and 6 outdoor breakers, installing two 15kV reactor banks, upgrading cable trays, replacing lighting systems, and modifying control and protection systems throughout the facility. The project requires specialized electrical infrastructure work including metal-clad switchgear, instrumentation transformers, power and control cabling, protective relaying modifications, and bus differential protection systems. Contractors must be registered in the System for Award Management (SAM.gov) to access solicitation documents, and the work will be classified under NAICS code 237130 (Power and Communication Line and Related Structures Construction) with a $45 million size standard. The Request for Proposal is expected to be issued on July 7, 2025, with proposals due approximately one month later on August 7, 2025 at 2:00 PM Central Time. A site visit is planned approximately 10 days after the solicitation is posted, with all questions directed to Contract Specialist Margarette Wolfe.

This procurement does not include any set-aside designations and is open to all qualified contractors meeting the size standards. The estimated project value ranges between $10,000,000 and $25,000,000, reflecting the substantial scope of electrical infrastructure modernization required. The work involves replacing 10 existing breaker cubicles with 11 new breakers (5 indoor and 6 outdoor), along with installing two 15kV, 12MVA reactor banks that will provide MVAR support to transmission systems. The project operates under tight time constraints due to the critical role the power plant plays in supporting the western power grid, requiring careful coordination to minimize outages. The replacement will modernize the generator breakers that connect the facility's three generators to both eastern and western power grids, operating at 13.8kV despite being classified as 15kV equipment. No current incumbents or existing contractors are identified in the pre-solicitation notice.

Notice text

2 versions

Update #2 · Latest ·

UPDATED:  On or about 7 July 2025, the U.S. Army Corps of Engineers, Omaha District intends to issue a Request for Proposal (RFP) solicitation for “Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Upgrade”.

DESCRIPTION OF WORK:

The Fort Peck power plant has a series of 15kV class breakers that act as the generator breakers connecting the 3 generators in powerhouse 1 to the eastern and western power grids. Even through the breakers operate at 13.8kV their unique configuration requires switching orders from the transmission authority. Under the scope of this sources sought the 10 breaker cubicles and all associated buswork and equipment would be removed and replaced. This equipment will be replaced with 5 new breakers in the cubical rooms with associated equipment housed in additional cubicles. An additional 6 outdoor rated breakers will be installed in the switchyard. It is noted that the outage of the cubical room will be under tight time constraints given the support the power plant provides to the western power grid.

The complete 15 kV switchgear system will include:

  • Metal-clad 15kV switchgear and breakers with instrumentation transformers (current and rack-out potential transformers). This includes 3 generator breakers and 2 tie breakers with associated bus work.
  • 15kV outdoor circuit breakers with instrumentation transformers, 15kV disconnect switches and interconnecting 15kV aluminum bus system.
  • Power, protection, control, and annunciation cabling between switchgear and control room.
  • Control board modifications of the mimic bus, metering equipment and control switches.
  • Revisions to existing protective relaying and synchronization scheme.
  • 15kV Bus differential protection.
  • New 15kV, 4000A cable bus to connect the 15kV switchgear in Cubicle Room to the new 15kV breakers in the switchyard.
  • New feeders from the new 15kV breakers in the switchyard to transformers KX5A, KV7A, KZ2A, KY4A and the new reactors.
  • The KV7A feeder is required to be installed in a 15kV air rated underground tray system.

The scope will also include the installation of two new 15kV, 12MVA reactors banks. These banks will be connected to outdoor 15kV switchgear. They will be providing MVAR support to the transmission systems off the tertiary of the 115kV/230kV KV7A Autotransformer.

Additionally, the scope incudes the replacement of the cable trays in the cable tunnel, the replacement in kind of the lighting distribution panelboards and dry-type transformers in the switchyard, the installation of warning lights at the three entrance points to the Cubicle Room, and an evaluation of the existing lighting system in the Cubicle Room.

Update #1 ·

DESCRIPTION OF WORK:

The Fort Peck power plant has a series of 15kV class breakers that act as the generator breakers connecting the 3 generators in powerhouse 1 to the eastern and western power grids. Even through the breakers operate at 13.8kV their unique configuration requires switching orders from the transmission authority. Under the scope of this sources sought the 10 breaker cubicles and all associated buswork and equipment would be removed and replaced. This equipment will be replaced with 5 new breakers in the cubical rooms with associated equipment housed in additional cubicles. An additional 6 outdoor rated breakers will be installed in the switchyard. It is noted that the outage of the cubical room will be under tight time constraints given the support the power plant provides to the western power grid.

The complete 15 kV switchgear system will include:

  • Metal-clad 15kV switchgear and breakers with instrumentation transformers (current and rack-out potential transformers). This includes 3 generator breakers and 2 tie breakers with associated bus work.
  • 15kV outdoor circuit breakers with instrumentation transformers, 15kV disconnect switches and interconnecting 15kV aluminum bus system.
  • Power, protection, control, and annunciation cabling between switchgear and control room.
  • Control board modifications of the mimic bus, metering equipment and control switches.
  • Revisions to existing protective relaying and synchronization scheme.
  • 15kV Bus differential protection.
  • New 15kV, 4000A cable bus to connect the 15kV switchgear in Cubicle Room to the new 15kV breakers in the switchyard.
  • New feeders from the new 15kV breakers in the switchyard to transformers KX5A, KV7A, KZ2A, KY4A and the new reactors.
  • The KV7A feeder is required to be installed in a 15kV air rated underground tray system.

The scope will also include the installation of two new 15kV, 12MVA reactors banks. These banks will be connected to outdoor 15kV switchgear. They will be providing MVAR support to the transmission systems off the tertiary of the 115kV/230kV KV7A Autotransformer.

Additionally, the scope incudes the replacement of the cable trays in the cable tunnel, the replacement in kind of the lighting distribution panelboards and dry-type transformers in the switchyard, the installation of warning lights at the three entrance points to the Cubicle Room, and an evaluation of the existing lighting system in the Cubicle Room.

Files

Notice history

Notice Type Posted
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project Award Award Notice
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project Latest solicitation Solicitation
This notice Pre-Solicitation
Fort Peck Powerhouse 1 Cubicle Room 15kV Switchgear Replacement Project Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Tenkiller Hydropower Excitation System Replacement Gore, Oklahoma, United States · NAICS 237990 ENDIST Tulsa No set-aside
LLA Navigation Lock Switchgear Pomeroy, Washington 99347, United States · NAICS 238210 ENDIST Walla Walla Total Small Business
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business