Increase Contract Capacity Fort Bragg General Construction and Design-Build SATOC
Award Notice Posted
- Solicitation number
- W912HN-14-R-0034
- Agency
-
ENDIST Savannah
US Army Corps of Engineers, Department of Defense
- Awarded
- to G.l.h.c. Services Company
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912HN-17-D-0004 Federal IDV award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Usace District, Savannah Attn: Cesas-CT , 100 West Oglethorpe Ave Savannah GA 31401 US
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
The intent of this Justification and Approval is to increase contract capacity on the G.L.H.C. Services Construction Single Award Task Order Contract (SATOC) W912HN-17-D-0004 by $13 million from the current capacity of $95 million to $108 million. There will be no funds obligated directly due to this action to increase capacity; future task orders using the expanded capacity will be funded with Military Construction or Sustainment, Restoration and Modernization (SRM) funds, depending on the type of program supported..
Update #5 ·
Awarded Vendors: G.L.H.C. Services Company. Contract Award Dollar Amount: $95,000,000.00. Contract Award Date: 2017-03-31.
Update #4 ·
SYNOPSIS, Fort Bragg SATOC for General Construction.
Two-Phase Design-Build Single Award Task Order Contract (SATOC) for Construction type task orders. Task orders issued under this SATOC are anticipated to require performance of work in the South Atlantic Division (SAD).
This acquisition is being offered as a HUBZone Set Aside. The life of the basic contract is for a base period of two (2) years and three (3) one year options. The contractor which successfully receives an award will have a total contract capacity of $95M. The Government will use a best value Two-Phase Design-Build selection procedures in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $500K and $5M. Task orders issued under this SATOC will be firm-fixed price. All other resultant task orders may include options.
Description of work: Task orders placed under this SATOC shall be that of a design-build construction or construction only nature. Work is not solely restricted to repairs, renovations, alterations, and/or additions, but may also include new construction.
Evaluation Criteria: The Government will use a Performance Price Trade-off (PPT) evaluation process in rendering the best value decision for award of this contract. Only that offeror whose proposal provides the best overall value will be awarded the contract with a minimum guarantee of $2,500.00. The evaluation factors and their relative
importance for this solicitation and evaluation process are as follows:
PHASE I:
Non-cost Factors: FACTOR 1: PAST PERFORMANCE/EXPERIENCE: This factor is more important than Factor 2. FACTOR 2: FACTOR 2: DESIGN EXPERIENCE: This factor is less important than Factor 1.
PHASE II:
FACTOR 3: TECHNICAL APPROACH: This factor is equal in importance to FACTOR 1 (Past Performance) and more important than FACTOR 2 (Design Experience). Price is LESS important than the Technical Factors.
Price: All non-cost factors, when combined, are more important than Price.
Award will be made to the Offeror whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror.
This solicitation will be issued in electronic format only. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. This solicitation is anticipated to be available on or about 16 September 2014.
Note: The Response Date referenced under General Information does not refer to the PROPOSAL DUE DATE. Information on the PROPOSAL DUE DATE will be stated in the solicitation. Offerors must register in the System for Award Management (SAM) at www.sam.gov. After completing SAM, contractors and their subcontractors must register at www.fbo.gov in order to download RFP documents. Contractors with existing
FedTeds logins should be able to use their existing logins. In order to locate this solicitation, Contractors can go to FedBizOpps and search for the solicitation number at www.fbo.gov Contractors can register to be put on a plan holders list that others can access through the FedBizOpps site. It is the Offerors responsibility to check the
Internet address provided as necessary for any posted changes to this solicitation and all amendments.
.
Update #3 ·
SYNOPSIS, Fort Bragg SATOC for General Construction.
Two-Phase Design-Build Single Award Task Order Contract (SATOC) for Construction type task orders. Task orders issued under this SATOC are anticipated to require performance of work in the South Atlantic Division (SAD).
This acquisition is being offered as a HUBZone Set Aside. The life of the basic contract is for a base period of two (2) years and three (3) one year options. The contractor which successfully receives an award will have a total contract capacity of $95M. The Government will use a best value Two-Phase Design-Build selection procedures in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $500K and $5M. Task orders issued under this SATOC will be firm-fixed price. All other resultant task orders may include options.
Description of work: Task orders placed under this SATOC shall be that of a design-build construction or construction only nature. Work is not solely restricted to repairs, renovations, alterations, and/or additions, but may also include new construction.
Evaluation Criteria: The Government will use a Performance Price Trade-off (PPT) evaluation process in rendering the best value decision for award of this contract. Only that offeror whose proposal provides the best overall value will be awarded the contract with a minimum guarantee of $2,500.00. The evaluation factors and their relative
importance for this solicitation and evaluation process are as follows:
PHASE I:
Non-cost Factors: FACTOR 1: PAST PERFORMANCE/EXPERIENCE: This factor is more important than Factor 2. FACTOR 2: FACTOR 2: DESIGN EXPERIENCE: This factor is less important than Factor 1.
PHASE II:
FACTOR 3: TECHNICAL APPROACH: This factor is equal in importance to FACTOR 1 (Past Performance) and more important than FACTOR 2 (Design Experience). Price is LESS important than the Technical Factors.
Price: All non-cost factors, when combined, are more important than Price.
Award will be made to the Offeror whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror.
This solicitation will be issued in electronic format only. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. This solicitation is anticipated to be available on or about 16 September 2014.
Note: The Response Date referenced under General Information does not refer to the PROPOSAL DUE DATE. Information on the PROPOSAL DUE DATE will be stated in the solicitation. Offerors must register in the System for Award Management (SAM) at www.sam.gov. After completing SAM, contractors and their subcontractors must register at www.fbo.gov in order to download RFP documents. Contractors with existing
FedTeds logins should be able to use their existing logins. In order to locate this solicitation, Contractors can go to FedBizOpps and search for the solicitation number at www.fbo.gov Contractors can register to be put on a plan holders list that others can access through the FedBizOpps site. It is the Offerors responsibility to check the
Internet address provided as necessary for any posted changes to this solicitation and all amendments.
Update #2 ·
SYNOPSIS, Fort Bragg SATOC for General Construction.
Two-Phase Design-Build Single Award Task Order Contract (SATOC) for Construction type task orders. Task orders issued under this SATOC are anticipated to require performance of work in the South Atlantic Division (SAD).
This acquisition is being offered as a HUBZone Set Aside. The life of the basic contract is for a base period of two (2) years and three (3) one year options. The contractor which successfully receives an award will have a total contract capacity of $95M. The Government will use a best value Two-Phase Design-Build selection procedures in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $500K and $5M. Task orders issued under this SATOC will be firm-fixed price. All other resultant task orders may include options.
Description of work: Task orders placed under this SATOC shall be that of a design-build construction or construction only nature. Work is not solely restricted to repairs, renovations, alterations, and/or additions, but may also include new construction.
Evaluation Criteria: The Government will use a Performance Price Trade-off (PPT) evaluation process in rendering the best value decision for award of this contract. Only that offeror whose proposal provides the best overall value will be awarded the contract with a minimum guarantee of $2,500.00. The evaluation factors and their relative
importance for this solicitation and evaluation process are as follows:
PHASE I:
Non-cost Factors: FACTOR 1: PAST PERFORMANCE/EXPERIENCE: This factor is more important than Factor 2. FACTOR 2: FACTOR 2: DESIGN EXPERIENCE: This factor is less important than Factor 1.
PHASE II:
FACTOR 3: TECHNICAL APPROACH: This factor is equal in importance to FACTOR 1 (Past Performance) and more important than FACTOR 2 (Design Experience). Price is LESS important than the Technical Factors.
Price: All non-cost factors, when combined, are more important than Price.
Award will be made to the Offeror whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror.
This solicitation will be issued in electronic format only. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. This solicitation is anticipated to be available on or about 16 September 2014.
Note: The Response Date referenced under General Information does not refer to the PROPOSAL DUE DATE. Information on the PROPOSAL DUE DATE will be stated in the solicitation. Offerors must register in the System for Award Management (SAM) at www.sam.gov. After completing SAM, contractors and their subcontractors must register at www.fbo.gov in order to download RFP documents. Contractors with existing
FedTeds logins should be able to use their existing logins. In order to locate this solicitation, Contractors can go to FedBizOpps and search for the solicitation number at www.fbo.gov Contractors can register to be put on a plan holders list that others can access through the FedBizOpps site. It is the Offerors responsibility to check the
Internet address provided as necessary for any posted changes to this solicitation and all amendments.
.
Update #1 ·
SYNOPSIS, Fort Bragg SATOC for General Construction.
Two-Phase Design-Build Single Award Task Order Contract (SATOC) for Construction type task orders. Task orders issued under this SATOC are anticipated to require performance of work in the South Atlantic Division (SAD).
This acquisition is being offered as a HUBZone Set Aside. The life of the basic contract is for a base period of two (2) years and three (3) one year options. The contractor which successfully receives an award will have a total contract capacity of $95M. The Government will use a best value Two-Phase Design-Build selection procedures in accordance with Federal Acquisition Regulation (FAR) Part 36.301. The order limitation of task orders shall range between $500K and $5M. Task orders issued under this SATOC will be firm-fixed price. All other resultant task orders may include options.
Description of work: Task orders placed under this SATOC shall be that of a design-build construction or construction only nature. Work is not solely restricted to repairs, renovations, alterations, and/or additions, but may also include new construction.
Evaluation Criteria: The Government will use a Performance Price Trade-off (PPT) evaluation process in rendering the best value decision for award of this contract. Only that offeror whose proposal provides the best overall value will be awarded the contract with a minimum guarantee of $2,500.00. The evaluation factors and their relative
importance for this solicitation and evaluation process are as follows:
PHASE I:
Non-cost Factors: FACTOR 1: PAST PERFORMANCE/EXPERIENCE: This factor is more important than Factor 2. FACTOR 2: FACTOR 2: DESIGN EXPERIENCE: This factor is less important than Factor 1.
PHASE II:
FACTOR 3: TECHNICAL APPROACH: This factor is equal in importance to FACTOR 1 (Past Performance) and more important than FACTOR 2 (Design Experience). Price is LESS important than the Technical Factors.
Price: All non-cost factors, when combined, are more important than Price.
Award will be made to the Offeror whose technical submittal and price proposal contain the combination of criteria requested which offers the best overall value to the Government. Proposals shall include sufficient detailed information to allow complete evaluation. The Government reserves the right to reject any and all offers. Offerors are reminded that while the Government may elect to consider data obtained from other sources, the burden of proof of acceptability rests with the Offeror.
This solicitation will be issued in electronic format only. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. This solicitation is anticipated to be available on or about 16 September 2014.
Note: The Response Date referenced under General Information does not refer to the PROPOSAL DUE DATE. Information on the PROPOSAL DUE DATE will be stated in the solicitation. Offerors must register in the System for Award Management (SAM) at www.sam.gov. After completing SAM, contractors and their subcontractors must register at www.fbo.gov in order to download RFP documents. Contractors with existing
FedTeds logins should be able to use their existing logins. In order to locate this solicitation, Contractors can go to FedBizOpps and search for the solicitation number at www.fbo.gov Contractors can register to be put on a plan holders list that others can access through the FedBizOpps site. It is the Offerors responsibility to check the
Internet address provided as necessary for any posted changes to this solicitation and all amendments.
Files
| File | Type | Posted |
|---|---|---|
| SAS_Approved_Justification_and_Approval_Increase_Capacity_W912HN-17-D-0004_Redacted.pdf | ||
| amd6.pdf | ||
| 14R34.pdf | ||
| amd5.pdf | ||
| 14R34.pdf | ||
| 14R34.pdf | ||
| amd4.pdf | ||
| amd2.pdf | ||
| W912HN-14-R-0034_Released_Solicitation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity