14R34.pdf
PDF 3 MB Posted
- Solicitation number
- W912HN-14-R-0034
About this file
W912HN-14-R-0034 PHASE 2 AMD5 SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAS_Approved_Justification_and_Approval_Increase_Capacity_W912HN-17-D-0004_Redacted.pdf | ||
| amd6.pdf | ||
| 14R34.pdf | ||
| amd5.pdf | ||
| amd4.pdf | ||
| 14R34.pdf | ||
| amd2.pdf | ||
| W912HN-14-R-0034_Released_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(Revised by Amendment 0003)
Fort Bragg, North Carolina
Solicitation Number
W912HN-14-R-0034
SATOC
Sections 00010 through 00800 and Technical Provisions - Division 01 December 2014
*3 PHASE TWO OF TWO PHASE
DESIGN/BUILD SUBMITTAL PROCEDURE
This acquisition is being offered as a HUBZone Set Aside. For this procurement, only HUBZone Small Businesses are eligible to submit offers to this solicitation.
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
W912HN-14-R-0034-0004
A. TWO PHASE DESIGN/BUILD GENERAL CONSTRUCTION SINGLE AWARD TASK ORDER CONTRACT (SATOC) PRIMARILY IN NORTH CAROLINA; how ever, performance of w ork may be required w ithin the South Atlantic Division Area of Operations (North Carolina, South Carolina, Georgia, Florida, and Alabama).
B. This acquisition is being offered as a HUBZone Set Aside. For this procurement, only HUBZone Small Businesses are eligible to submit offers to this solicitation.
C. This solicitation is Idefinite Delivery, Indefinite Quantiy using Tw o-Phase Design/Build Selection Procedures in accordance w ith Federal Acquisition Regulation (FAR) 36.303. The proposal of the successful Offeror shall be incorporated by reference upon aw ard of the contrat.
The Government w ill evaluate Phase 1, the performance capability proposals in accordance w ith the criteria described herein and w ill select up to f ive (5) of the highest rated Offerors to participate in Phase 2.
D. The total capacity of the contract is $95,000,000. The aw arded contract w ill be for a base period of tw o (2) years w ith three (3) one-year option periods.
E. The order size of each task order issued against this SATOC shall range betw een $500,000 and $5,000,000.
F. The North American Industry Classif ication System (NAICS) Code is 236220.
JENNIFER K SLATE 912-652-5539
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
23-Dec-2014
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________ Schedule
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________11 Jun 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT SAVANNAH
ATTN: CT/JENNIFER SLATE
100 W OGLETHORPE AVE
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE W912HN
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
SEE SCHEDULE
SEE SCHEDULE
SAVANNAH GA 31401
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
912/652-6061FAX:TEL: 912/652-5539 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912HN-14-R-0034
Section SF 30 - BLOCK 14 CONTINUATION PAGE
AMENDMENT 1
A. CONTRACT CHANGES: See Block 14, SF 30
B. TECHNICAL SPECIFICATION CHANGES: The added sections listed below (added by Amendment No. 0001) are hereby added to and made a part of the solicitation.
Added Sections Cover Sheet Attachment 1 to Section 00800 Project Table of Contents 01 08 00 01 08 50 01 32 01.00 10 01 33 00 01 3316 01 34 00 01 35 26 01 42 00 01 45 00.00 10 01 45 00.10 10 01 50 00 01 57 20.00 10 01 57 23 01 62 35 01 74 19 01 78 00 01 78 23
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
AMENDMENT 3
A. CONTRACT CHANGES:
B. TECHNICAL SPECIFICATION CHANGES: The revised and added sections listed below (revised and added by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.
Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section Added Section Cover Sheet Appendix A
*Please note that Appendix A was NOT added in Amendment 3. This was a typo on the part of the Government. Appendix A was provided initially with release of the Phase 1 solicitation.*
AMENDMENT 4
A. CONTRACT CHANGES:
B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No. 0004) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section 01 08 00
Section 00010 - Solicitation Contract Form
NOTES TO OFFERORS
FORT BRAGG SATOC
W912HN-14-R-0034
SECTION 00010 - NOTES TO OFFERORS
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE
LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL
NOT BE ACCEPTED. HAND CARRIED PROPOSAL SUBMISSION IS NOT
AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS
a. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The Price Proposal and Technical Proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN-14-R-0034_COMPANY NAME_VOLUME I
W912HN-14-R-0034_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).
When completing the information for transmittal at the AMRDEC SAFE website, you will be asked to enter e-mail addresses for the recipients. When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is Ms. Jennifer Casey, whose e-mail address is Jennifer.S.Casey@usace.army.mil. The Contracting Officer for this project is Ms. Nina Crow, whose e-mail address is Nina.G.Crow@usace.army.mil.
These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.
Proposal Due Date and Time:
Request For Proposal No: W912HN-14-R-0034 Due Date of Proposal: June 11, 2015 Time by which Proposals are Due: 2:00 P.M. (E.T.)
Title of Project: FORT BRAGG SATOC
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
Hints: Please submit single PDF files (ZIP is not preferred). Additionally, use of Mozilla Firefox web browser may allow for a quicker upload than that of Windows Internet Explorer. However, the Government cannot guarantee that offerors will have more success utilizing any particular browser.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.
QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
Please see Section 01 45 01 for additional information.
WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access.
A prospective vendor who submits a comment or question will receive an acknowledgement via e-mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
W912HN-14-R-0034
Fort Bragg SATOC Bidder Inquiry Key: Z4T6JY-6N75G5
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. E-mail. Enter the e-mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E-mail, Secret
Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above.
4. E-mail. Enter the e-mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
SCHEDULE A NOTES TO OFFERORS
FORT BRAGG GENERAL CONSTRUCTION SATOC
SCHEDULE A CAPACITY/COEFFICIENT
BID SCHEDULE
**NOTE: Total contract capacity for base and all option periods is $95,000,000.00. Total capacity may be used in the Base Period, Option Period 1 or 2 or any combination thereof.
ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Fort Bragg SATOC $95,000,000 LS
COEFFICIENT** SEE SCHEDULE A NOTES**
Location Estimated Capacity
Value Coefficient***
Calculated Amount
Fort Bragg/Pope AF $85,000,000.00 X =
Seymour Johnson $2,250,000.00 X =
Camp MacKall $1,000,000.00 X =
MOTSU $250,000.00 X =
Fort Jackson $250,000.00 X =
Fort Gordon $2,000,000.00 X =
Fort Benning $2,000,000.00 X =
Fort Stewart $1,000,000.00 X =
Hunter AAF $250,000.00 X =
Gillem Enclave $250,000.00 X =
Warner Robins AFB $250,000.00 X =
Moody AFB $250,000.00 X =
Dobbins AFB $250,000.00 X =
Total Calculated Amount
These coefficients are to be used on all task orders and modifications written during the life of the contract.
*** Proposed Area Coefficient(s) shall be represented in decimal format (e.g. 4.0, 0.20, 8.0 or 0.08)
HOME OFFICE OVERHEAD (HOOH): The following will be used for the 2 year base period:
Home Office Overhead – 2 Year Base Period ____________%
TOTAL FOR ITEM 0001 (Total Calculated Amount X HOOH) = ____________________
ITEM NO SUPPLIES SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Option Period 1 1 LS
COEFFICIENT: **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**
Home Office Overhead – Option Period 1: ____________%
0003 Option Period 2 1 LS
COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**
Home Office Overhead – Option Period 2: ____________%
0003 Option Period 3 1 LS
COEFFICIENT **Coefficients awarded in CLIN 0001 WILL NOT change and will remain in full effect**
Home Office Overhead – Option Period 3: ____________%
NON-PRICED ITEMS: The following percentages will be used throughout the life of the contract:
Field Office Overhead ________________%
Home Office Overhead ________________%
Bond Premium ________________%
PROFIT for non-priced items: Detailed information regarding the offeror’s method for estimating and proposing profit shall be required to determine appropriateness of proposed rate. Contractor shall be prepared to discuss: 1) Degree of Risk; 2) Relative Difficulty of Work; 3) Size of Job; 4) Period of Performance; 5) Contractor’s Investment; 6) Assistance by the Government and 7) Subcontracting.
1. COEFFICIENT
1.1. The current year edition of the R.S. Means Construction Cost Data is hereby incorporated by reference and the current edition at the beginning of each calendar year will be incorporated into the contract for the duration of this contract including option periods. The Offeror shall use the Electronic Version of R. S. Means Building Professional’s Package which includes Building Construction Cost Data, Mechanical Cost Data, Plumbing Cost Data, Electric Cost Data and the Square Foot Cost. Offeror must purchase “Assemblies Cost Data” separately. For renovation projects, the offeror shall use the Repair and Remodeling Cost Data. The Offeror may use the quarterly pricing updates to the R.S. Means. Offeror shall use Means Cost Works Estimator to prepare and submit task order proposals. These items may be obtained from the R.S. Means Company at www.rsmeans.reedconstructiondata.com or 1-800-334-3509.
1.2. Area Coefficient: The Offeror’s coefficients shall be represented as a percentage “increase” or “decrease” to the R.S. Means, without home office & field office overhead and profit. The “Total Bare Costs” column in the R.S. Means will be used. The Offeror’s coefficient SHALL contain all allowable costs EXCEPT PROFIT, HOME AND FIELD OFFICE OVERHEAD. Home Office Overhead will be set by this contract. Detailed information regarding the offeror’s method for estimating and proposing profit shall be required to determine appropriateness of proposed rate. Contractor shall be prepared to discuss
1) Degree of Risk; 2) Relative Difficulty of Work; 3) Size of Job; 4) Period of Performance; 5) Contractor’s Investment; 6) Assistance by the Government and 7) Subcontracting.
1.3. Items Included in Area Coefficient:
1.3.1. There will be NO allowances for any additional costs beyond what the Area Coefficients covers; therefore the coefficients must be all inclusive of costs incurred.
1.3.1.1 The following items from R.S. Means will not be paid separately and shall be included in the Area Coefficient:
Cost Division 1 – General Requirements
• 01 11 31.20 - Construction Management Fees
• 01 21 16.50 - Contingencies
• 01 21 55.50 0010 thru 01 21 55.50 0010 1200 - Job Condition Allowances
• 01 21 57 – Overtime Allowances
• 01 21 61 – Cost Indexes
• 01 21 63 – Taxes (See paragraph 2.3.4 for exceptions)
• 01 31 13.30 - Insurance
• 01 31 13.50 – General Contractor’s Mark-up
• 01 31 13.90 – Performance Bond 01 41 26 – Permits 01 74 13.20 0050 (Daily clean-up)
• 01 74 13.20 0020 & 40 - After job completion Min & Max 01 54 39 70 0020 – Construction Equipment Small Tools Specification Section 01 50 00 – The Project Sign Only and The Safety Signs
Only
Cost Adjustments The cost adjustment factor can only be applied for vertical work that exceeds 15 feet.
The cost adjustments for security can only be applied if the workers are required to be escorted while working in a secured compound.
1.3.2. Offeror WILL NOT be allowed to use the following items from the R.S. Means.
• 01 31 13.40 – Main Office Expense. This item should be taken into consideration when proposing the Home Office Overhead rate.
• 01 31 13.60 – Installing Contractor’s Main Office Overhead. Overhead will be negotiated and itemized for each individual task order.
• 01 31 13.80 – Overhead and Profit. Profit will be computed using the Weighted
Guidelines.
1.3.3. The following line items will only apply after completion of a new facility or interior facility rehabilitation:
• 01 74 13.20 0100 – Final by GC at end of the job
1.3.4. Taxes. For the state of North Carolina, the Government will pay sales taxes for material cost only. The appropriate sales tax will be calculated on the material bare cost after applying the area coefficient.
1.4. Non-Priced Items. Items of work not covered in the R.S. Means, will be considered Non- Priced Items, if agreed upon by both the government and the contractor.
1.4.1. All proposed non-priced items shall be separately identified and priced. Proposed non- priced items must be documented by supporting information as specified below:
(a) A minimum of THREE (3) competitive contractor quotes
(or) if requested and approved by the Contracting Officer,
(b) A complete breakout of material, labor, and other direct or indirect costs required to complete the specific item. Costs shall be segregated and proposed on a DA Form 5413-R, “Construction Cost Breakdown’, or other format approved by the contracting officer.
1.4.1.1. Offeror shall provide a written justification for price/subcontractor/vendor selected.
1.4.2. Non-priced items proposed by the offeror will be fully negotiated prior to award.
1.4.3. The Area Coefficient SHALL NOT be applied to non-priced items. However, the Home Office Overhead rate fixed in the contract will be used and will not change. Home Office Overhead rate and Non-Priced mark-ups fixed in the contract shall be used and will not change.
1.4.3.1. Offeror shall be prepared to negotiate area coefficients for locations within SAD not addressed in schedule A.
1.5. Work to be performed by the prime contractor and subcontractor(s) shall be priced using the “BARE COSTS TOTAL” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs. Work performed by the Professional Consultant (designer (s)) shall be priced using the “TOTAL INCL O&P” column in R.S. Means. The appropriate area coefficient will then be applied to the total of these costs.
1.6. Union Rates will be used for pricing Labor. Offeror shall consider any Davis Bacon wage rate increases in their proposed area coefficient.
1.7. The Area Coefficient will apply for the two (2) year base period and three (3) option periods of the contract or up to the maximum capacity of $95,000,000.00
2. TASK ORDER PROPOSALS, SCHEDULE B.
SCHEDULE B: SAMPLE PROJECT
BID SCHEDULE (Total with Mark-ups)
Summary Total With Mark-ups
CLIN 0001 Base: Construct Admin Building $
CLIN 0002 Base: Design Admin Building $
Total Proposed Fee: $
PROJECT BID SCHEDULE
Item Number Item Description TOTAL
Base Bid: Design/Construct Administration Building
Assemblies
A10 - Foundations $
B20 - Exterior Enclosure $
B30 - Roofing $
C10 - Interior Construction $
C30 - Interior Finishes $
D20 - Plumbing $
D30 - HVAC $
D50 - Electrical $
G10 - Site Preparation $
G30 - Site Mechanical Utilities $
Unit
Division 1: General Requirements $
Division 13: Special Construction $
Division 23: Heating Ventilation and Air Conditioning $
Division 26: Electrical $
Division 31: Earthwork $
COST BREAKDOWN
ADMINSTRATION BUILDING, FORT BRAGG, NC
Prime Total Direct Cost (DC) = (ACT + Sales Tax + FOOH) $
Home Office Overhead (HOOH) = (DC X % HOOH) $
Adjusted Direct Cost (ADC) = (HOOH + DC) $
Construction Sub-Total (CST) = (ADC + NP) $
Profit (CST X % Profit) $
Construction Total = (CST + Profit) $
______% Coefficient
Sales Tax (Material Cost Only in NC)
_____% HOOH
_____% Profit
Total Proposed Fee = (Construction Total + Design Fee)
Total Direct Cost (TDC) = (Prime Work + Sub Work)
______% Design Design Fee
Non Priced Items (NP) - Provide Quotes
Field Office Overhead (FOOH) - Provide Itemized Breakout
Area Coefficient Total (ACT) = (TDC X %Area Coefficient)
Notes to the Contractor:
1) Contractor shall submit all supporting documents: cost works, non-priced, competitive bids, etc.)
2) * Items identified as Modernization are subject to a statutory limit of $750,000.00.
2.1. The offeror shall prepare a detailed proposal by identifying tasks, refining quantities of both pre-priced and non-priced items, pricing non-priced items, developing performance times and preparing a completed proposal document for submission to the contracting officer. The offeror shall field verify all available as-builts as well as existing field conditions.
2.2. Where square foot costs are provided in the R.S. Means, those costs shall take precedence over cost for assembly cost and individual cost. Likewise, where assembly costs are provided in the R.S. Means, those costs shall take precedence over costs for individual items unless otherwise approved by the contracting officer.
2.3. Quantities used on individual task order proposals shall be taken from field measurements or design plan, as appropriate, without allowance for waste unless the R.S. Means authorizes under individual items. Waste of excessive material quantities is an incidental cost and is included in the coefficient.
2.4. Costs of expendable supplies, lubricants, wear and tear on tools, are included in the installation/construction cost in the R.S. Means cost of construction and will not be paid separately.
2.5. Equipment Rental may be considered only if the required item is not included in the crew descriptions for the R.S. Means line item that describe the work, unless approved by the contracting officer.
3. TASK ORDER CALCULATIONS.
3.1 . Calculating Total Cost.
4.1.1. In calculating the total cost, R.S. Means, the area coefficient (AC), U.S. National Averages (USNA), Home Office Overhead (HOOH), Field Office Overhead (FOOH) and Profit are all considered. When applicable, design costs and NC state taxes are also considered.
3.1.2. Using R.S. Means Database:
3.1.2.1. The offeror shall use the electronic version in developing a proposal. Each proposal will be generated from CostWorks using a CSI Number: The R.S. Means database consists of a MasterFormat System of classifications and numbering developed by the Construction Specification Institute (CSI). Each line item in the database has its own unique CSI identifier.
The offeror shall use the electronic version in developing a proposal, selecting the appropriate CSI number(s) in the RS Means Cost works program for each individual item. R.S. Means is updated quarterly each year. The offeror must select the location. Typically, the City Cost Indexes are electronically applied to the CSI items. However, for this contract, the offeror is required to use the USNA. The example shown below is for informational purposes only:
3.1.2.2. Example: Design and construct a 10,000 SF Building: Combination Warehouse & Offices (typical for 10 locations): 125’x 80’x20’H, masonry structure.
A. Install a 8’x8’ (Commercial) wood Overhead Door in each building; including trim, hardware, and painting. Doors shall also have electric openers (including hardware) installed.
B. Install an10 Exterior wood doors (3’x6’-8”), frames, trim and hardware in each structure. Doors shall be weatherstripped, stained and finished.
C. Each building (10) shall have its front face (125’x20’) painted (2 coats exterior latex)
D. Install 10 Wrought iron security Doors, including hardware, in same opening as exterior wood doors.
NOTE: Example provided is only a small representation of all items needed for a complete Task Order Proposal.
Using the appropriate electronic version of R.S. Means the offeror shall select the appropriate CSI line item number. Below shows the CSI numbers utilizing the “Bare Costs”:
CSI Number Description Unit Bare
Material
Bare
Labor
Bare
Equip
Bare
Total
50 17 0010 Warehouse & Office Combination, complete with HVAC & plumbing
SF ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ $79.50
B2030 410
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated
EA
$1,577.2
$1,006.6
$0
$2,583.9
B2030 240
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
EA $783.96 $376.66 $0
$1,160.6
09 91 13.90
0580 & 0590
Painting Exterior CMU Walls:
Spray 2 coats exterior latex SF $0.10 $0.23 $0 $0.33
NOTE: Square Foot Costs were used for Warehouse Building and Assembly Costs were used for both the Overhead and Exterior Doors
Once the CSI number is selected, the offeror will input the appropriate quantity. See below.
Qty CSI Number Description Unit Bare
Material
Bare
Labor
Bare
Equip Bare Total
100,00
0 50 17 0010
Warehouse & Office Combination, complete with HVAC & plumbing
(2510 @ 10,000 SF each)
SF ‐‐‐‐ ‐‐‐‐ ‐‐‐‐ $7,950,000.00
10 B2030 410
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated
EA
$15,772.8
$10,066.4
$0 $25,839.20
10 B2030 240
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
EA $7,839.60 $3766.60 $0 $11,606.20
25,000 09 91 13.90
0580 & 0590 Painting Exterior CMU Walls: Spray
2 coats exterior latex (125’X20’)
SF $2,500.00 $5,750.00 $0 $8,250.00
3.1.3. Applying the Area Coefficient:
3.1.3.1. Next sum all of the Bare Cost Totals for all of the CSI items to get a Total Direct Cost.
Then apply the Area Coefficient to get the Area Coefficient Total for the task order.
Net Sum of all Bare Cost Totals = $7,950,000.00 (Warehouse) + $25,839.20 (Overhead Door) + $11,606.20 (Exterior Doors) + $8,250.00 (Painting) = $8,095,774.907$7,995,695.40 Then the proposed Area Coefficient is applied.
Area Coefficient Total = Net Sum of all Bare Cost Totals X Area Coefficient
For Example A: If your Area Coefficient is a net decrease of 0.95, your Area Coefficient Total would be: $8,095,774.90 7,995,695.40 X 0.95 = $7,595,910.63 $7,690,986.16
Or
For Example B: If your Area Coefficient is a net increase of 1.20, your Area Coefficient Total would be: $7,995,695.40 8,095,774.90 X 1.20 = $9,594,834.48 $9,714,929.88
3.1.4. Applying Sales Taxes (where applicable):
3.1.4.1. Only for projects in North Carolina, offeror will apply state taxes pertinent to that city/county to material costs only. Taxes will be calculated and added to the Area Coefficient Total to calculate the Adjusted Area Coefficient Subtotal:
For example Sales Taxes are 7%:
Description Bare
Material
Sales Tax
(7%)
Wood overhead door, commercial sectional, including track, door, hardware and trim electrically operated
$15,772.80 $1,104.10
Single solid wood colonial door, 6 panel fir, 6’‐8” X 3’‐0” with food frame and trim. Stained & finished including hardware and weatherstripping
$7,839.60 $548.77
Spray painting siding: Primer &
2 coats exterior latex $2,500.00 $175.00
Total Taxes $1,827.87
Adjusted Area Coefficient Subtotal = Area Coefficient Total + Total Taxes Example A: $7,595,910.63 7,690,986.16 + $1,827.87 = $7,597,738.50 7,692,814.02
Example B: $9,594,834.48 $9,714,929.88 + $1,827.87 = $9,596,662.35 9,716,757.75
3.1.65. Applying Field Office Overhead (FOOH):
3.1.65.1. Next offeror will submit an itemized list of FOOH expenses utilizing R.S. Means.
FOOH will be negotiated and added to the Adjusted Area Coefficient SubtTotal to calculate the Prime Total Direct Cost (PTDC):
For example if your (negotiated) FOOH is $5,000:
PTDC = Adjusted Area Coefficient T Subtotal + FOOH Example A: $7,597,738.50 7,699,504.02 + $5,000 = $7,602,738.50 7,704,504.02 Example B: $9,596,662.35 9,723,447.75 + $5,000 = $9,601,662.35 9,728,447.75
3.1.76. Applying Home Office Overhead (HOOH):
3.1.76.1. After calculating the Subtotal FOOH, apply the (fixed) HOOH rate will be calculated.
For this Example if your HOOH is 5%:
Construction Subtotal = PTDC x HOOH = Adjusted DC
Example A: $7,602,738.50 7,704,504.02 x 5% = ($380,136.92385,225.20) + $7,602,738.50704,504.02 = $7,982,875.428,089,729.22 Example B: $9,601,662.35 9,728,447.75 x 5% = ($480,083.12486,422.39) + $9,601,662.35 9,728,447.75 = $10,081,745.4710,214,870.14
3.1.7. Including Non-Priced Item:
3.1.7.1. Next offeror will submit three (3) itemized quotes list for items not located in R.S.
Means. Non-Priced Items will be negotiated and added to the Adjusted DC:
The Wrought Iron Screen was not found in R.S. Means, therefore, three quotes were submitted.
Quote Description Qty Unit Materials Installation Unit Cost Total
1 Wrought Iron Security
Doors, hardware not
10 EA $333.00 $89.00 $422.00 $4,220.00
included in cost
(3’X6’8”) Wrought Iron
Security Doors, installed; including hardware
10 EA $540.00 $129.00 $669.00 $6,690.00
Wrought Iron Security
Doors, (3’X 6’‐8”) including hardware
10 EA $718.00 $119.00 $837.00 $8,370.00
Quote Number 1 was not selected because the price did not include hardware; Quote Number 2 was selected because all scope requirements were met; Quote Number 3 was not selected, although the scope requirements were met, the price was higher than Quote Number 2.
Costs for Non-Priced Items shall include the binding mark-ups for Field Office Overhead, Home Office Overhead and Bond Premium.
Assume binding mark-ups for the non-priced items are FOOH (5%), HOOH (10%) and Bond Premium (1%):
Assume Quote Number 2 was selected:
Wrought Iron Security Doors = $6,690.00 Field Office Overhead is 5%: $6,690.00 x 5% = $334.50 $7,024.50 Home Office Overhead is 10%: $7,024.50 x 10% = 702.45 $7,726.95 Bond Premium is 1%: $7,726.95 x 1% = $77.27 Total for Non-Priced Item (w/mark-ups) = $7,804.22
Construction Subtotal = (Adjusted DC + Non-Priced Item(s) Example A: $7,692,814.02 7,982,875.42 + $6,690.007,804.22 = $7,699,504.02 7,990,679.64 Example B: $9,716,757.75 10,081,745.47 + $6,690.007,804.22 = $9,723,447.75 10,089,549.69
3.1.8. Applying Profit:
3.1.8.1. After calculating the Construction Subtotal the (negotiated) Profit will be applied to achieve the Construction Total for the Task Order.
For this Example if your Profit is 8%:
Construction Total = (Construction Subtotal x Profit) Example A: $7,990,679.64 8,089,729.22 x 8% = ($639,254.37647,178.34) +
$7,990,679.64 8,089,729.22 = $8,629,934.01 8,736,907.56 [$8,629,9348,736,908]*
Example B: $10,089,549.69 10,214,870.14 x 8% = ($807,163.97817,189.61) + $10,089,549.69 10,214,870.14= $10,896,713.66 11,032,059.75 [$10,896,71411,032,060]*
*For ease of calculations, please round final numbers.
3.1.9. Calculating Design Fee:
3.1.9.1. After achieving the Construction Total for the Task Order, Design Fee will be calculated as a percentage of the Construction Total. Design Fees are located in R.S. Means and are based on a percentage of the construction cost. These fees will be negotiated for each Task Order and added as a separate line item on the Offerors proposal.
For this Example if your Design Fee is 4% of the construction cost then the design cost is calculated as:
Design Costs = Construction Total x Design Fee % Example A: $8,629,934.01 8,736,907.56 x 4% = $345,197.36 349,476.30 [$345,197]
[$349,476]* Example B: $10,896,713.66 11,032,059.75 x 4% = $435,868.55 441,282.39 [$435,869]
[$441,282]*
*For ease of calculations, please round final numbers.
3.1.10. Total Proposed Fee: The total is calculated by adding the Construction Total + Design Fee.
Example A: $8,629,934.01 + $345,197.36 = $8,975,131.37 [$8,975,131]*
Example B: $10,896,713.66 + $435,868.55 = $11,332,582.21 [$11,332,582]*
*For ease or calculations, please round final numbers.
4. HOME OFFICE OVERHEAD
4.1. Home Office Overhead shall be represented as a percentage increase to the Applied Coefficient Total. The proposed rate will apply to ALL task orders issued under this contract.
4.2. Offeror’s shall propose a Home Office Overhead rate for the two (2) year base period and the three 1 year option periods. The rates awarded will be locked-in for the life of the contract and will not change.
5. PRICE EVALUATION PROCEDURE
5.1. Area Coefficient Estimated Capacity Values are identified for each location in the following table. The Estimated Capacity Value will be multiplied by the corresponding proposed area coefficient to determine a total for each location. These Applied Area Coefficient Totals will then be multiplied by the Home Office Overhead Rate for the Base Period only. These Evaluated Totals will then be added together to obtain the total evaluated price for Schedule A.
5.2. The Home Office Overhead Rates proposed for Option Periods 1, 2 a n d 3 WILL NOT be included in the evaluated price, but will be evaluated to ensure REASONABLENESS
ONLY.
5.3. An EXAMPLE price evaluation chart for Schedule A follows:
EXAMPLE PRICE EVALUATION PROCEDURE
Base Est Capacity
Value
Proposed Area
Coefficient*
Appied Area Coeffcient Total
Home Office OH @ 8.50%**
Evaluated Total
Fort Bragg/Pope AF $82,650,000.00 1.10 $90,915,000.00 $7,727,775.00 $98,642,775.00
Seymour Johnson $950,000.00 0.84 $798,000.00 $67,830.00 $865,830.00
Camp MacKall $475,000.00 1.00 $475,000.00 $40,375.00 $515,375.00
MOTSU $1,900,000.00 1.05 $1,995,000.00 $169,575.00 $2,164,575.00
Fort Jackson $1,900,000.00 0.96 $1,824,000.00 $155,040.00 $1,979,040.00
Fort Gordon $712,500.00 0.87 $619,875.00 $52,689.38 $672,564.38
Fort Benning $475,000.00 1.10 $522,500.00 $44,412.50 $566,912.50
Fort Stewart $475,000.00 1.20 $570,000.00 $48,450.00 $618,450.00
Hunter AAF $237,500.00 0.97 $230,375.00 $19,581.88 $249,956.88
Gillem Enclave $237,500.00 1.00 $237,500.00 $20,187.50 $257,687.50
Warner Robins AFB $237,500.00 1.00 $237,500.00 $20,187.50 $257,687.50
Moody AFB $237,500.00 0.95 $225,625.00 $19,178.13 $244,803.13
Dobbins AFB $237,500.00 0.82 $194,750.00 $16,553.75 $211,303.75
$107,246,960.63
AREA COEFFICIENTS
TOTAL EVALUATED PRICE SCHEDULE A
* The Coefficients and Home Office Overhead Rate in this chart are EXAMPLES ONLY.
‘Proposed Area Coefficient(s)’ shall be represented in decimal format.
** ‘Home Office OH’ shall be represented as a percentage.
DESCRIPTION/SPECS/WORK STATEMENT
1. DESCRIPTION OF WORK:
1.1 Single Award Task Order Contract (SATOC) for General Construction and Design/Build Construction is intended to provide rapid response for: new construction, upgrades, maintenance or repair of situations relating, but not limited to, site work, interior/exterior finishes, architectural woodwork, electrical, mechanical, plumbing, structural and fire suppression system of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Work may include, but not be limited to:
1.2. General Construction:
1.2.1. New construction, renovation, repair and/or upgrades of all permanent structures to include but not be limited to: interior/exterior finishes (floors, ceilings, doors, windows, paint, siding, etc.), architectural woodwork (molding, cabinets, etc.), electrical systems (conduit, wire, breakers, panels, transformers, emergency generators, interior/exterior high and low voltage electrical power lines, interior/exterior lights, emergency shut offs, lighting protection, etc.), mechanical systems (HVAC instrumentation & controls, HVAC control systems, commissioning, decommissioning, retro-commissioning, total building commissioning, gas lines, insulation, acoustical systems, underground high temperature lines, boilers, chillers & chilled water distribution systems, variable frequency controls on HVAC systems, etc.), plumbing systems (sanitary sewer, domestic water lines, backflow preventers, pumps, water coolers, etc.), fire suppression systems (fire alarm systems, sprinkler system, etc.), communication systems (mass notification system, IT lines, telephone & data lines, etc.), renewable energy systems (solar panels, ground source heat pumps, etc.), roofing systems (various roof types, gutters, downspouts, flashing, fascia, soffit, etc.), structural systems, fencing, gates, conduit and cables for security systems, Anti-Terrorism Force Protection systems (site layout, security design, building construction, threat development, level of protection, design constraints and communications, etc.) and the necessary appurtenances to consider the structure complete and usable.
1.3. Other Construction:
1.3.1. New construction, renovation, repairs and/or upgrades of highways, roads, streets, airport runways, concrete aprons & pads, sidewalks, decorative pavers, athletic/recreational surfaces, landscaping & irrigations systems, seeding/sodding, detection loops, pedestrian bridges, highway bridges (bridges that do not span over major waterways), parking lots, traffic lines/markings/signs. Work can also include the following, but not be limited to: site preparation, earthwork, grading, excavation & filling, clearing & grubbing, surveying, traffic & signalization and traffic studies. Storm water management, storm drainage systems and erosion control.
1.4. Incidental Work:
1.4.1. Work incidental to the tasks performed in any of the above paragraphs shall be include, but is not limited to demolition, carpentry, lighting, and similar minor electrical work that may be required to provide a complete, safe and usable facility during and after the course of roofing, mechanical, plumbing or painting services.
1.4.1.1. Damage such as ceiling replacement, painting and carpet cleaning as a result of roof leaks.
1.4.1.2. Lead, asbestos and mold remediation work incidental to renovation work.
1.4.1.3. Surface deterioration incidental to interior/exterior repairs such as patching drywall, replacing siding, trim work, etc.
1.4.1.4. Relocating furniture, workstations, etc incidental to construction.
1.4.1.5. Testing, reports and surveys associated with new construction, renovation, repairs and/or upgrades and additions to buildings (including lead and asbestos), structures, roads (including traffic/pedestrian patterns).
1.5. Restrictions: Task orders for design only or demolition only shall not be placed against the contract.
1.6. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF
ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13, and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets Department of Veterans Affairs – VOW to Hire Heroes Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://www.wtc.army.mil/modules/soldier/s2-aw2EligibilityEnrollment.html U. S. Chamber of Commerce Foundation – Hiring Our Heroes http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
1.7 Accounting for Contract Services/Contractor Manpower Reporting
(UNCLASSIFIED)
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affair) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including sub- contractor manpower) required for using the following web site https://contractormanpower.army.pentagon.mil.
The Contractor shall be responsible for entering all required information into CMRA such as:
Contracting Office, Contracting Officer, and Contracting Officer’s Representative.
Contract number, including task and delivery order number.
Beginning and ending dates covered by reporting period.
Contractor names, address, phone number, e-mail address, and identity of contractor employee entering data.
Estimated direct labor hours (including sub-contractors).
Estimated direct labor dollars paid this reporting period (including sub-contractors).
Total payments (including sub-contractors).
Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different).
Estimated data collection cost.
Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purpose of reporting this information).
Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website).
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100
SECTION 00100
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for a Single Award Task Order Contract (SATOC) under which task orders for General Construction are expected to be issued for projects within the South Atlantic Division (SAD) (North Carolina, South Carolina, Georgia, Florida, Alabama) area of responsibility. Work contemplated on this SATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense and Federal Agencies located on DoD installations or in support of defense operations. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either of a Construction or Design/Build. A project requiring use of civil funds is not authorized under this contract.
1.2 The purpose of the Source Selection plan is to establish a uniform evaluation procedure for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Trade-Off Process (See Federal Acquisition Regulation 15.101-1). In as much as the proposal shall describe the capability of the Offeror to perform any resulting contract, and task orders issued there under, the proposal should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract and task orders issued thereafter.
1.3 For the purposes of this solicitation, the Government will utilize the Two (2) Phase Design Build Process. In Phase 1 of the 2 phase design-build selection procedure, interested Offerors will submit specified performance capability proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
1.4 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select up to five (5) of the most highly qualified Offerors to participate in Phase 2.
1.5 In Phase 2 of this process, the Government will evaluate both technical capability and price.
1.6 Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase 2 of this solicitation are invited to submit a Phase 2 proposal. The Government intends to announce the names of Offerors selected for Phase 2 in the FEDBIZOPS website. An
Offeror that does not want this information released must provide a written notification and explanation of its objections to release of the information. Those Offerors selected for Phase 2 will be provided the technical requirements package for a Sample Task Order that may be representative of the type work and task orders anticipated to be issued under any resultant contract(s). The Sample Task Order will be used solely for the purpose of ensuring potential contractors understand the task order preparation process and how to properly apply area coefficients and mark-ups. The Sample Task Order will not be used to evaluate price reasonableness or price realism. (3.a)
2. GENERAL INSTRUCTIONS
2.1 Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for performance of this contract, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
2.2 Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements;
provided, the arrangements are identified and company…