Floor renovation

Closed Solicitation Posted

Solicitation number
PR15468836
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238330 Flooring Contractors
Place of performance
Wien Austria

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of State is soliciting contractors for floor renovation services at the US Embassy residence kitchen in Vienna, Austria. This procurement involves approximately 55 square meters of specialized kitchen flooring work, including floor preparation with epoxy primer coating, application of high-elastic and mechanically resistant epoxy kitchen floor coating, and delivery and installation of 50 linear meters of prefabricated base profiles measuring 6 centimeters in height. The contractor must meet specific technical requirements including a slip resistance coefficient greater than 0.44 in dry conditions, use of two-component polyurethane binder, and anti-slip surface treatment with color options of RAL 7032 or RAL 7001. Personnel working on-site must obtain security clearance due to the embassy location, and the contractor must provide comprehensive documentation including handover protocols, maintenance instructions, and product data sheets. The solicitation was posted on July 28, 2025, with proposals due by August 28, 2025.

This opportunity does not utilize any set-aside designations and is classified under NAICS code 238330 for Flooring Contractors. The work is scheduled to begin in the beginning or middle of 2026 and includes a three-year warranty period following completion. The project scope encompasses approximately 50 square meters of kitchen floor area requiring specialized epoxy coating systems designed for heavy-duty commercial kitchen environments. Performance will take place at the US Embassy facilities in Vienna, Austria, requiring contractors to coordinate with embassy security protocols and operational requirements. The procurement falls under PSC category Z2FA for Repair or Alteration of Family Housing Facilities, indicating this work involves residential quarters within the embassy compound.

Notice text

This project's specification covers the floor renovation of a 50smq kitchen for the US- Embassy, Vienna.

The work involves, but is not limited to the following:

  • Execution planning
  • Floor preparation- epoxy primer coating
  • High elastic and mechanically resistant epoxy kitchen floor coating
  • Delivery and installation prefabricated base profiles
  • Handover
  • Documentation

Files

File Type Posted
SOW_CMR-BILAT_Kitchen remodeling_Floor renovation_July 2025.docx DOCX document

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Floor renovation Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity