About this opportunity

The U.S. Army Corps of Engineers, Baltimore District seeks to rehabilitate the southern jetty at Fishing Creek and perform maintenance dredging of the Fishing Creek federal navigation channel in Calvert County, Maryland. The scope of work includes rehabilitating approximately 1,000 feet of the southern jetty to a height of 6 feet MLLW using 1.5 to 3 ton capstone across three sections, dredging an access channel not exceeding 75 feet wide and 10 feet deep MLLW, transporting approximately 22,000 cubic yards of dredged material via pipeline to an existing upland placement site, replacing three existing weir boxes at the placement site, and maintenance dredging of the Fishing Creek federal navigation channel. The response due date is July 19, 2022.

This is a 100% small business set-aside solicitation under NAICS codes 237990 and 562910. The estimated value is between $5-10 million. Six bids were received on July 19, 2022 from White Lake Dock & Dredge, Inc., Edwin A. and John O. Crandel, Inc., Coastal Design & Construction, Inc., Lindstrom Excavating Contractors, Inc., and Stampede Ventures, Inc. The place of performance is Chesapeake City, Maryland.

Notice text

11 versions

Update #11 · Latest ·

ABSTRACT OF BIDS

**************************************************************

The WQC provided in the amendments appear to have cut off the drawings so another copy of the WQC is being provided.

****************************************************************

Amendment 0007

The purpose of this Amendment (0007) is to:

1. Extend the Bid Opening from 14 July 2022 to 19 July 2022.
2. Provide an UPDATED revised Water Quality Certification dated 29 June 2022.
3. Provide a response to a Request for Information (RFI).

**************************************************************

Amendment 0006

The purpose of this Amendment (0006) is to:

1. Provide a Revised Bid Schedule.
2. Provide an updated Wage Determination for MD 20220023 date 1 July 2022.
3. Provide the Revised Water Quality Certification dated 29 June 2022.

********************************************************************

Amendment 0005 

The purpose of this Amendment is to:

1. Extend the Bid Opening date from 7 July 2022 to 14 July 2022, 11:00AM.

****************************************************************************

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #10 ·

The WQC provided in the amendments appear to have cut off the drawings so another copy of the WQC is being provided.

****************************************************************

Amendment 0007

The purpose of this Amendment (0007) is to:

1. Extend the Bid Opening from 14 July 2022 to 19 July 2022.
2. Provide an UPDATED revised Water Quality Certification dated 29 June 2022.
3. Provide a response to a Request for Information (RFI).

**************************************************************

Amendment 0006

The purpose of this Amendment (0006) is to:

1. Provide a Revised Bid Schedule.
2. Provide an updated Wage Determination for MD 20220023 date 1 July 2022.
3. Provide the Revised Water Quality Certification dated 29 June 2022.

********************************************************************

Amendment 0005 

The purpose of this Amendment is to:

1. Extend the Bid Opening date from 7 July 2022 to 14 July 2022, 11:00AM.

****************************************************************************

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #9 ·

Amendment 0007

The purpose of this Amendment (0007) is to:

1. Extend the Bid Opening from 14 July 2022 to 19 July 2022.
2. Provide an UPDATED revised Water Quality Certification dated 29 June 2022.
3. Provide a response to a Request for Information (RFI).

**************************************************************

Amendment 0006

The purpose of this Amendment (0006) is to:

1. Provide a Revised Bid Schedule.
2. Provide an updated Wage Determination for MD 20220023 date 1 July 2022.
3. Provide the Revised Water Quality Certification dated 29 June 2022.

********************************************************************

Amendment 0005 

The purpose of this Amendment is to:

1. Extend the Bid Opening date from 7 July 2022 to 14 July 2022, 11:00AM.

****************************************************************************

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #8 ·

Amendment 0006

The purpose of this Amendment (0006) is to:

1. Provide a Revised Bid Schedule.
2. Provide an updated Wage Determination for MD 20220023 date 1 July 2022.
3. Provide the Revised Water Quality Certification dated 29 June 2022.

********************************************************************

Amendment 0005 

The purpose of this Amendment is to:

1. Extend the Bid Opening date from 7 July 2022 to 14 July 2022, 11:00AM.

****************************************************************************

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #7 ·

Amendment 0005 

The purpose of this Amendment is to:

1. Extend the Bid Opening date from 7 July 2022 to 14 July 2022, 11:00AM.

****************************************************************************

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #6 ·

Amendment 0004 

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);

********************************************************************************

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #5 ·

Amendment 0003

The purpose of this Amendment is to:

1. Extend the bid opening date to 7 July 2022, 11:00 AM

**********************************************************************************

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #4 ·

Amendment 0002

The purpose of this Amendment is to:

1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certificate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling

************************************************************************************

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #3 ·

Site Visit Sign-In Sheet

The sign-in sheet for the visit that was held on 2 June 2022 has been uploaded. 

************************************************************************************

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #2 ·

Amendment 0001

The purpose of this Amendment (0001) is to provide responses to the Requests for Information (RFIs).

*************************************************************************************

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Update #1 ·

Fishing Creek Jetty Rehab and Maintenance Dredging

This project is 100% Small Business Set-aside

The U.S. Corps of Engineers Baltimore District is seeking sources for a construction project entitled, Fishing Creek Jetty Rehab and Maintenance Dredging, Calvert County Maryland. The scope includes the rehabilitation of the southern jetty at Fishing Creek to a height of 6 ft MLLW using 1.5 to 3 ton capstone. The jetty rehabilitation will be segmented into three sections with a total length of approximately 1,000 ft.

An access channel will need to be dredged prior to construction due to no land access at the jetty. The access channel will be no more than 75 ft wide and 10 ft MLLW deep. Dredged material will be placed at an existing nearby upland placement site.

Maintenance dredging will occur at the Fishing Creek federal navigation channel. Approximately 22,000 cubic yards of material will be hydraulically dredged and transported via pipeline to the same existing upland site as the access channel dredged material. No earthwork berm repairs are needed, but the three existing weir boxes will need to be replaced at the existing placement site.

Files

Show all 13

Notice history

Notice Type Posted
Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland Award Award Notice
This notice Latest solicitation Solicitation
Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland Pre-Solicitation
Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors