This document package includes a solicitation for the Fishing Creek South Jetty Rehab and Maintenance Dredging project in Calvert County, Maryland. The U.S. Army Corps of Engineers, Baltimore District is seeking sources for the rehabilitation of the southern jetty at Fishing Creek to a height of 6 feet MLLW using 1.5 to 3 ton capstone over approximately 1,000 linear feet in three segmented sections. An access channel up to 75 feet wide and 10 feet deep also requires dredging prior to construction. Approximately 22,000 cubic yards of material from the access channel and maintenance dredging of the Fishing Creek federal navigation channel will be hydraulically dredged and transported via pipeline to an existing nearby upland placement site. The three existing weir boxes at the placement site will also be replaced. The project is set aside entirely for small businesses.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland
The purpose of this Amendment is to:
1. Provide responses to Requests for Information (RFIs);
2. Provide a revised Bid Schedule;
3. Provide Fishing Creek Water Quality Certif icate from MDE; and
4. Provide Fishing Creek Access Channel Sediment Sampling
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0014
X 9B. DATED (SEE ITEM 11)
24-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jun-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00010 - SUPPLIES OR SERVICES AND PRICES
UNIT PRICE SCHEDULE
Item Estimated No. Description Quantity Unit Price Amount
Structures Monitoring
Access Dredging
Repair Area 1 (STA. 0+25 to
STA. 7+00
Geotextile
Underlayer Stone
1.5 Ton Capstone
Repair Area 2 (STA. 7+00 to
STA. 9+00)
Geotextile
2.8 Ton Capstone
Repair Area 3 (STA. 9+00 to
STA. 9+45)
Geotextile
2.8 Ton Capstone
Maintenance Dredging
Reimbursement of Performance and Payment Bonds
14,500
3,770
5,150
1,880
JOB
SF
TON
L.S.
Mobilization and Demobilization
Maintenance Dredging Fishing Creek - Stations 0+00 to 4+223
9,991
CY
0015 Weir Boxes at Fishing
Creek Placement Site
TOTAL ESTIMATED BASE BID AMOUNT $
OPTIONAL BID ITEMS
0016 Maintenance Dredging Fishing 12,186 CY $_______ $______ Creek Overdepth - Stations 0+00 to 4+223
0017 Repair Area 1 650 CY $_______ $_______ (STA. 0+25 to STA. 7+00) Concrete Grouting
0018 Repair Area 2 300 CY $_______ $_______ (STA. 7+00 to STA. 9+00) Concrete Grouting
TOTAL ESTIMATED BASE AND OPTIONAL BID AMOUNT $
NOTICE TO BIDDERS
Bidders must bid on all items. Failure to bid on all items may be cause for rejection of the proposal.
The Optional Items may be exercised at any time within 60 calendar days after Notice to Proceed. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order. Additional time for contract completion will be allowed when any Optional Items are exercised.
If Option Bid Item 0016 is exercised an additional 21 days will be added to the period of performance. If Option Bid Item 0017 is exercised an additional 3 days will be added to the period of performance. If Option Bid Item 0018 is exercised an additional 3 days will be added to the period of performance.
W912DR22B0014
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 calendar days after Notice to Proceed. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
(End of Summary of Changes)
W912DR22B0014 Fishing Creek Jetty Rehab and Maintenance Dredging Bidders RFI’s 6/22/2022
Q1: In the stone design it is spec-ed that nothing should be higher than 2:1. The quarry to be used (Vulcan in Havre de Grace, MD) states they usually do 3:1, but is unsure if they can guarantee 2:1. Is that acceptable?
No, bid as shown.
Q2: Underlayer stone spec ranges from 370-2500 lb. This is bigger than Vulcan’s Class III, but smaller than HRBT Type 3 Armor (range 450-3400 lb.). If Vulcan can off either, which is more desirable?
HRBT Type 3 Armor could possibly be considered. However, please clarify what specifically HRBT refers too? What is the W50 for this material?
Q3: For the 1.5 Capstone (range 2,200 to 4,600 lb.) Vulcan suggests the HRBT Type Armor 2 with a range of 750lb to 5600lb. Is that acceptable?
No, bid as shown.
Q4: All products have a bottom value of W-0 (0% smaller). Normally the quarry asks for 10% on unders.
Is the 10% acceptable or should it remain at 0%?
No, bid as shown.
Q5: What is the offset from the toe of the jetty?
We do not understand the question. All dimensions are taken from the jetty centerline (baseline).
Can you please better define the monitoring to be performed so that we can determine a quantity of monitoring locations? We are getting varying interpretations from experts reading the spec regarding the number of monitoring setups needed. Are we to just do representative testing by setting up in a few locations or do we need to set up at every single house and structure withing a 500’ radius of our work? I see where we are to do representative test of every type of structure so we have timber pile structures, decks, slab foundations, concrete pile foundation etc. Don’t think there are any pools.
From specifications: Place seismographs at locations on or at the base of the structures to obtain the highest peak particle velocities. Representative structures shall be defined as one of each foundation type (pile foundation, masonry, concrete, slab on grade). Monitor no less than three structures within the 500 feet of the active work area.
Above should be interpreted as follows: A minimum of 3 seismographs will be required within 500 feet of construction activity. Depending on the structure’s foundation type, it could be more. However, it is typically unlikely that foundations in a given area will be different from structure to structure. For example, it is not common to have a structure supported on piles next to one that will be on a masonry or concrete foundation. It is the contractor’s responsibility to determine the foundation types to accurately plan how many seismographs will be needed. Placement of seismographs will typically on structures closest to the work.
W912DR22B0014 Fishing Creek Jetty Rehab and Maintenance Dredging Bidders RFI’s 6/22/2022
Our big concern in addition to the questions is the 19 individual homes. Each one could easily complain about vibration.
The intent of the monitoring requirements is to ensure that construction vibration levels do not exceed peak particle velocities at frequencies that have the potential to cause damage to existing structures. It is not intended to prevent complaints. It is likely that vibrations will be felt by homeowners, etc. at much lower levels than the thresholds that induce damage.
Within the radius there at least 18 or 19 house, a large parking garage, a museum, a hotel, a restaurant, a commercial hotel and a new structure under construction.
The vibration monitoring consultant/expert should have the knowledge and expertise to determine which of the aforementioned structures should be monitored. If it is determined that multiple structures sensitive to vibration are within the 500 foot radius, then it is possible that more than 3 monitors will be necessary.
����.��!��/0�12��3���$�������.��!� � 2�/ /��4� ���5���� �������.��!�� 645�6���(�������'�*� ������!��7�������8�� �9�9��� ����������8�� ����������9�.�� ��'������9�� �<'��%;%=���9�� �9�1���4� ���5���� ����<45�=���������� ����;�������45�*�3 ������8�� ��������*�*�������������������������<�����=�������4��$�����8�� ���9�������� �� *��#�>�����������9���9����1���45�������������������� ������8�� ���������9�����>� ����1������ ��������4� ���9��������� �����1������ ���4��>� ������9� ��������������>��$�����8�� �*��3 ����9���9����4� ���5���� ����45������ ������8�� ������9�.�� ��'������9������
�� �9*��%���������9���9������>� ��45������ ������8�� ��������9��� ��9� ����9����8�� ���9�������� ������������9������������9� ����*��7���� ���9��� ����9���������������� ������������9���9�������� ����*��%������9���� ��9�������*����9����+�������9*��������1��60(/61� (��>� ����*� �����������������������*�����9������ �����,����� ������9����
STATE OF MARYLAND
DEPARTMENT OF THE ENVIRONMENT
WATER AND SCIENCE ADMINISTRATION
WATER QUALITY CERTIFICATION
CERTIFICATION NUMBER: 22-WQC-0013
ISSUED TO: Baltimore District US Army Corps of Engineers Navigation Branch 2 Hopkins Plaza Baltimore, Maryland, 21203 Attn: Kevin Brennan
EFFECTIVE DATE: June 9, 2022
PROJECT LOCATION: Fishing Creek Federal Navigation Channel Chesapeake Beach, Calvert County, Maryland
DESCRIPTION OF CERTIFIED PROJECT: To hydraulically dredge the Fishing Creek Federal navigation channel to its authorized depth of 7 feet MLLW (plus at least one foot of overdepth) for a width of 100 feet, and to dredge a 75-foot long by 10-foot deep access channel parallel to the existing jetty, resulting in approximately 22,000 cubic yards of material consisting of clay, mud, sand, silt, and shell. Dredged material is proposed to be hydraulically pumped to a nearby existing upland placement site. The work also includes the rehabilitation of the southern jetty along Fishing Creek by placing 1.5 to 3 ton capstone to restore the jetty elevation 2.7 feet higher than originally constructed to reduce overtopping, and increase the jetty crest width to 16 feet.
WATER QUALITY CERTIFICATION
UNDER AUTHORITY OF SECTION 401 OF THE FEDERAL WATER POLLUTION
CONTROL ACT AND ITS AMENDMENTS AND IN ACCORDANCE WITH § 9-313
THROUGH § 9-323, INCLUSIVE, OF THE ENVIRONMENT ARTICLE, ANNOTATED
CODE OF MARYLAND, THE MARYLAND DEPARTMENT OF THE ENVIRONMENT,
WATER AND SCIENCE ADMINISTRATION (DEPARTMENT) HAS DETERMINED
THAT THE REGULATED ACTIVITIES DESCRIBED IN THE REQUEST FOR
CERTIFICATION WILL NOT VIOLATE MARYLAND’S WATER QUALITY
STANDARDS, IF CONDUCTED IN ACCORDANCE WITH THE CONDITIONS OF
THIS CERTIFICATION.
This Water Quality Certification (Certification) is issued under authority of Section 401 of the Federal Water Pollution Control Act and its Amendments, Title 9, Subtitle 3 of the Environment Article, and Code of Maryland Regulations (COMAR) 26.08.02.10. The Maryland Department of the Environment (Department) has determined from a review of the request application file
22-WQC-0013
that the project activities described in the above will not violate Maryland’s water quality standards, provided that the following conditions are satisfied. This Certification does not relieve any person conducting activities under this Certification (Certification Holder) from the responsibility to obtain any other approvals, licenses, or permits in accordance with federal, State, or local requirements.
The Certification Holder subject to this Certification shall comply with the following conditions:
SPECIAL CONDITIONS
1. The Certification Holder shall not conduct any dredging from February 15th through June 15th of any year to protect spawning fish.
2. The Certification Holder shall not perform any dredging from November 15th through March 1st of any year to protect wintering waterfowl.
3. The dredged material placement site (DMP) shall be operated to limit turbidity in the discharge to waters of the State. A turbidity sample of the discharge water shall be performed every hour of active pumping to the DMP or when there is an observed change in the clarity of the water. Turbidity in the discharge may not exceed 150 units at any time or 50 units as a monthly average. Units shall be measured in Nephelometer Turbidity Units. A logbook of all turbidity monitoring shall be kept on site. The dredger shall have a person at the discharge point of the DMP in constant radio communication.
If a problem is incurred, the dredging operation shall be immediately shut down until the reason for the problem can be ascertained and rectified.
4. The Certification Holder shall conduct maintenance dredging within the scope of this Certification in terms of authorized dredge area, volume of material, and authorized depths.
5. The Licensee shall conduct a post dredge bathymetric survey and forward to the Water and Science Administration, Tidal Wetlands Division within 45 days after the termination of maintenance dredging operations.
6. If work is not conducted by the Certification Holder, all work performed under this Water Quality Certification shall be conducted by a marine contractor licensed by the Marine Contractors Licensing Board (MCLB) in accordance with Title 17 of the Environment Article of Annotated Code of Maryland. Licensing by MCLB shall occur prior to the beginning of dredging activities. A list of licensed marine contractors may be obtained by contacting the MCLB at 410-537- 3249, by e-mail at MDE.MCLB@maryland.gov or by accessing the Maryland Department of the Environment, Environmental Boards webpage.
7. Dredged material pipelines shall be installed, marked and maintained in accordance with all U.S. Coast Guard requirements for navigational safety. Dredge material pipelines and associated equipment shall be removed as soon as practicable, upon completion of activities authorized under this License.
8. The stone jetty shall be designed and constructed to prevent the loss of fill material to waters of the State of Maryland.
9. The DMP shall have an erosion and sediment control plan approved by the appropriate approval authority, including following the stabilization requirements set forth in COMAR 26.17.01.07 and “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control,” as may be amended.
10. The Certification Holder shall cease operations in the event of any inadvertent returns resulting from failure of the dredge material pipeline and associated equipment and shall:
a) Notify the Department within 24 hours; and
b) Implement an inadvertent return contingency plan approved by the Department.
GENERAL CONDITIONS
1. All water quality-related performance standards and conditions required by the Department in any state issued authorization for activities in tidal wetlands, nontidal waterways, their 100-year floodplains, nontidal wetland buffers, or nontidal wetland expanded buffers to ensure that any discharges will not result in a failure to comply with water quality standards in COMAR 26.08.02. or other water quality requirements of state law or regulation shall be met.
2. This Certification does not obviate the need to obtain required authorizations or approvals from other State, federal or local agencies as required by law.
3. The Certification Holder shall obtain any and all additional authorizations or approvals, including self-certifying General Permits issued by the Department, and shall comply with all conditions of such authorizations.
4. The proposed project shall be constructed in accordance with the approved final plan by the Department, or, if Department approval is not required, the plan approved by the U.S.
Army Corps of Engineers; and its approved revisions.
5. All fill and construction materials not used in the project shall be removed and disposed of in a manner which will prevent their entry into Waters of the U.S. and State.
6. This Certification does not authorize any injury to private property, any invasion of rights, or any infringement of federal, state, or local laws or regulations.
7. The Certification Holder shall allow authorized representatives of the Department access to the site of authorized activities during normal business hours to conduct inspections and evaluations of the operations and records necessary to assure compliance with this Certification.
8. No stockpiles of any material shall be placed in Waters of the U.S. or state or private tidal wetlands.
9. This Certification is valid for the project identified herein and the associated federally-approved U.S. Army Corps of Engineers Civil Works Navigation Branch project, until such time that federal approval expires or is not administratively extended.
STATEMENTS OF NECESSITY AND CITATIONS
1. Statement of Necessity for Special Condition 1: The time of year restriction is necessary to maintain the designated use- support of estuarine and marine aquatic life and shellfish harvesting.
Citation: Federal and state laws which authorize this condition include but are not limited to: COMAR: 26.08.02.02B(1)(d); 26.08.02.02B(3); COMAR 26.08.02.02-1
2. Statement of Necessity for Special Condition 2: A time of year restriction is necessary to allow for wintering waterfowl to move from breeding areas to seasonally use suitable winter habitat. Breeding and wintering habitat are both essential to support waterfowl populations. Breeding habitat would not sustain waterfowl during winter. Disturbance during the closure period would interfere directly or indirectly with designated uses for growth and propagation of wildlife.
Citations: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; Md.
Ann. Code, Env. Article, Title 1, Subtitles 3 and 4; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env. Article, Title 16; COMAR 26.08; COMAR 26.08.02.02.B.(3)
3. Statement of Necessity for Special Condition 3: Activities which result or may result in a discharge to regulated waters, including dredging and dredged material placement may require monitoring to ensure that water quality standards are met and designated uses are maintained, and to determine if remedial measures are needed to restore compliance with water quality standards if they are not met as a result of the discharge. The condition is necessary to ensure that dredged material does not increase turbidity in violation of general and numeric water quality standards and interfere with designated uses and to ensure that offsets to regulated waters are successfully implemented.
Citation: COMAR 26.08.02.03-3A(5); COMAR 26.08.02.03-3(C(5); COMAR
26.08.02.01B(2); COMAR 26.08.02.02B(1) COMAR 26.08.02.02B(3); COMAR
26.08.02.03B; COMAR 26.08.02.02B(1); 26.08.02.03B(1)(b); 26.08.02.03B(2)(e);
26.08.02; 26.08.01.02A; 26.08.02.09A; 26.08.02.02B(1)(d); COMAR 26.24;
26.08.02.03-3C(9)(a); COMAR 26.08.02.03B(2); COMAR 26.08.02.02B(1)(d);
4. Statement of Necessity for Special Condition 4: The limits on the scope of maintenance dredging are necessary to ensure that no discharges would violate water quality standards and designated uses for water clarify, turbidity, growth and propagation of fish, other aquatic life, and wildlife; and water contact recreation
Citations: COMAR 26.08.02.02B(1)(d); COMAR 26.08.02.02B(3); COMAR 26.08.02.03B
5. Statement of Necessity for Special Condition 5 : The condition is necessary to ensure that discharges associated with dredging result in water depths which are appropriate to support designated uses of fishing and water contact recreation and propagation of fish, other aquatic life and wildlife; and ensure that no discharges are unsightly, create a nuisance, change to an objectionable color or interferes with designated uses.
Citations : COMAR 26.08.02.01B(2); COMAR 26.08.02.02B(1); 26.08.02.02B(3);
COMAR 26.08.02.03B
6. Statement of Necessity for Special Condition 6: Expertise for conducting certain activities is required to ensure that there is no violation of water quality standards nor interference with designated uses. This condition is necessary to ensure that discharges will be conducted in a manner which does not violate water quality criteria nor interfere with designated uses.
Citation: COMAR 26.08.02.02B(2)- B(4); COMAR 26.08 02.03B(2)(d) – (e ); COMAR 26.08.02.03B(1)(b); 26.08.02.03B(2); COMAR 23.02.04.04
7. Statement of Necessity for Special Condition 7: The condition is necessary to ensure that the discharge does not interfere with navigational safety and designated uses for water contact recreation and fishing, nor create a nuisance.
Citation: COMAR 26.08.02.01B(1) and B(2); COMAR 26.08.02.03B(1)(a); COMAR 26.08.02.03B(2)(d)
8. Statement of Necessity for Special Condition 8, 9 & General Condition 5, 8: Fill or construction material within or adjacent to regulated resources may cause discharges resulting in turbidity in excess of water quality standards and interfere with designated uses of growth and propagation of fish, other aquatic life, wildlife; and other designated uses; and fail to meet general water quality criteria that waters not be polluted by substances in amounts sufficient to be unsightly or create a nuisance.
Citation: 26.08.02.03B(1)-B(2); COMAR 26.23; COMAR 26.24; COMAR 26.17.04
9. Statement of Necessity for Special Condition 9: Erosion and sediment control plans are necessary to ensure that sediment discharges from construction activities will not enter waters of the United States. Sediment discharges from earth disturbance or discharges at erosive rates within or adjacent to regulated resources may cause discharges resulting in turbidity in excess of water quality standards and interfere with designated uses of growth and propagation of fish, other aquatic life, wildlife; and other designated uses; and fail to meet general water quality criteria that waters not be polluted by substances in amounts sufficient to be unsightly or create a nuisance
Citation: Env. Article, Title 4, Subtitle 1 COMAR 26.17.01; 26.08.02.03B(1)-B(2)
10. Statement of Necessity for Special Condition 10: The condition is necessary to ensure that water quality standards are met under unique circumstances for inadvertent discharges and that designated uses of waters are maintained. Releases of significant amounts of sediment can impact aquatic environments and if unchecked can alter them to an uninhabitable state. .
Citation: Federal and state laws that authorize this condition include but are not limited to: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; Md. Ann.
Code, Env. Article, Title 1, Subtitles 3 & 4; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env. Article, Title 5, Subtitles 5 and 9; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env.
Article, Title 16; COMAR 26.08; COMAR 26.08.02.10G(3); COMAR 26.17.04;
COMAR 26.23; COMAR 26.24; COMAR 26.23.02.06, COMAR 26.08, COMAR
26.08.02.10E; COMAR 26.08.02.09C(3); COMAR 26.08.02.03B(1)(b); COMAR
26.08.02.03B(2); COMAR 26.08.02.03-3; COMAR 26.08.02.02B(2); COMAR
26.08.02.02B(4); COMAR 26.08.02.02B(6); COMAR 26.08.02.02B(8)
11. Statement of Necessity for General Condition 1, 2, 3, 4: The condition is necessary to ensure that water quality standards are met and designated uses are maintained.
Citations: Federal and state laws which authorize this condition include but are not limited to: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; Md.
Ann. Code, Env. Article, Title 1, Subtitles 3 and 4; Md. Ann. Code, Env. Article, Title 5, Subtitles 5 and 9; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env.
Article, Title 16; COMAR 26.08; COMAR 26.08.02.10G(3); COMAR 26.23.02.06;
COMAR 26.17.01; COMAR 26.23; COMAR 26.24
12. Statement of Necessity for General Condition 6: The condition is necessary to clarify the scope of this certification to ensure compliance with water quality regulations, without limiting restrictions through other requirements.
Citation: Federal and state laws which authorize this condition include but are not limited to: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; Md.
Ann. Code, Env. Article, Title 1, Subtitles 3 and 4; Md. Ann. Code, Env. Article, Title 5, Subtitles 5 and 9; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env.
Article, Title 16; COMAR 26.08, COMAR 26.08.02.10E; COMAR 26.23.02.06;
COMAR 26.17.04; COMAR 26.23; COMAR 26.24
13. Statement of Necessity for General Condition 7: Conditions of certification involve precise actions to comply with water quality standards. Site inspection may be necessary to ensure that limits, methods, and other requirements are met to ensure that water quality standards are met and designated uses are maintained.
Citation: Federal and state laws that authorize this condition include but are not limited to: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; Md. Ann.
Code, Env. Article, Title 1, Subtitles 3 and 4; Md. Ann. Code, Env. Article, Title 5, Subtitles 5 and 9; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env.
Article, Title 16; COMAR 26.08; COMAR 26.23.02.06; COMAR 26.23; COMAR 26.24;
COMAR 26.17.04
14. Statement of Necessity for General Condition 9 : This condition is necessary to qualify the period of applicability of the terms and conditions of this Certification to be protective of Maryland water quality standards.
Citations : Federal and state laws which authorize this condition include but are not limited to: 33 U.S.C. § 1341(a), (b), & (d); 33 U.S.C. § 1251(b); 33 U.S.C. § 1370; 40 C.F.R. 121, 15 C.F.R. 930, Md. Ann. Code, Env. Article, Title 1, Subtitles 3 and 4; Md.
Ann. Code, Env. Article, Title 5, Subtitles 5 and 9; Md. Ann. Code, Env. Article, Title 9, Subtitle 3; Md. Ann. Code, Env. Article, Title 16; COMAR 26.08; COMAR 26.17.04;
COMAR 26.23; COMAR 26.24
Failure to comply with these conditions may subject the Certification Holder to criminal and/or civil penalties or other enforcement action in accordance with applicable law.
CERTIFICATION APPROVED: DATE:
D. Lee Currey, Director Water and Science Administration
Tracking Number: 202260727 Agency Interest Number: 175046
Effective Date: June 9, 2022
Enclosure: Plan Sheets dated March 2022 cc: WSA Inspection & Compliance Program
6/10/2022
U.S. Army Corps of Engineers
Baltimore District
Materials and Instrumentation Unit
Final Laboratory Report
Project: Fishing Creek Sediment Sampling, Fishing Creek, MD.
Date: December 2019
Pages: 1-5 of 5
Prepared by: Estes, R.
Ray, D.
0.0010.010.11101001,000
COARSE
PL
P E R C E N T
C O A R S E R
B Y
W E I G H T
Jar-1
FINE
LL
ENG FORM ENG2087FISHING CREEK SEDIMENT SAMPLING.GPJ
1/2" 101.5"
COBBLES
FINE
Legend
GRAIN SIZE IN MILLIMETERS
0.0-6.0
MEDIUM
REMARKS :
20 HYDROMETER4"12" 42"
S-1
Classification (ASTM D 2487)
COARSE
3/8"
3/4"
U.S. STANDARD SIEVE OPENING IN INCHES
DATE:
SAND
P E R C E N T
F I N E R
B Y
W E I G H T
70 100
GRAVEL
Nat wc%
1"
Sample No.
GRADATION CURVES
3"
Fishing Creek Sediment Sampling NOV 2019
Fishing Creek, MD
6"
SM
U.S. STANDARD SIEVE NUMBERS
PI PROJECT:
AREA:
TEST METHODS: ASTM D 422, D4318, D2216
SILTY SAND
SILT or CLAY
BORING NO.:
Depth (ft)
0.0010.010.11101001,000
COARSE
PL
P E R C E N T
C O A R S E R
B Y
W E I G H T
Jar-1
FINE
FINE
Legend
GRAIN SIZE IN MILLIMETERS
0.0-6.0
MEDIUM
REMARKS :
20 HYDROMETER4"12" 42"
NP
S-2
Classification (ASTM D 2487)
R C E N T
F I N E R
B Y
W E I G H T
70 100
GRAVEL
Nat wc%
1"
Sample No.
GRADATION CURVES
NPNP
3"
Fishing Creek Sediment Sampling NOV 2019
Fishing Creek, MD
6"
SM
U.S. STANDARD SIEVE NUMBERS
PI PROJECT:
AREA:
TEST METHODS: ASTM D 422, D4318, D2216
SILTY SAND
SILT or CLAY
0.0010.010.11101001,000
COARSE
PL
P E R C E N T
C O A R S E R
B Y
W E I G H T
Jar-1
FINE
FINE
Legend
GRAIN SIZE IN MILLIMETERS
0.0-6.0
MEDIUM
REMARKS :
20 HYDROMETER4"12" 42"
NP
S-3
Classification (ASTM D 2487)
R C E N T
F I N E R
B Y
W E I G H T
70 100
GRAVEL
Nat wc%
1"
Sample No.
GRADATION CURVES
NPNP
3"
Fishing Creek Sediment Sampling NOV 2019
Fishing Creek, MD
6"
SM
U.S. STANDARD SIEVE NUMBERS
PI PROJECT:
AREA:
TEST METHODS: ASTM D 422, D4318, D2216
SILTY SAND
SILT or CLAY
0.0010.010.11101001,000
COARSE
PL
P E R C E N T
C O A R S E R
B Y
W E I G H T
Jar-1
FINE
FINE
Legend
GRAIN SIZE IN MILLIMETERS
0.0-6.0
MEDIUM
REMARKS :
20 HYDROMETER4"12" 42"
NP
S-4
Classification (ASTM D 2487)
R C E N T
F I N E R
B Y
W E I G H T
70 100
GRAVEL
Nat wc%
1"
Sample No.
GRADATION CURVES
NPNP
3"
Fishing Creek Sediment Sampling NOV 2019
Fishing Creek, MD
6"
SP-SM
U.S. STANDARD SIEVE NUMBERS
PI PROJECT:
AREA:
TEST METHODS: ASTM D 422, D4318, D2216
POORLY GRADED SAND with SILT
SILT or CLAY
0.0010.010.11101001,000
COARSE
PL
P E R C E N T
C O A R S E R
B Y
W E I G H T
Jar-1
FINE
FINE
Legend
GRAIN SIZE IN MILLIMETERS
0.0-6.0
MEDIUM
REMARKS :
20 HYDROMETER4"12" 42"
NP
S-5
Classification (ASTM D 2487)
R C E N T
F I N E R
B Y
W E I G H T
70 100
GRAVEL
Nat wc%
1"
Sample No.
GRADATION CURVES
NPNP
3"
Fishing Creek Sediment Sampling NOV 2019
Fishing Creek, MD
6"
SM
U.S. STANDARD SIEVE NUMBERS
PI PROJECT:
AREA:
TEST METHODS: ASTM D 422, D4318, D2216
SILTY SAND
SILT or CLAY
End of Report.
| SF30 |
| Revised Bid Schedule |
| 52.217-7 modified |
| RFIs and Responses |
| WQC from MDE |
| Fishing Creek Sediment Sampling |