Fire NFPA Testing for Hose, Nozzle Appliance, System, Pump & Hard suction
Closed Solicitation Posted
- Solicitation number
- FA4419-21-Q-0003
- Agency
- Air Education and Training Command Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- Place of performance
- Altus Afb Ok 73523 USA
Notice details come from SAM.gov. Updated .
Notice text
Altus AFB Fire Department needs the following items tested IAW NFPA 1911, NFPA 1932, NFPA 1962, and AFI 32-2001 to meet
mission requirements. Provide digital and hard copy of all test results.
1. Fire hose apx 10,630 feet
2. Ground ladders apx 293 feet
3. Nozzles 59 each
4. Appliances 50 each
5. Truck systems 14
6. Hard suction 10 sections
7. 4 pump tests.
The contractor will provide the 97 CES/CEF all labor, tools, equipment, test equipment, personal protective clothing and
equipment, materials, transportation and any other incidentals necessary to travel to Altus AFB, OK to perform the NFPA Testing
outlined below.
a. Perform hose testing IAW NFPA 1962 – Standard on Fire Hose.
b. Unload all hose to be tested.
c. Perform a visual inspection of each hose to identify any physical damage.
d. Perform a hydrostatic pressure test.
e. Perform a hydrostatic pressure test on all nozzles and appliances IAW NFPA 1962 during this time as well.
f. Ensure that all hose which fails any part of the inspection is marked and removed from service.
g. Mark both ends of each section of hose with stencils provided by 97 CES/CEF and black spray paint provided by the
contractor.
h. Reload all hose to department specifications with the exception of “hotel packs”.
i. Perform ground ladder testing IAW NFPA 1932—Standard on Ground Ladders.
j. Perform vehicle mounted equipment testing on all pumps and pump systems IAW NFPA 1911.
k. Provide both digital and hard copy of all test results within 10 days of completion to include: Date of test, service test
pressures, hose diameter, length, type, identification number, location (which apparatus the equipment is assigned to) and
pass/fail for each piece of hose, nozzle, appliance or ground ladder as required per NFPA 1962 and 1932.
l. Provide both digital and hard copy of all test results within 10 days of completion to include: Date of test and all pertinent
information as required by NFPA 1911 for vehicle mounted equipment.
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOW Altus AFB NFPA Testing Updated.pdf | ||
| Wadge Determination 15-5329.txt | TXT text file | |
| Attachment 5 - Evaluation Factors.pdf | ||
| Attachment 4 - Instructions to Offerors.pdf | ||
| Attachment 3 - Clauses and Provisions.pdf | ||
| Combined_Synopsis_Solicitation.pdf | ||
| Attachment 2 - Wage Determination 15-5329.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity