F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB

Award Notice Posted

Solicitation number
W9123622C0003
Agency
Awarded
to Walsh Federal LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W9123622C2003 Federal contract award
Place of performance
Langley AFB, Virginia 23665, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Norfolk awarded a contract to Walsh Federal, LLC for the construction of a six-bay high-bay consolidated operations and maintenance hangar at Langley Air Force Base to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base. The contract value is $56,701,000 for the construction of the facility within 700 calendar days from the notice to proceed, which will include compacted fill, reinforced concrete foundations, a concrete floor slab, structural steel frame, concrete masonry unit facade, standing seam metal roof and all necessary spaces and utilities to house maintenance operations for the aircraft.

Notice text

A. DESCRIPTION OF THE PROJECT
Provide a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base. Construction includes compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house hangar bays, staff administration, propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms/showers/lockers, and building systems support. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. The project will demolish Facility 753 (7,400
Square Meters). Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum antiterrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 150 Tons
The project duration is 700 calendar days from the notice to proceed.

Awarded contract W9123622C2003 to Walsh Federal, LLC for 56701000.00 on 2022-07-28.

Notice history

Notice Type Posted
This notice Award Award Notice
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB Latest special notice Special Notice
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB Solicitation
F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity