Epoxy Flooring at Capitol Reef National Park/Fruit

Closed Solicitation Posted

Solicitation number
140P1225Q0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238330 Flooring Contractors
PSC
7220 Floor Coverings

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service Intermountain Region is seeking a small business contractor to provide epoxy flooring installation services at Capitol Reef National Park in Utah. The solicitation (140P1225Q0004) requires a contractor to apply epoxy coating with grey base and black and white flecking to 3,136 square feet of basement floors in the Fruita and Orchard Dorms, totaling 1,568 square feet per building. Contractors must provide all labor and materials, perform cement subfloor grinding, and complete the installation according to the Statement of Work, which specifies compliance with building codes, NPS policies, and OSHA requirements. Quotes will be evaluated based on price and compliance with minimum specifications outlined in the solicitation documents. The deadline for quote submission is December 17, 2024, with a mandatory site visit scheduled for December 12, 2024, at 11:00 AM MST.

This contract is a 100% small business set-aside under NAICS code 238330 with a size standard of $19 million, targeting flooring contractors capable of completing the project between December 23, 2024, and February 23, 2025. The work will take place at 52 West Headquarters Drive, Torrey, UT 84775, within the park's employee housing area. Contractors must be registered in SAM.gov with an active registration and submit invoices electronically through the Invoice Processing Platform (IPP) system. The project will be awarded as a firm-fixed price contract, with wage rates determined by the Service Contract Act Wage Determination for Wayne County, Utah, which establishes minimum hourly rates and benefits for workers. The primary points of contact are Charles Gittings (Park POC) and Kimberly Steele (Contracting POC), who will oversee the final inspection and acceptance of the flooring installation.

Notice text

3 versions

Update #3 · Latest ·

The purpose of Amendment 0002 is to add the following for Epoxy Flooring at Capitol Reef National Park/Fruita and Orchard Dorms IAW Statement of Work.

Summary of Changes: Contractors to install ~350 linear feet of 4 inch vinyl cove base along the walls. Color should complement epoxy flooring color.

Contractor shall provide all labor and materials to cover Basement Floors of the Fruita and Orchard Dorms, 52 West Headquarters Drive, Torrey, UT 84775, located within the employee housing area, with an epoxy fleck commercial coating with epoxy sealer IAW the Statement of Work. The square footage of the basements for both dorms is 1,568 square feet, for a total of 3,136 square feet. No mold abatement is required.

Period of Performance: 23 December 2024 to 23 February 2025 (no later than)

Park POC: Charles Gittings/charles_gittings@nps.gov
Contracting POC: Kimberly Steele/Kimberly_Steele@nps.gov

All other items remain unchanged.

Update #2 ·

The purpose of this amendment for Epoxy Flooring at Capitol Reef National Park/Fruita and Orchard Dorms IAW Statement of Work is to establish a site visit.

The site visit details are below:
December 12, 2024 at 11:00 a.m (Mountain Standard Time)
52 West Headquarters Drive, Torrey, UT 84775

The Park POC for this site visit is Charles Gittings and may be contacted at charles_gittings@nps.gov. If you plan to attend, please contact Mr. Gittings directly.

Contractor shall provide all labor and materials to cover Basement Floors of the Fruita and Orchard Dorms, 52 West Headquarters Drive, Torrey, UT 84775, located within the employee housing area, with an epoxy fleck commercial coating with epoxy sealer IAW the Statement of Work. The square footage of the basements for both dorms is 1,568 square feet, for a total of 3,136 square feet. No mold abatement is required.

Period of Performance: 23 December 2024 to 23 February 2025 (no later than)

Park POC: Charles Gittings/charles_gittings@nps.gov
Contracting POC: Kimberly Steele/Kimberly_Steele@nps.gov

Update #1 ·

Epoxy Flooring at Capitol Reef National Park IAW Statement of Work.

Contractor shall provide all labor and materials to cover Basement Floors of the Fruita and Orchard Dorms, located within the employee housing area, with an epoxy coating IAW the Statement of Work. The square footage of the basements for both dorms is 1,568 square feet, for a total of 3,136 square feet.

Period of Performance: 23 December 2024 to 23 February 2025 (no later than)

Park POC: Charles Gittings/charles_gittings@nps.gov
Contracting POC: Kimberly Steele/Kimberly_Steele@nps.gov

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Concrete floor leveling and resurfacing 9500 MacArthurBlvd, West Bethesda, MD 20817. 20817 · NAICS 238110 Naval Sea Systems Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity