Environmental Dredging Services to remediate contaminated sediment associated with the Callahan Mine Superfund Site in Brooksville, Maine.
Closed Solicitation Posted
- Solicitation number
- W912WJ25BA005
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 562910 Remediation Services
- Place of performance
- Brooksville Maine 04617
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District New England is seeking environmental dredging services to remediate contaminated sediment at the Callahan Mine Superfund Site in Brooksville, Maine. The procurement involves dredging approximately 6,000 to 10,000 cubic yards of contaminated sediment from Goose Cove, covering an area of approximately 1.5 acres, and hydraulically pumping the removed material approximately 1,500 feet to a former mine pit for disposal. The work includes removing existing structures such as steel pipes, chains, and moorings prior to dredging, implementing turbidity curtains and monitoring systems to prevent sediment plumes, and conducting real-time hydrogen sulfide air monitoring during disposal operations. The original solicitation was posted on April 17, 2025, with a proposal due date of May 27, 2025, and underwent multiple amendments to address contractor questions and clarify technical requirements.
According to the bid abstract, this solicitation was designated as a Small Business Set Aside, with five companies submitting offers: Duwamish Services LLC, Environmental Restoration LLC, Viking Dredging LLC, Cape Environmental Management Inc, and J.F. Brennan Company Inc. The submitted bid amounts ranged significantly from $793,074 by Duwamish Services LLC to $2,423,000 by Environmental Restoration LLC, indicating substantial variation in contractor approaches and pricing strategies. The work must be performed in Goose Cove, a narrow 15.5-acre inlet with challenging access conditions including a 10-foot tidal range and Mean Lower Low Water depths of 4 to 6 feet. The contaminated sediment consists of light gray, talcose deposits resulting from historical mining operations, with the remediation requiring mechanical or hydraulic dredging methods to achieve maximum removal depths of 2-4 feet based on the Record of Decision requirements. The site's location on Penobscot Bay presents logistical challenges for equipment mobilization while requiring coordination to control unauthorized boat access during remediation activities.
Notice text
2 versions
Update #2 · Latest ·
Environmental Dredging Services to remediate contaminated sediment associated with the Callahan Mine Superfund Site in Brooksville, Maine. The work consists of providing Environmental Remediation Services for dredging approximately 6,000 to 10,000 cubic yards of sediment from Goose Cove and covering an area of approximately 1.5 acres. The Goose Cove sediment removal area is located on the Penobscot Bay side of the former Goose Falls Dam with a tidal range of approximately 10 feet and a Mean Lower Low Water (MLLW) depth of approximately 4 to 6 feet. A maximum removal depth of 2-4 ft is required based on the requirements of the Record of Decision and Remedial Design. Tidal surface elevations in this area will provide unimpeded barge access; however, mobilization to this area presents several challenges. Structures within the proposed sediment removal area such as a steel pipe, chains, and moorings, will be removed by the Contractor prior to dredging, and moorings will be replaced after remediation is complete. Unauthorized boat access to Goose Cove will be controlled during remediation activities.Goose Cove sediment removal can be completed using mechanical or hydraulic methods. Sediment removed from Goose Cove will be hydraulically pumped approximately 1,500 feet to a CAD cell (former mine pit) for tremie placement. Real time hydrogen sulfide air monitoring will be required at the disposal location following an approved UFP-QAPP prepared by the Contractor. To protect against unintended releases of excessive sediment plumes, a turbidity curtain and turbidity monitoring may be required.The former Callahan Mine was a hard-rock, open-pit mine developed in Goose Pond, a shallow tidal estuary of approximately 75 acres in the Town of Brooksville, Maine. The Site is located approximately 15 miles west of the town of Blue Hill and 35 miles west of the town of Bar Harbor on the northwest side of the Cape Rosier peninsula on Penobscot Bay.Goose Cove is a narrow 15.5-acre inlet located adjacent to the northwestern end of Goose Pond, immediately north of Goose Falls. During early mine operations, groundwater seepage into the pit and entrained rock dust were pumped to an outfall in Goose Cove. This effluent likely contained fine grained drilling and blasting waste. Because of concerns about sediment accumulation in Goose Cove, an embayment within Goose Pond (Dyer Cove) was dammed off and used as a settling pond to remove a portion of the sediment (rock flour and silt) prior to discharge to Goose Cove. In addition, berms were constructed across portions of Goose Pond to separate surface water flows from mine operating areas and provide a sedimentation basin for overflow and decant discharge from the Tailings Impoundment. As a result of these operations, deposits of light gray, talcose sediment (termed mine waste) accumulated in portions of Goose Cove, Dyer Cove, and South Goose Pond. Areas of mapped mine waste (MACTEC, 2009) coincide with areas used as effluent settling ponds, effluent discharge locations, and sumps. There is an approximate 1.5-acre area (MACTEC, 2009) in Goose Cove coinciding with mine waste deposits like those in Goose Pond.
Update #1 ·
Environmental Dredging Services to remediate contaminated sediment associated with the Callahan Mine Superfund Site in Brooksville, Maine. The work consists of providing Environmental Remediation Services for dredging approximately 6,000 to 10,000 cubic yards of sediment from Goose Cove and covering an area of approximately 1.5 acres. The Goose Cove sediment removal area is located on the Penobscot Bay side of the former Goose Falls Dam with a tidal range of approximately 10 feet and a Mean Lower Low Water (MLLW) depth of approximately 4 to 6 feet. A maximum removal depth of 2-4 ft is required based on the requirements of the Record of Decision and Remedial Design. Tidal surface elevations in this area will provide unimpeded barge access; however, mobilization to this area presents several challenges. Structures within the proposed sediment removal area such as a steel pipe, chains, and moorings, will be removed by the Contractor prior to dredging, and moorings will be replaced after remediation is complete. Unauthorized boat access to Goose Cove will be controlled during remediation activities.Goose Cove sediment removal can be completed using mechanical or hydraulic methods. Sediment removed from Goose Cove will be hydraulically pumped approximately 1,500 feet to a CAD cell (former mine pit) for tremie placement. Real time hydrogen sulfide air monitoring will be required at the disposal location following an approved UFP-QAPP prepared by the Contractor. To protect against unintended releases of excessive sediment plumes, a turbidity curtain and turbidity monitoring may be required.The former Callahan Mine was a hard-rock, open-pit mine developed in Goose Pond, a shallow tidal estuary of approximately 75 acres in the Town of Brooksville, Maine. The Site is located approximately 15 miles west of the town of Blue Hill and 35 miles west of the town of Bar Harbor on the northwest side of the Cape Rosier peninsula on Penobscot Bay.Goose Cove is a narrow 15.5-acre inlet located adjacent to the northwestern end of Goose Pond, immediately north of Goose Falls. During early mine operations, groundwater seepage into the pit and entrained rock dust were pumped to an outfall in Goose Cove. This effluent likely contained fine grained drilling and blasting waste. Because of concerns about sediment accumulation in Goose Cove, an embayment within Goose Pond (Dyer Cove) was dammed off and used as a settling pond to remove a portion of the sediment (rock flour and silt) prior to discharge to Goose Cove. In addition, berms were constructed across portions of Goose Pond to separate surface water flows from mine operating areas and provide a sedimentation basin for overflow and decant discharge from the Tailings Impoundment. As a result of these operations, deposits of light gray, talcose sediment (termed mine waste) accumulated in portions of Goose Cove, Dyer Cove, and South Goose Pond. Areas of mapped mine waste (MACTEC, 2009) coincide with areas used as effluent settling ponds, effluent discharge locations, and sumps. There is an approximate 1.5-acre area (MACTEC, 2009) in Goose Cove coinciding with mine waste deposits like those in Goose Pond.
Files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0001.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0005.pdf | ||
| Amendment 0004 - Attachment 1.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0002_WD ME20250001 - 21Feb2025.pdf | ||
| Amendment 0002_Laboratory Report.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Remediate Contaminated Sediment in Goose Cove to Support the Callahan Mine Superfund Site in Brooksville, Maine | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine | ENDIST New England | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity