Entry Security Screening Station

Closed Solicitation Posted

Solicitation number
ALND24-005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Birmingham, Alabama 35203, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. District Court for the Northern District of Alabama is requesting open market quotes to construct an Entry Security Screening Station (ESSS) at the Hugo L. Black U.S. Courthouse in Birmingham, Alabama. The primary requirements include modifying the current ESSS, demolishing and disposing of existing materials, completing any necessary hazardous material abatement, protecting existing finishes, complying with accessibility standards, installing necessary infrastructure and automatic egress gating, and tying controls into the ongoing Physical Access Control System. The government will evaluate quotes based on the lowest priced, technically acceptable proposal. Quotes are due by 4:00 p.m. CST on September 6, 2024, and the period of performance is 270 days from the Notice-to-Proceed.

This opportunity is not set aside and does not have any incumbent contractors listed. The total budget or award value is not specified. The place of performance is the Hugo L. Black U.S. Courthouse in Birmingham, Alabama. The North American Industry Classification System (NAICS) code for this project is 236220 - Commercial and Institutional Building Construction, and the Product and Service Code (PSC) is Z2AZ - Repair Or Alteration Of Other Administrative Facilities And Service Buildings.

Notice text

3 versions

Update #3 · Latest ·

***PLEASE SEE ATTACHED ADDENDUM NO. 1 ATTACHED TODAY SEPTEMBER 10, 2024****

The U.S. District Court for the Northern District of Alabama is requesting open market quotes to construct an Entry Security Screening Station (ESSS) at the Hugo L. Black U.S. Courthouse, 1729 5th Avenue North, Birmingham, Alabama. The primary requirements are as follows:

  • Modify the current ESSS and adjacent UDDC public display space to reconfigure and expand the ESSS;
  • Demolish, remove, and dispose of all waste materials;
  • Complete any necessary hazardous material abatement;
  • All flooring, doors, furniture and hardware are to be protected;
  • Finish all surfaces to match current, including sanding, priming, painting/staining, molding, finishings, as necessary;
  • Comply with the Architectural Barriers Act Accessibility Standard (ABAAS);
  • Install necessary infrastructure to support anticipated security equipment;
  • Install automatic egress gating;
  • Tie all controls into ongoing Physical Access Control System (PACS);
  • All tools/waste are the contractor's responsibility, and the courthouse must be accessible and presentable during working hours (building dumpsters shall not be used for disposal)

All bidders may request a site visit and will be accommodated.

An Initial Construction Documents will set the framework and general scope of work for this project. Due to the sensitivity of the courthouse drawings and the Court's strict security standards, the Initial Construction Documents will not be included with the Request for Quotation or the Statement of Work. It will be provided to all potential bidders, upon request. Additionally, Final Construction Drawings will be provided to all requesters by August 2, 2024.

FAR clause 28.102-2

Update #2 ·

The U.S. District Court for the Northern District of Alabama is requesting open market quotes to construct an Entry Security Screening Station (ESSS) at the Hugo L. Black U.S. Courthouse, 1729 5th Avenue North, Birmingham, Alabama. The primary requirements are as follows:

  • Modify the current ESSS and adjacent UDDC public display space to reconfigure and expand the ESSS;
  • Demolish, remove, and dispose of all waste materials;
  • Complete any necessary hazardous material abatement;
  • All flooring, doors, furniture and hardware are to be protected;
  • Finish all surfaces to match current, including sanding, priming, painting/staining, molding, finishings, as necessary;
  • Comply with the Architectural Barriers Act Accessibility Standard (ABAAS);
  • Install necessary infrastructure to support anticipated security equipment;
  • Install automatic egress gating;
  • Tie all controls into ongoing Physical Access Control System (PACS);
  • All tools/waste are the contractor's responsibility, and the courthouse must be accessible and presentable during working hours (building dumpsters shall not be used for disposal)

All bidders may request a site visit and will be accommodated.

An Initial Construction Documents will set the framework and general scope of work for this project. Due to the sensitivity of the courthouse drawings and the Court's strict security standards, the Initial Construction Documents will not be included with the Request for Quotation or the Statement of Work. It will be provided to all potential bidders, upon request. Additionally, Final Construction Drawings will be provided to all requesters by August 2, 2024.

FAR clause 28.102-2

Update #1 ·

The U.S. District Court for the Northern District of Alabama is requesting open market quotes to construct an Entry Security Screening Station (ESSS) at the Hugo L. Black U.S. Courthouse, 1729 5th Avenue North, Birmingham, Alabama. The primary requirements are as follows:

  • Modify the current ESSS and adjacent UDDC public display space to reconfigure and expand the ESSS;
  • Demolish, remove, and dispose of all waste materials;
  • Complete any necessary hazardous material abatement;
  • All flooring, doors, furniture and hardware are to be protected;
  • Finish all surfaces to match current, including sanding, priming, painting/staining, molding, finishings, as necessary;
  • Comply with the Architectural Barriers Act Accessibility Standard (ABAAS);
  • Install necessary infrastructure to support anticipated security equipment;
  • Install automatic egress gating;
  • Tie all controls into ongoing Physical Access Control System (PACS);
  • All tools/waste are the contractor's responsibility, and the courthouse must be accessible and presentable during working hours (building dumpsters shall not be used for disposal)

All bidders may request a site visit and will be accommodated.

An Initial Construction Documents will set the framework and general scope of work for this project. Due to the sensitivity of the courthouse drawings and the Court's strict security standards, the Initial Construction Documents will not be included with the Request for Quotation or the Statement of Work. It will be provided to all potential bidders, upon request. Additionally, Final Construction Drawings will be provided to all requesters by August 2, 2024.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity