Emergency streambank stabilization vermilion county, IL

Closed Solicitation Posted

Solicitation number
W912QR25BA005
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Vermilion, Illinois, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Louisville District is seeking a contractor for emergency streambank stabilization along the Middle Fork Vermilion River in Vermilion County, Illinois. The project involves stabilizing an eroding riverbank that threatens County Road 21 through a comprehensive engineering intervention. Specific work includes clearing vegetation, installing 40-inch thick riprap with an 8-inch bedding stone filter layer, constructing a riprap drainage ditch, and implementing erosion control measures. Contractors must submit electronic bids through the PIEE system by February 20, 2025, at 10:00 AM Eastern Time, with a virtual bid opening scheduled for 11:00-11:30 AM. A pre-bid site visit was conducted on January 23, 2025, to provide potential bidders with project details and site understanding. The contract will be awarded based on the lowest price technically acceptable method, with careful consideration of the proposed approach to streambank restoration.

The solicitation is a total small business set-aside under NAICS code 237990 with a size standard of $45 million. The project covers approximately 1.64 acres and requires completion within 240 calendar days after receiving the notice to proceed, with all in-water work to be completed by April 30. Performance and payment bonds are required, with liquidated damages set at $1,320 per calendar day of delay. The estimated project scope includes stabilizing approximately 380 linear feet of riverbank, with work restricted to operating above elevation 625 feet and a 14.7-mile detour route planned during road closure. Contractors must adhere to strict environmental controls, including implementing erosion and sediment control measures before land disturbance and using native seed mixes for revegetation. The place of performance is Vermilion County, Illinois, with a total estimated construction time extended from the original 180 to 240 calendar days.

Notice text

2 versions

Update #2 · Latest ·

The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.

Update #1 ·

The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.