W912QR25BA005_Plans-0000.pdf

PDF 15 MB Posted

Attached to
EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL
Solicitation number
W912QR25BA005
Issued by

About this file

This is a set of construction plans from the U.S. Army Corps of Engineers Louisville District for emergency streambank stabilization along County Road 21 in Vermilion County, Illinois. The project involves stabilizing an eroding bank of the Middle Fork Vermilion River where it threatens the roadway.

The plans detail the installation of riprap bank protection and include demolition plans, erosion control measures, grading plans, and cross sections. Key specifications include: installation of 40-inch thick riprap with 8-inch bedding stone filter layer, construction of a riprap drainage ditch, temporary turbidity barriers during construction, and revegetation of the stabilized slope. The work area spans approximately 450 linear feet along the riverbank, with equipment restricted to operating above elevation 625 feet. Traffic control plans show a 14.7-mile detour route during full road closure. Environmental controls include requirements for completing in-water work by April 30 and implementation of erosion/sediment control measures before any land disturbance begins.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FISCHER.NATHAN.RO

BERT.1601768328

Digitally signed by

FISCHER.NATHAN.ROBERT.1601768328

Date: 2024.12.12 08:51:12 -05'00'

FISCHER.NATHAN.R

OBERT.1601768328

Digitally signed by

FISCHER.NATHAN.ROBERT.16017683

Date: 2024.12.12 08:52:41 -05'00'

DETTLINGER.ZACHAR

Y.DANE.1622031996

Digitally signed by

DETTLINGER.ZACHARY.DANE.1622031996

Date: 2024.12.12 09:11:30 -05'00'

CARTER.CLIFTON.E.1591144444

Digitally signed by

CARTER.CLIFTON.E.1591144444

DN: CN=CARTER.CLIFTON.E.1591144444,

OU=USA, OU=PKI, OU=DoD, O=U.S.

Government, C=US Date: 2024.12.12 09:32:12-05'00'

GREGORY.BRENNAN.A.1588041766

Digitally signed by

GREGORY.BRENNAN.A.1588041766

Date: 2024.12.12 10:24:00 -05'00'

SCHARDEIN.SAMAN

THA.L.1551058820

Digitally signed by

SCHARDEIN.SAMANTHA.L.1551058820

Date: 2024.12.12 10:37:02 -05'00'

SPRINGSTON.ERIC.MA

TTHEW.1401439826

Digitally signed by

SPRINGSTON.ERIC.MATTHEW.14014398

Date: 2024.12.12 10:47:27 -05'00'

WEILBAKER.ISAIAH.A.13

00849012

Digitally signed by

WEILBAKER.ISAIAH.A.1300849012

Date: 2024.12.12 13:18:11 -05'00'

HUDSON.NICHOLAS

.R.1537987410

Digitally signed by

HUDSON.NICHOLAS.R.1537987410

Date: 2024.12.16 14:06:08 -05'00'

Digitally signed by

MITCHELL.IAN.F.1300565227

Date: 2025.01.14 08:30:14 -05'00'

15 January 2025

W912QR25BA005

W

2Q R

BA

5_

Pl an s-

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TomTom

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

R

IV

E R

IL

L

IN

O

IS

RIVERMISSOURI

COUNTY

VERMILION

INDIANA

ILLINOIS

MISSOURI

IOWA

WISCONSIN

KENTUCKY

R

IV

E R

M

IS

S

IS

S

IP

P I

ST. LOUIS

AURORA

CHICAGO

CEDAR RAPIDS

PROJECT LOCATION

H1

AREA MAP

SCALE: NTS

DES MOINES

H12

VICINITY MAP

SCALE: NTS

A12

LOCATION MAP

SCALE: NTS

INDIANAPOLIS

GI002

N

F

IS

C H

E R

G P

IO

T

R O

W S

K I

B G

R E

G O

R Y

A N

S I

D

S

IT

E

L O

C A

T

IO

N A

N D

V

IC

IN

IT

Y M

A P

PROJECT LOCATION

O

T O

M A

C C

O L

L

IS

O N

R O

A D

E 2500 NORTH ROAD

R O

A D

N

E

A S

T

ROAD

E 2600 NORTH

ROAD

E 2600 NORTH

R O

A D

N

E

A S

T

E 2750 NORTH ROAD

N

E

A S

T R

O A

D

W

2Q R

BA

5_

Pl an s-

GR401

H9

GR401

H1

GR401

A1

A9

GR403

H1

GR402

A9

GR402

A1

H9

GR402

H1

N

E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

12"

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

FO

R K

V E R

M

ILLIO

N R

IV

E R

F L O

W

FLOW

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PHOTOS ON SHEETS GR401 TO GR403 WERE TAKEN ON 16 MAY 2023.2.

SEE SHEET GR401 FOR PHOTOGRAPHS.1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

CONTRACTOR WORK LIMITS

N

F

IS

C H

E R

B G

R E

G O

R Y

VIEW DIRECTION INDICATORX-###

X#

GR101

A

S

O

V E

R A

L L

P H

O T

O L

O C

A T

IO

N

P L

A N

A1

OVERALL PHOTO LOCATION PLAN

1"=40'SCALE: 40' 80'0

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

W

2Q R

BA

5_

Pl an s-

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

ALL PHOTOS WERE TAKEN ON 16 MAY 2023.2.

SEE SHEET GR101 FOR PHOTOGRAPH LOCATIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

N

F

IS

C H

E R

B G

R E

G O

R Y

F

GR401

S

E

C O

N D

IT

IO

N P

IC

T

U R

E S

COUNTY ROAD 21 TO BE PARTIALLY DEMOED LOOKING SOUTH

SCALE: NTS

H9

REPAIR AREA BETWEEN GUARDRAIL AND BARRIER LOOKING UPSTREAM

SCALE: NTS

A1

REPAIR AREA ERODING PAST GUARDRAIL

SCALE: NTS

A9

COUNTY ROAD 21 TO BE PARTIALLY DEMOED LOOKING NORTH

SCALE: NTS

H1

W

2Q R

BA

5_

Pl an s-

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

ALL PHOTOS WERE TAKEN ON 16 MAY 2023.2.

SEE SHEET GR101 FOR PHOTOGRAPH LOCATIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

N

F

IS

C H

E R

B G

R E

G O

GR402

S

E

C O

N D

IT

IO

N P

IC

T

U R

E S

REPAIR AREA LOOKING DOWNSTREAM

SCALE: NTS

H9

REPAIR AREA ERODING PAST GUARDRAIL

SCALE: NTS

A1

CREEK LOOKING DOWNSTREAM

SCALE: NTS

A9

REPAIR AREA LOOKING UPSTREAM

SCALE: NTS

H1

W

2Q R

BA

5_

Pl an s-

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

ALL PHOTOS WERE TAKEN ON 16 MAY 2023.2.

SEE SHEET GR101 FOR PHOTOGRAPH LOCATIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

N

F

IS

C H

E R

B G

R E

G O

GR403

S

E

C O

N D

IT

IO

N P

IC

T

U R

E S

CREEK VIEW FROM ROAD LOOKING UPSTREAM

SCALE: NTS

H1

W

2Q R

BA

5_

Pl an s-

SPOIL AREA

PROJECT

AREA

N

E R

D H

M A

E 2600 N

RD HMA

MID

DLE

FORK V

ERMIL

LIO

N R

IVER

M

ID

D

LE FO

R

K VER

M

ILLIO

N R

IVER

F

LO

W

F L O

W

UU

U

U

U

U

PARKING LOT AGG

TIMBER

TIMBER

TIMBER

TIMBER

12"

14"

N 1,302,965.79

E 1,140,368.48

N 1,302,512.30

E 1,140,753.13

N 1,302,355.09

E 1,140,692.89

N 1,302,338.32

E 1,140,437.57

N 1,302,836.22

E 1,140,033.03

N 1,302,924.53

E 1,140,180.15

N 1,300,708.84

E 1,140,768.12

N 1,300,543.70

E 1,140,763.11

N 1,300,462.43

E 1,140,793.53

N 1,300,211.41

E 1,140,958.55

N 1,300,153.09

E 1,140,762.04

N 1,300,451.63

E 1,140,664.53

N 1,300,539.33

E 1,140,599.26

N 1,300,612.17

E 1,140,535.84

N 1,300,727.56

E 1,140,668.37

N 1,302,906.17

E 1,140,091.30

N 1,302,868.80

E 1,140,113.91

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

AERIAL IMAGERY IS FROM 2019.3.

FOR ANY CHANGES TO WORK LIMITS AND SPOIL AREAS.

CONTRACTOR MUST COORDINATE WITH THE CONTRACTING OFFICER (COR) 2.

LIMITS.

STAGING AND LAYDOWN AREAS MUST BE CONTAINED WITHIN THE WORK 1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

APROXIMATE CONTRACTOR WORK LIMITS

APROXIMATE CONTRACTOR STAGING AREAS

B G

R E

G O

R Y

N

F

IS

C H

E

VA101

S

E

R A

L L

A E

R

IA

L S

U R

V E

Y

A1

OVERALL AERIAL SURVEY

1"=200'SCALE: 400'0 200'

W

2Q R

BA

5_

Pl an s-

U

PARKING LOT AGG

N E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

TIMBER

TIMBER

TIMBER

TIMBER

12"

14"

TRAIL

TR

AI

L

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

F

O R

K V

E R

M

ILLIO

N R

IV

E R

FLOW

FLOW

FL

O

W

TO BE REMOVED BY OTHERS

EXISTING TRAFFIC CONTROL

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PRIOR TO CONSTRUCTION.

UTILITY LOCATIONS. SURVEY CONTROL POINT ELEVATIONS WILL BE VERIFIED

FOR VERIFYING EXISTING CONDITIONS SUCH AS EXISTING ELEVATIONS AND

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE 6.

SURVEY CONTROL POINTS SHOWN ON PLANS.

HORIZONTAL CONTROL ON SITE FOR PROJECT CONSTRUCTION FROM

THE CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN VERTICAL AND 5.

SURVEY COMPLETED AUGUST 2023.4.

THE VERTICAL DATUM IS NAVD 1988.3.

THE HORIZONTAL DATUM IS ILLINOIS EAST ZONE (NAD 83/2011).2.

SEE SHEET VF401 FOR CONTROL POINT DESCRIPTIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

SHEET KEYNOTES

BORING B-2 (ESTIMATED LOCATION)4.

BORING B-1 (SURVEYED LOCATION)3.

PE42.

PE11.

LEGEND

CONTRACTOR WORK LIMITS

CONTROL POINT

N

F

IS

C H

E R

B G

R E

G O

D C

O N

T R

O L

P O

IN

T

L O

C A

T

IO

VF101

S

E

R A

L L

E X

IS

T

IN

G

C O

N D

IT

IO

N S

A1

OVERALL EXISTING CONDITIONS AND CONTROL POINT LOCATIONS

1"=60'SCALE: 60' 120'0

W

2Q R

BA

5_

Pl an s-

A1

MONUMENT DESCRIPTIONS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PRIOR TO CONSTRUCTION.

UTILITY LOCATIONS. SURVEY CONTROL POINT ELEVATIONS WILL BE VERIFIED

FOR VERIFYING EXISTING CONDITIONS SUCH AS EXISTING ELEVATIONS AND

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE 6.

SURVEY CONTROL POINTS SHOWN ON PLANS.

HORIZONTAL CONTROL ON SITE FOR PROJECT CONSTRUCTION FROM

THE CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN VERTICAL AND 5.

SURVEY COMPLETED AUGUST 2023.4.

THE VERTICAL DATUM IS NAVD 1988.3.

THE HORIZONTAL DATUM IS ILLINOIS EAST ZONE (NAD 83/2011).2.

SEE SHEET VF101 FOR CONTROL POINT LOCATIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

N

F

IS

C H

E R

B G

R E

G O

R Y

PRIOR TO CONSTRUCTION.

UTILITY LOCATIONS. SURVEY CONTROL POINT ELEVATIONS WILL BE VERIFIED

FOR VERIFYING EXISTING CONDITIONS SUCH AS EXISTING ELEVATIONS AND

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE 6.

SURVEY CONTROL POINTS SHOWN ON PLANS.

HORIZONTAL CONTROL ON SITE FOR PROJECT CONSTRUCTION FROM

THE CONTRACTOR WILL BE RESPONSIBLE TO MAINTAIN VERTICAL AND 5.

SURVEY COMPLETED AUGUST 2023.4.

THE VERTICAL DATUM IS NAVD 1988.3.

THE HORIZONTAL DATUM IS ILLINOIS EAST ZONE (NAD 83/2011).2.

SEE SHEET VF101 FOR CONTROL POINT LOCATIONS.1.

GENERAL SHEET NOTES

T F

R O

S T

N

F

IS

C H

E R

B G

R E

G O

R Y

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

VF401

S

C

N

T R

O L

P O

IN

T

D E

S C

R

IP

T

IO

N S

W

2Q R

BA

5_

Pl an s-

U U

U

U

U

M

ID

D L E F

O R

K

V E R

M

IL

L

IO

N R

IV

E R

PARKING LOT AGG

N E R

D

H M

A

N

E R

D H

M A

MI

DDLE

FORK

VERMI

LL

IO

N R

IVER

N

E R

D H

M A

E 2600 N

RD HMA

F L O

W

F

LO

W

RW103

RW102

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PROPERTY LINES WERE OBTAINED FROM THE VERMILION COUNTY RECORDS.2.

DISCREPANCIES.

WORK EXTENTS AND COORDINATE WITH COR IF THERE ARE ANY

PROPERTY BOUNDAIRES ARE APPROXIMATE. CONTRACTOR TO VERIFY ALL

PROPERTY BOUNDARY SURVEYS WERE NOT COMPLETED AND THE 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

LEGEND

RIGHT-OF-WAY LIMITS

PROPERTY LINES

BANK PROTECTION EASEMENT

TEMPORARY WORK AREA EASEMENT

B G

R E

G O

R Y

N

F

IS

C H

RW101

S

E

R A

L L

R

IG

H T

-O F

-W A

Y P

L A

N

A1

(FOR REFERENCE ONLY)OVERALL RIGHT-OF-WAY PLAN

1"=200'SCALE: 400'0 200'

W

2Q R

BA

5_

Pl an s-

U U

U

U

U

12"

N 1,300,727.560

E 1,140,668.371

N 1,300,612.172

E 1,140,535.844

N 1,300,451.626

E 1,140,664.526

N 1,300,153.091

E 1,140,762.041

N 1,300,211.412

E 1,140,958.549

N 1,300,462.426

E 1,140,793.532

N 1,300,543.702

E 1,140,763.108

N 1,300,708.841

E 1,140,768.115

N 1,300,539.33

E 1,140,599.26

F L O

W

FLOW

F L

O W

BANK PROTECTION EASEMENT

1.64 ACRES

TEMPORARY WORK AREA EASEMENT

0.52 ACRES

N 1,300,714.45

E 1,140,738.16

N 1,300,570.67

E 1,140,722.71

N 1,300,424.65

E 1,140,762.58

N 1,300,199.11

E 1,140,917.05

N

E R

D H

M A

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PROPERTY LINES WERE OBTAINED FROM THE VERMILION COUNTY RECORDS.2.

DISCREPANCIES.

WORK EXTENTS AND COORDINATE WITH COR IF THERE ARE ANY

PROPERTY BOUNDAIRES ARE APPROXIMATE. CONTRACTOR TO VERIFY ALL

PROPERTY BOUNDARY SURVEYS WERE NOT COMPLETED AND THE 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

LEGEND

RIGHT-OF-WAY LIMITS

PROPERTY LINES

BANK PROTECTION EASEMENT

TEMPORARY WORK AREA EASEMENT

B G

R E

G O

R Y

N

F

IS

C H

RW102

S

IG

H

T -O

F -W

A Y

P L

A N

A1

- PROJECT AREA (FOR REFERENCE ONLY)1 OF 2 RIGHT-OF-WAY PLAN

1"=40'SCALE: 40' 80'0

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

W

2Q R

BA

5_

Pl an s-

N 1,302,965.79

E 1,140,368.48

N 1,302,512.30

E 1,140,753.13

N 1,302,355.09

E 1,140,692.89

N 1,302,338.32

E 1,140,437.57

N 1,302,836.22

E 1,140,033.03

N 1,302,868.80

E 1,140,113.91

N 1,302,924.53

E 1,140,180.15

N 1,302,906.17

E 1,140,091.30

TEMPORARY WORK AREA EASEMENT

5.52 ACRES

E 2 N

RD H

MA

F

LO

W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PROPERTY LINES WERE OBTAINED FROM THE VERMILION COUNTY RECORDS.2.

DISCREPANCIES.

WORK EXTENTS AND COORDINATE WITH COR IF THERE ARE ANY

PROPERTY BOUNDAIRES ARE APPROXIMATE. CONTRACTOR TO VERIFY ALL

PROPERTY BOUNDARY SURVEYS WERE NOT COMPLETED AND THE 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

LEGEND

RIGHT-OF-WAY LIMITS

PROPERTY LINES

BANK PROTECTION EASEMENT

TEMPORARY WORK AREA EASEMENT

B G

R E

G O

R Y

N

F

IS

C H

RW103

S

IG

H

T -O

F -W

A Y

P L

A N

A1

- SPILL AREA (FOR REFERENCE ONLY)2 OF 2 RIGHT-OF-WAY PLAN

1"=40'SCALE: 40' 80'0

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

W

2Q R

BA

5_

Pl an s-

1 1

N

E

A S

T R

D

E 2500 NORTH RD

E

A S

T R

D

P O

T O

M A

C C

O L

L

IS

IO

N

R D

E 3000 NORTH RD

N

E

A S

T R

D

E 2600

NORTH RD

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

PROJECT COMPLETION.

VERMILION COUNTY TO CONTINUE MAINTENANCE OF TRAFFIC BEYOND

TRAFFIC BARRICADES AND SIGNS TO REMAIN AND BECOME PROPERTY OF 9.

PROPOSED ROUTE IS APPROXIMATELY 14.7 MILES.8.

COUNTY ROAD 21.

AND ALL RELEVANT PARTIES FOR APPROVAL OF A FULL ROAD CLOSURE OF

NOT LIMITED TO, A NEW TRAFFIC CONTROL PLAN, TO VERMILION COUNTY, IL

CONTRACTOR MUST SUBMIT APPROPRIATE DOCUMENTS INCLUDING, BUT 7.

CLOSURES.

DISTRICTS, POST OFFICES, AND OTHER MUNICIPAL ENTITIES FOR ROAD

CONTRACTOR MUST COORDINATE WITH 911 CALL CENTERS, SCHOOLS 6.

APPROVED BY THE COR.

TRAFFIC CONTROL PLAN MUST BE SUBMITTED BY THE CONTRACTOR AND 5.

MINIMUM DISTANCES MAY VARY ON FIELD CONDITIONS.4.

OF THE MUTCD WAS FOLLOWED FOR THIS DIAGRAMMETRIC DETOUR PLAN.

THE DIAGRAMMATIC DETOUR PLAN INDICATED AND TYPICAL APPLICATION 8 3.

AND CONSTRUCTION RESPONSIBILITIES.

FOR ALL NEW UTILITIES, REFER TO THE RFP SPECIFICATIONS FOR DESIGN 2.

CONTRACTOR.

VISIBLE FEATURES. ACTUAL LOCATION SHALL BE VERIFIED BY THE

LOCATIONS OF EXISTING UTILITIES PROVIDED FROM UTILITY MAPS AND 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

PROPOSED MUTCD SIGNS; M4-8A, M3-3, M1-6.211.

PROPOSED MUTCD SIGNS; M4-8A, M3-1, M1-6.210.

PROPOSED MUTCD SIGNS; R11-3A, M4-10R, WITH BARRICADES9.

M5-1 LEFT ADVANCE TURN ARROW

PROPOSED MUTCD SIGNS; 2 M4-8, 2 M1-6.2, M6-1 LEFT DIRECTIONAL ARROW, 8.

ARROW, M5-1 RIGHT ADVANCE TURN ARROW

PROPOSED MUTCD SIGNS; 2 M4-8, 2 M1-6.2, M6-1 RIGHT DIRECTIONAL 7.

PROPOSED MUTCD SIGNS; M4-8, M3-3, M1-6.26.

PROPOSED MUTCD SIGNS; M4-8, M3-1, M1-6.25.

ARROW, M5-1 LEFT ADVANCE TURN ARROW

PROPOSED MUTCD SIGNS; W20-2, 2 M4-8, 2 M1-6.2, M6-1 LEFT DIRECTIONAL 4.

PROPOSED MUTCD SIGNS; R11-3A, M4-10L, WITH BARRICADES3.

PROPOSED MUTCD SIGNS; 2 W20-3, R11-2, WITH BARRICADES2.

PROPOSED DETOUR ROUTE1.

LEGEND

CONTRACTOR WORK LIMITS

DETOUR ROUTE

DETOUR ROUTE INTERSECTION

N

F

IS

C H

E R

B G

R E

G O

R Y

1500 FT

DETOUR

DETOUR DETOUR

DETOUR

LOCAL TRAFFIC ONLY

ROAD CLOSED

10 MILES AHEAD

ORTHN

DETOUR

OUTHS

END

DETOUR

DETOUR DETOUR

DETOUR DETOUR

ORTHN

DETOUR

DETOUR

LOCAL TRAFFIC ONLY

ROAD CLOSED

10 MILES AHEAD

OUTHS

DETOUR

OUTHS

DETOUR

END

DETOUR

ORTHN

DETOUR DETOUR

DETOUR DETOUR

OUTHS

DETOUR

ORTHN

DETOUR

OUTHS

DETOUR

DETOUR

ORTHN

DETOUR DETOUR DETOUR DETOUR

ROAD

CLOSED

CLOSED

ROAD

500 FT

CLOSED

ROAD

1000 FT

ROAD

CLOSED

CLOSED

ROAD

500 FT

CLOSED

ROAD

1000 FT

1500 FT

DETOUR

DETOUR DETOUR

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

21 VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

VERMILION

COUNTY

TC101

S

T

A

F F

IC

C

O N

T R

O L

P L

A N

A1

TRAFFIC CONTROL PLAN

1"=2000'SCALE: 0 4000'2000'

W

2Q R

BA

5_

Pl an s-

BORING LOGS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

B

R

IN

G L

O G

BB601

S C

H A

R D

E

IN

T F

R O

S T

C H

E C

K E

R

S U

B M

IT

T

E R

A N

S

W

2Q R

BA

5_

Pl an s-

E 2600 N

RD HMA

N

E R

D H

M A

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

F

LO

WF

L O

W

U U

U

U

U

U

GC103

GC104

GC102

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

EQUIPMENT WILL NOT BE ALLOWED BELOW ELEVATION 625 FEET.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

I.

W

E

IL

B A

K E

R

N

F

IS

C H

E R

C

C A

R T

E R

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

SURFACING

OVER ALL DISTURBED AREAS NOT TO RECEIVE RIPRAP

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

DIRECTION OF FLOW

PERMANENT FIBER ROLL

TEMPORARY TURBIDITY BARRIER

CHECK DAM

D S

E D

IM

E

N T

C O

N T

R O

L P

L

GC101

S

E

R A

L L

E R

O S

IO

N

P R

E V

E N

T

IO

N

A1

AND SEDIMENT CONTROL PLAN OVERALL EROSION PREVENTION

1"=200'SCALE: 400'0 200'

W

2Q R

BA

5_

Pl an s-

E 2 N

RD H

MA

M

ID

D

LE

FO

R K V

E R

M

ILLIO

N R

IV

E R

WOODS

F

LO

W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

EQUIPMENT WILL NOT BE ALLOWED BELOW ELEVATION 625 FEET.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

SURFACING

OVER ALL DISTURBED AREAS NOT TO RECEIVE RIPRAP

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

GC102

S

O

S

IO

N P

R E

V E

N T

IO

N

A1

1 OF 3 AND SEDIMENT CONTROL PLAN EROSION PREVENTION

1"=40'SCALE: 40' 80'0

W

2Q R

BA

5_

Pl an s-

WOODS

WOODS

U U

U

MATCH LINE SEE SHEET GC103

MATCH LINE SEE SHEET GC102

N

E R

D H

M A

TIMBER

V E R

M

ILLIO

N R

IV

E R

M

ID

D

LE

FO

R K

FLOW

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

EQUIPMENT WILL NOT BE ALLOWED BELOW ELEVATION 625 FEET.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

SURFACING

OVER ALL DISTURBED AREAS NOT TO RECEIVE RIPRAP

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

GC103

S

O

S

IO

N P

R E

V E

N T

IO

N

A1

2 OF 3 AND SEDIMENT CONTROL PLAN EROSION CONTROL PLAN

1"=20'SCALE: 20' 40'0

W

2Q R

BA

5_

Pl an s-

12"

MATCH LINE SEE SHEET GC103

MATCH LINE SEE SHEET GC102

N E R

D H

M A

TIMBER

12"

VERMI

LL

IO

N

RI

VER

MI

DDLE

FORK

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

EQUIPMENT WILL NOT BE ALLOWED BELOW ELEVATION 625 FEET.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

SURFACING

OVER ALL DISTURBED AREAS NOT TO RECEIVE RIPRAP

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

GC104

S

O

S

IO

N P

R E

V E

N T

IO

N

A1

3 OF 3 AND SEDIMENT CONTROL PLAN EROSION CONTROL PLAN

1"=20'SCALE: 40' 80'0

W

2Q R

BA

5_

Pl an s-

4"-6"

6"

5 7

A B

C

A

B C

NOTES: HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY

TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE

CHANNEL SURFACE.

CRITICAL POINTS

A. OVERLAPS AND SEAMS

B. PROJECTED WATER LINE

C. CHANNEL BOTTOM/SIDE SLOPE VERTICES

4"- 6"

12"

3B

3A

6"

MINIMUM 9"

24" MAXIMUM

24" MAXIMUM

NOTES:

1. CHECK DAMS ARE TO BE USED ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO BE USED IN LIVE STREAMS).

2. THE DRAINAGE AREA FOR STONE CHECK DAMS SHALL NOT EXCEED TWO ACRES.

3. THE CENTER OF THE CHECK DAM MUST BE AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES.

4. THE DAM HEIGHT SHOULD BE A MAXIMUM OF 2 FEET FROM CENTER TO RIM EDGE.

5. THE SIDE SLOPES OF THE CHECK DAM SHALL NOT EXCEED A 2:1 SLOPE.

6. GEOTEXTILE SHALL BE USED TO PREVENT THE MITIGATION OF SUBGRADE SOIL PARTICLES INTO THE STONES.

CROSS SECTION

CHECK DAM SPACING

L A B

A = THE TOE OF THE UPSTREAM CHECK DAM.

B = TOP OF THE DOWNSTREAM CHECK DAM.

L = THE DISTANCE SUCH THAT POINTS A AND

B ARE OF EQUAL ELEVATION.

FLOW

6" MINIMUM PROFILE

12" LAYER

CA-1, CA-2, CA-3,

OR CA-4 AGG

IDOT RR-3 OR RR-4 RIPRAP

GEOTEXTILE FABRIC

IDOT RR-3 OR RR-4 RIPRAP

EROSION CONTROL BLANKET STONE CHECK DAM

A15

A11

ROCK FILTER DAM

A1

SCALE: NTS

SECTION NTS

PLAN NTS

8" MIN. FILTER SOCK

AREA TO BE PROTECTEDWORK AREA

WORK AREA

AREA TO BE PROTECTED

8" MIN. FILTER SOCK

WATER FLOW

PAVEMENT OR

IMPERVIOUS SURFACE

CONCRETE BLOCKS OR SAND BAGS

SIZED AS NEEDED (10' O.C.)

CONCRETE BLOCKS OR SAND BAGS

SIZED AS NEEDED (10' O.C.)

PAVEMENT APPLICATION

WORK AREA

PYRAMID STAKING DETAIL

18" MIN.

ALTERNATE STAKING

OPTION

CLOSED END

STAKE

SECTION VIEW

WORK AREA

TOP VIEW

NON-PAVEMENT APPLICATION

NOTES:

1. ALL MATERIAL TO MEET SPECIFICATIONS.

2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.

3. FILTER MEDIA TO BE DISPERSED ON SITE.

FL

O

W

TOP VIEW

SECTION VIEW

J1

SCALE: NTS

BIODEGRADABLE FILTER TUBE

FILTER SILT SOCK

(8", 9", OR 12" TYPICAL)

FILTER SILT SOCK

(8", 9" OR 12" TYPICAL)

NOTES:

1. ALL MATERIAL TO MEET MANUFACTURER'S SPECIFICATIONS.

2. FILTER TUBE/SILT SOCK FILL TO MEET APPLICATION REQUIREMENTS.

3. COMPOST MATERIAL TO BE DISPERSED ON SITE.

PUBLIC ROAD

PU

BLI

C R

O

AD

MATCH HAUL ROADOR AS REQUIRED TO 12'

50'

J11

SCALE: NTS

CONSTRUCTION ENTRANCE/EXIT

2"x2"x36" HARDWOOD STAKE @ 10' O.C.

START 5' FROM ANGLED STAKES

(2) 2"x2"x48+" HARDWOOD STAKES

WRAPPED WITH 16 GUAGE

AREA TO BE

PROTECTED

2" SQ. WOODEN STAKES

AT 10' ON CENTER

OVERLAPPING SECTIONS

FORM CONNECTION

2" SQ. WOODEN STAKES

AT 10' ON CENTER

WIRE @ 10' O.C.

CONNECTION/ATTAHMENT DETAIL

NOTE:

ROCK FILTER DAM IS TO BE CLEANED

OUT WHEN VOLUME BECOMES HALF FULL.

GEOTEXTILE

GEOTEXTILE

2:1 OR FLATTER

MINIMUM 9"

SLOPE APPLLICATION

1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY

NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. GROUND SURFACE MUST BE FREE OF DEBRIS, ROCKS, CLAY CLODS AND RAKED SMOOTH SUFFICIENT TO ALLOW INTIMATE CONTACT OF THE RECP WITH

THE SOIL OVER THE ENTIRETY OF THE INSTALLATION.

2.BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECPS IN A 6" DEEP X 6" WIDE TRENCH WITH

APPROXIMATELY 12" OF RECPS EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. USE

SHOREMAX MAT AT THE CHANNEUCULVERT OUTLET AS SUPPLEMENTAL SCOUR PROTECTION AS NEEDED.

ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES/PINS APPROXIMATELY 12" APART IN THE BOTTOM

OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TD THE

COMPACTED SOIL AND FOLD THE REMAINING 12" PORTION OF RECPS BACK OVER THE SEED AND

COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES/PINS

SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECPS.

3.ROLL CENTER RECPS IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECPS WILL UNROLL WITH

APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL

SURFACE BY PLACING STAPLES/STAKES/PINS IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE

PATTERN GUIDE.

4.PLACE CONSECUTIVE RECPS END-OVER-END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE

ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TD SECURE RECPS.

5. FULL LENGTH EDGE OF RECPS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF

STAPLES/STAKES/PINS SPACED AT Sr APART IN A6" DEEP X 6" WIDE TRENCH. BACKFILL ANDCOMPACT THE

TRENCH AFTER STAPLING.

6. ADJACENT RECPS MUST BE OVERLAPPED APPROXIMATELY 4"-6" AND SECURED WITH

STAPLES/STAKES/PINS AT St.

7.IN HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT

INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 6" APART AND 12" ON CENTER OVER ENTIRE

WIDTH OF THE CHANNEL.

8.THE TERMINAL END OF THE RECPS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES/PINS SPACED AT

St APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.

9. FASTENERS SHOULD PROVIDE A MINIMUM OF TWENTY POUNDS OF PULLOUT RESISTANCE. SIX-INCH X

ONE-INCH ELEVEN GAUGE STAPLES ARE TYPICALLY ADEQUATE. IN LOOSE SOILS, LONGER STAPLES MAY

BE NECESSARY, TWIST PINS CAN PROVIDE THE GREATEST PULLOUT RESISTANCE. IN HARD OR ROCKY

SOILS, STRAIGHT PINS MAY BY USED WHERE STAPLES OR TWIST PINS ARE REFUSED, PROVIDED THE

MINIMUM PULLOUT REQUIREMENTS ARE MET. BIO-DEGRADABLE FASTENERS SHALL NOT BE USED WITH

VMAX (TRM) OR TMAX (HPTRM) MATERIALS.

DITCH APPLLICATION

1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY

NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. GROUND SURFACE MUST BE FREE OF DEBRIS, ROCKS, CLAY CLODS AND RAKED SMOOTH SUFFICIENT TD ALLOW INTIMATE CONTACT OF THE RECP WITH

THE SOIL OVER THE ENTIRETY OF THE INSTALLATION.

2.BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECPS IN A6" DEEP X 6" WIDE TRENCH. ANCHOR

THE RECPS WITH A ROW OF STAPLES/STAKES/PINS SPACED AT Sr APART IN THE BOTTOM OF THE TRENCH.

BACKFILL AND COMPACT THE TRENCH AFTER STAPLING AND FOLD THE ROLL OVER

DOWNSLOPE. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES/PINS SPACED AT St

APART ACROSS THE WIDTH OF THE RECPS.

3. ROLL THE RECPS (A) DOWN OR (BJ HORIZONTALLY ACROSS THE SLOPE. RECPS WILL UNROLL WITH

APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TD SOIL

SURFACE BY PLACING STAPLES/STAKES/PINS IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE

PATTERN GUIDE. ROLLMAX RECPS AND ECBS SHOULD UTILIZE STAPLE PATTERN C, TRMS AND VMAX

MATERIALS SHOULD UTILIZE STAPLE PATTERN D.

4.THE EDGES OF PARALLEL RECPS MUST BE STAPLED WITH APPROXIMATELY 4" -6" OVERLAP.

5.CONSECUTIVE RECPS SPLICED DOWN THE SLOPE MUST OVERLAPPED WITH THE UPSTREAM MAT ATOP

THE DOWNSTREAM MAT (SHINGLE STYLE). THE OVERLAP SHOULD BE 4" -6".

6.AT THE TERMINAL END, SECURE EACH MAT ACROSS THE WIDTH WITH A ROW OF STAPLES/STAKES/PINS

SPACED AT Sr- IF EXPOSED TO FLOW, FOOT TRAFFIC, WIND UPLIFT OR OTHER DISRUPTION, TRENCH

THETERMINAL END IN AS SHOWN IN DETAIL.

7. FASTENERS SHOULD PROVIDE A MINIMUM OF TWENTY POUNDS OF PULLOUT RESISTANCE. SIX-INCH X

ONE-INCH ELEVEN GAUGE STAPLES ARE TYPICALLY ADEQUATE. IN LOOSE SOILS, LONGER STAPLES MAY

BE NECESSARY, TWIST PINS CAN PROVIDE THE GREATEST PULLOUT RESISTANCE. IN HARD OR ROCKY

SOILS, STRAIGHT PINS MAY BY USED WHERE STAPLES OR TWIST PINS ARE REFUSED, PROVIDED THE

MINIMUM PULLOUT REQUIREMENTS ARE MET. BIO-DEGRADABLE FASTENERS SHALL NOT BE USED WITH

VMAX (TRM) OR TMAX (HPTRM) MATERIALS.

IF GRADES ARE >/= 2%

DIVERSION RIDGE

SEPARATOR

GEOTEXTILE

CA-1, CA-2, CA-3, OR CA-4

6" LAYER

12" 12"

6"

6" 6"

15" MIN TEMPORARY CULVERT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

GC501

I.

E

IL

B A

K E

R

N

F

IS

C H

E R

C

C A

R T

E R

A N

S

O

S

IO

N C

O N

T R

O L

D E

T A

IL

S

W

2Q R

BA

5_

Pl an s-

TYPE 1

USAGE CHART

TYPE 2

PLAN VIEW - INSTALLATION FOR SHORELINE WORK

FLOATING TURBIDITY CURTAINS

TYPE

(FT/S)

CURRENT

MAXIMUM

0.0

3.5

5.0

ADDITIONAL CONDITIONS

No Wave/Wind/Tidal Action

Moving Water (One Direction)

TYPE 3

SEE NOTE 9

1. SELECT A TURBIDITY CURTAIN TYPE TO SUIT THE SITE

CONDITIONS AND MEET EROSION CONTROL AND WATER

QUALITY REQUIREMENTS. SUBMIT DETAILS AND

SPECIFICATIONS OF THE SELECTED TURBIDITY CURTAIN

TYPE TO THE CO FOR APPROVAL PRIOR TO INSTALLATION.

2. INSTALL THE TURBIDITY CURTAIN BEFORE COMMENCEMENT

OF ANY CONSTRUCTION ACTIVITIES THAT COULD IMPACT THE

AREA OF CONCERN.

3. INSTALL THE TURBIDITY CURTAIN PARALLEL TO THE DIRECTION

OF FLOW OF A MOVING BODY OF WATER. DO NOT INSTALL

THE TURBIDITY CURTAIN ACROSS THE MAIN FLOW OF A

SIGNIFICANT MOVING BODY OF WATER. DO NOT INSTALL THE

TURBIDITY CURTAIN WHERE THE FLOW OF WATER WILL REMOVE

ACCUMULATED SEDIMENT OR SIGNIFICANTLY MOVE THE

CURTAIN.

4. INSTALL TURBIDITY CURTAIN STAKES IN A VERTICAL POSITION

UNLESS OTHERWISE DIRECTED BY THE CO. INSTALL ANCHORS

AND STAKES AT A 100-FOOT MAXIMUM SPACING.

5. FOR TYPE 1 TURBIDITY CURTAINS, INSTALL ANCHORS MADE OF

WOODEN STAKES (2- BY 4-INCH RECTANGULAR OR 2

2-INCH

MINIMUM DIAMETER) OR METAL STAKES (1

3 POUNDS PER

LINEAR FOOT). FOR TYPE 2 AND 3 TURBIDITY CURTAINS,

INSTALL ANCHORS THAT ARE EITHER WEIGHTED OR THAT DIG

INTO THE CHANNEL BOTTOM.

6. EXTEND THE ENDS OF THE TURBIDITY CURTAINS WELL UP INTO

THE SHORELINE ESPECIALLY IF HIGH WATER CONDITIONS ARE

EXPECTED AS APPROVED BY THE CO. SECURE THE ENDS

FIRMLY TO THE SHORELINE (PREFERABLY TO RIGID BODIES

SUCH AS TREES OR PILES) TO FULLY ENCLOSE THE AREA WHERE

SEDIMENT MAY ENTER INTO THE WATER BODY.

7. FURNISH MINIMUM

2 INCH NYLON ROPE FOR ADJUSTMENT

LINE FOR MOORING SYSTEM. ENSURE THE MOORING LINE IS

SECURELY ATTACHED AND IS SUFFICIENTLY BUOYANT TO REMAIN

AFLOAT UNDER NORMAL LOAD CONDITIONS.

8. FOR TYPE 1 AND 2 TURBIDITY CURTAINS, EXTEND THE NYLON

REINFORCED VINYL FABRIC THROUGH THE ENTIRE DEPTH OF THE

WATER (TO THE CHANNEL BOTTOM) UNLESS TIDAL ACTIONS ARE

PRESENT.

9. IN AREAS SUBJECT TO WIND AND WAVE ACTIONS OR WHERE

TIDAL ACTIONS ARE PRESENT, USE TYPE 3 TURBIDITY CURTAINS

AS DIRECTED BY THE CO. FURNISH AND INSTALL TYPE 3

TURBIDITY CURTAINS ACCORDING TO THE MANUFACTURER'S

RECOMMENDATIONS AND AS APPROVED BY THE CO.

10. REMOVE CAPTURED SEDIMENT BEHIND THE CURTAIN PRIOR

TO REMOVING THE FLOATING TURBIDITY CURTAINS. DO NOT

DISPERSE SEDIMENT INTO ADJACENT BODY OF WATER.

Wind and Wave Actions Tidal Action or Subject to

A1

FLOATING TURBIDITY CURTAIN

NTS

NOTES:

LAND ANCHORING

SEE NOTE 6

EXISTING SHORELINE (TYP.)

STAKE (TYP.)

SEE NOTE 4

TURBIDITY CURTAIN

SECTION (TYP.)

ANCHOR (TYP.)

SEE NOTES 4 AND 5

SUPPORTING FLOTATION

(12-INCH EQUIVALENT)

CONSTRUCTION AREA

TURBID WATER

CLEAR WATER

MOORING LINE WITH SUPPORTING

FLOTATION (TYP.)

SEE NOTE 7

NYLON REINFORCED VINYL5/8-INCH POLYPROPYLENE

ROPE AND GROMMITS

CONNECTION

SUPPORTING FLOTATION

(6-INCH EQUIVALENT)

WATER SURFACE ELEVATION (WSL)

5/16-INCH BALLAST CHAIN

(GALVANIZED) (TYP.)

5/16-INCH DUAL GALVANIZED WIRE ROPE

LOAD LINES WITH HEAVY VINYL COATING

SLOTTED CONNECTOR PIPE OR

POLYPROPYLENE ROPE AND

GROMMET CONNECTION

SUPPORTING FLOTATION

(8-INCH EQUIVALENT)

WATER SURFACE ELEVATION (WSL)

NYLON REINFORCED VINYL

5/16-INCH BALLAST CHAIN

(GALVANIZED) (TYP.)

2 EACH 5/16-INCH VINYL SHEATHER EAW STEEL CABLES

(18,400 LBS. BREAKING STRENGTH) WITH GALVANIZED

CONNECTORS (TOOL FREE DISCONNECT)

SLOTTED PVC CONNECTOR PIPE

(METAL COLLAR REINFORCED)

WATER SURFACE ELEVATION (WSL)

D E

P T

H

NYLON REINFORCED VINYL

3/8-INCH BALLAST CHAIN

(GALVANIZED) (TYP.)

CHANNEL BOTTOM

D E

P T

H

S E

E N

O T

E

(M

A X

M

IN

D E

P T

H

S E

E N

O T

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

GC502

E

IL

B A

K E

R

N

F

IS

C H

E R

C

C A

R T

E R

A N

S

O

S

IO

N C

O N

T R

O L

D E

T A

IL

S

W

2Q R

BA

5_

Pl an s-

CD102

CD103

U U

U

U

U

U

12"

X

X

X

X

X

N

E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

12"

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

FO

R K

V E R

M

ILLIO

N R

IV

E R

F L O

W

FLOW

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

ALLOWED BETWEEN OCTOBER 15 AND MARCH 31.

CONSTRUCTION YET NOT CREATE FURTHER EROSION. TREE CLEARING IS

6. TREE CLEARING SHOULD BE PERFORMED IN SUCH A FASHION TO FACILITATE

EXCESS MATERIAL SHALL BE DISPOSED ACCORDING TO SPEC 02 41 00.

EXISTING RIP RAP CAN BE REUSED FOR STONE AT THE TOE BANK. ANY 5.

INSTALLED BY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .