W912QR25BA005_Plans-0001.pdf

PDF 9 MB Posted

Attached to
EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL
Solicitation number
W912QR25BA005
Issued by

About this file

This file contains construction plans and drawings for an emergency streambank stabilization project along the Middle Fork Vermilion River in Vermilion County, Illinois for the U.S. Army Corps of Engineers Louisville District. The plans include detailed erosion prevention and sediment control measures, demolition plans, site plans, and grading plans.

The project involves installing riprap bank protection with seeding and planting along the riverbank, constructing a temporary construction access road with culvert, implementing erosion control measures including turbidity barriers and fiber rolls, and following a specific construction sequence. Key technical details include installation of stone check dams, temporary construction culverts, permanent fiber rolls, and topsoil/seeding requirements over disturbed areas. The plans specify that no in-water work will be allowed between May 1 and July 31, and that the riprap at the toe shall be constructed with minimum 48" riprap reclaimed from the slope plus additional minimum 40" thick revetment stone. The plans also indicate that full closures of County Road 21 will be required to complete construction. The drawings provide detailed grading plans with 1-foot contour intervals and specific coordinates for key construction points.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E 2600 N

RD HMA

N

E R

D H

M A

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

F

LO

WF

L O

W

U U

U

U

U

U

GC103

GC104

GC102

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

NOT USED.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

I.

W

E

IL

B A

K E

R

N

F

IS

C H

E R

C

C A

R T

E R

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

OVER ALL DISTURBED AREAS

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

DIRECTION OF FLOW

PERMANENT FIBER ROLL

TEMPORARY TURBIDITY BARRIER

STONE CHECK DAM TO REMAIN AFTER PROJECT COMPLETION

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L

F

E B

M

E N

D M

E N

T

GC101

S I

D

O

V E

R A

L L

E R

O S

IO

N

P R

E V

E N

T

IO

N

A1

AND SEDIMENT CONTROL PLAN OVERALL EROSION PREVENTION

1"=200'SCALE: 400'0 200'

W

2Q R

BA

5_

Pl an s-

E 2 N

RD H

MA

M

ID

D

LE

FO

R K V

E R

M

ILLIO

N R

IV

E R

WOODS

F

LO

W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

NOT USED.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM TO REMAIN AFTER PROJECT COMPLETION.7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

OVER ALL DISTURBED AREAS

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

F

GC102

S

E

R O

S

IO

N P

R E

V E

N T

IO

N

A1

1 OF 3 AND SEDIMENT CONTROL PLAN EROSION PREVENTION

1"=40'SCALE: 40' 80'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

WOODS

WOODS

U U

U

MATCH LINE SEE SHEET GC103

MATCH LINE SEE SHEET GC102

N

E R

D H

M A

TIMBER

V E R

M

ILLIO

N R

IV

E R

M

ID

D

LE

FO

R K

FLOW

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

NOT USED.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM TO REMAIN AFTER PROJECT COMPLETION.7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

OVER ALL DISTURBED AREAS

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

GC103

S

O

S

IO

N P

R E

V E

N T

IO

N

A1

2 OF 3 AND SEDIMENT CONTROL PLAN EROSION CONTROL PLAN

1"=20'SCALE: 20' 40'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

U

12"

MATCH LINE SEE SHEET GC103

MATCH LINE SEE SHEET GC102

N E R

D H

M A

TIMBER

12"

VERMI

LL

IO

N

RI

VER

MI

DDLE

FORK

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

2. NO CHANGE IN IMPERVIOUS SURFACE.

1. LIMIT OF DISTURBANCE > 1-ACRE.

SITE DATA:

STABILIZED.

12. REMOVE ALL REMAINING TEMPORARY CONTROLS AFTER SITE IS

11. RESTORE AND STABILIZE ANY REMAINING DISTURBED AREAS.

10. REMOVE TEMPORARY CONSTRUCTION ENTRANCE AND CULVERT.

9. INSTALL RIPRAP LINING, EROSION CONTROL BLANKETS, FIBER ROLLS.

8. FINE GRADE. TOPSOIL, SEED.

7. VEGETATE RIPRAP MASS.

6. PLACE GRANULAR FILL AND RIPRAP.

5. BANK EXCAVATION AND GRADING.

4. STRIP TOPSOIL AND STOCKPILE IF NECESSARY.

3. INSTALL TEMPORARY TURBIDITY BARRIER.

2. INSTALL PERIMETER CONTROLS.

1. INSTALL TEMPORARY CULVERT AND CONSTRUCTION ACCESS.

SEQUENCE OF CONSTRUCTION:

NOT USED.15.

SEE SHEETS GC501 AND GC502 FOR DETAILS.14.

STANDARD INDUSTRY PRACTICE, AS APPROPRIATE.

ACCORDING TO IDEM GUIDELINES, MANUFACTURER'S REQUIREMENTS, OR

ALL BMPS WILL BE SELECTED, INSTALLED, OPERATED, AND MAINTAINED 13.

RUNOFF FROM THE SITE IS FREE OF CONTAMINANTS.

CLEANUP, AND WASTE MANAGEMENT MUST BE FOLLOWED TO ENSURE THAT

HANDLING, VEHICLE FUELING AND MAINTENANCE, SPILL RESPONSE AND

GOOD HOUSEKEEPING MEASURES FOR MATIERALS STORAGE AND 12.

UPGRADIENT AREAS IS ESTABLISHED AND DITCHES ARE STABLE.

OTHER TEMPORARY CONTROLS MUST BE REMOVED AFTER VEGETATION IN

SILT FENCES, DITCH CHECKS, NON-PERMANENT SEDIMENT TRAPS, AND 11.

OILS, TRASH AND LITTER, OR OTHER MATERIALS.

CONTAMINATED RUNOFF OR OTHER IMPACTS FROM WASTES, FUELS, AND

GOOD HOUSEKEEPING PRACTICES MUST BE APPLIED TO PREVENT 10.

VEHICLES, EQUIPMENT, AND SOIL DISTURBANCE ACTIVITIES.

LAKES, WETLANDS, AND SINKHOLES MUST BE FLAGGED AS OFF-LIMITS TO

WHERE PRACTICAL, ALL AREAS WITHIN 25 TO 50 FEET OF STREAMS, RIVERS, 9.

PERMANENT SEEDING OR MULCHING WITHIN 14 DAYS.

GRADING, OR FILL ACTIVITIES MUST BE STABILIZED WITH TEMPORARY OR

ALL BARE SOIL AREAS NOT SUBJECT TO ACTIVE CLEARING EXCAVATION 8.

PERMIT.

COVERED UNDER AN ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

DISCHARGES TO STORM DRAINS, DITCHES, OR WATER BODIES MUST BE 7.

OR FILTERING DEVICE AND CLEANED BEFORE BEING DISCHARGED.

OTHER EXCAVATION ACTIVITIES MUST BE PUMPED TO A SEDIMENT TRAPPING

SEDIMENT-LADEN WATER ENCOUNTERED DURING TRENCHING, BORING, OR 6.

SECTION 404 PERMIT AND ILLINOIS 401.

CROSSING STRUCTURES AUTHORIZED UNDER A USACE CLEAN WATER ACT

ALL STREAM CROSSINGS MUST USE PROPERLY DESIGNED LOW WATER 5.

MULCHED, AND ADEQUEATELY CONTAINED USING SILT FENCE.

PONDS, SWALES, AND CATCH BASINS. STOCKPILES MUST BE SEEDED,

IF POSSIBLE, SOIL STOCKPILES MUST BE LOCATED AWAY FROM STREAMS, 4.

AND ROCK TRACKED ONTO THE ROADWAY MUST BE REMOVED DAILY.

AND ROCK FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL

INSTALL CONSTRUCTION EXIT TO MINIMIZE THE TRACKING OF MUD, SOIL, 3.

LEAVING THE SITE.

HEAVILY EROSDED AREAS AS NEEDED TO PREVENT SEDIMENT FROM

APPROVED CONTROLS MUST BE INSTALLED AS NEEDED, DOWNGRADIENT OF

TEMPORARY SEDIMENT TRAPS WITH ROCK OR EARTHEN DIKES OR OTHER 2.

EXCAVATION, OR PLACEMENT OF FILL MATERIAL.

AND SILT FENCES MUST BE INSTALLED BEFORE LAND CLEARING,

ACTIVITIES. SEDIMENT CONTROLS SUCH AS ROCK SITE EXIT PADS, TRAPS,

MUST BE DEVELOPED AND IMPLEMENTED BEFORE ANY LAND DISTURBING

THE SWPPP AND/OR EROSION PREVENTION AND SEDIMENT CONTROL PLAN 1.

GENERAL SHEET NOTES

N

F

IS

C H

E R

SHEET KEYNOTES

CONSTRUCTION ENTRANCE

INSTALL TEMPORARY 15" DIAMETER CULVERT PIPE UNDER TEMPORARY 8.

STONE CHECK DAM TO REMAIN AFTER PROJECT COMPLETION.7.

PLANTING PLAN AND SPECIFICATION SECTION 35 42 37.00 06.

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND PLANTING PER 6.

TEMPORARY TURBIDITY BARRIER.5.

DISTURBED AREAS NOT TO RECEIVE RIPRAP SURFACING.

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS OVER ALL 4.

INSTALL PERMANENT FIBER ROLL AFTER SLOPE GRADING.3.

PERMANENT PERIMETER FIBER ROLL2.

WITH COR.

TEMPORARY CONSTRUCTION ACCESS. COORDINATE ACTUAL LOCATION 1.

LEGEND

CONTRACTOR WORK LIMITS

TEMPORARY CONSTRUCTION CULVERT

SECTION 35 42 37.00 06

PLANTING PER PLANTING PLAN AND SPECIFICATION

RIPRAP BANK PROTECTION TO RECIEVE SEEDING AND

OVER ALL DISTURBED AREAS

TOPSOIL, SEED, AND INSTALL EROSION CONTROL BLANKETS

TEMPORARY CONSTRUCTION ACCESS

I.

W

E

IL

B A

K E

R

C

C A

R T

E R

DIRECTION OF FLOW

PERMANENT FIBER ROLL

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

O

GC104

S

O

S

IO

N P

R E

V E

N T

IO

N

A1

3 OF 3 AND SEDIMENT CONTROL PLAN EROSION CONTROL PLAN

1"=20'SCALE: 40' 80'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

CD102

CD103

U U

U

U

U

U

12"

X

X

X

X

X

N

E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

12"

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

FO

R K

V E R

M

ILLIO

N R

IV

E R

F L O

W

FLOW

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

CONSTRUCTION YET NOT CREATE FURTHER EROSION.

6. TREE CLEARING SHOULD BE PERFORMED IN SUCH A FASHION TO FACILITATE

EXCESS MATERIAL SHALL BE DISPOSED ACCORDING TO SPEC 02 41 00.

EXISTING RIP RAP CAN BE REUSED FOR STONE AT THE TOE BANK. ANY 5.

AFTER WORK IS COMPLETE.

GUARDRAIL OFFSITE. NEW GUARDRAIL WILL BE INSTALLED BY OTHERS

EXISTING GUARDRAIL WILL NOT BE REUSED. REMOVE THE EXISTING 4.

REMOVED DURING CONSTRUCTION.

EXISTING GUARDRAIL ON WEST SIDE OF COUNTY ROAD 21 SHALL BE 3.

ALL ITEMS NOT MARKED FOR REMOVAL MUST BE PROTECTED.2.

TO VERIFY ALL EXISTING UTILITIES.

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR MUST BE RESPONSIBLE 1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

CONTRACTOR WORK LIMITS

REMOVAL OF LINEAR ITEM

REMOVAL OF EXISTING CONCRETE

TREE CLEARING

N

F

IS

C H

E R

B G

R E

G O

R Y

REMOVAL OF ITEMX

F

E B

E N

D M

E N

T

CD101

S

E

R A

L L

D E

M O

L

IT

IO

N

P L

A N

A1

OVERALL DEMOLITION PLAN

1"=40'SCALE: 40' 80'0

W

2Q R

BA

5_

Pl an s-

U

X

X

X

MATCH LINE SEE SHEET CD103

MATCH LINE SEE SHEET CD102

N 1,300,575.54

E 1,140,728.83

N 1,300,553.22

E 1,140,743.45

N 1,300,566.13

E 1,140,729.15

N 1,300,519.89

E 1,140,736.57

N 1,300,482.17

E 1,140,746.87

N 1,300,437.41

E 1,140,763.79

N 1,300,478.60

E 1,140,722.79

N 1,300,526.10

E 1,140,705.79

N 1,300,539.31

E 1,140,697.85

N 1,300,551.04

E 1,140,716.84

N 1,300,557.94

E 1,140,697.40

N 1,300,509.82

E 1,140,729.13

N 1,300,483.54

E 1,140,737.87

N 1,300,586.90

E 1,140,693.56

N 1,300,676.92

E 1,140,680.33

N 1,300,690.65

E 1,140,682.76

N 1,300,649.97

E 1,140,612.26

N 1,300,645.05

E 1,140,606.59

N 1,300,637.09

E 1,140,620.10

N 1,300,626.70

E 1,140,635.83

N 1,300,606.75

E 1,140,653.77

N 1,300,583.80

E 1,140,673.74

N 1,300,611.98

E 1,140,681.05

N

E R

D H

M A

TIMBER

V E R

M

ILLIO

N R

IV

E R

M

ID

D

LE

FO

R K

FLOW

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

CONSTRUCTION YET NOT CREATE FURTHER EROSION.

6. TREE CLEARING SHOULD BE PERFORMED IN SUCH A FASHION TO FACILITATE

EXCESS MATERIAL SHALL BE DISPOSED ACCORDING TO SPEC 02 41 00.

EXISTING RIP RAP CAN BE REUSED FOR STONE AT THE TOE BANK. ANY 5.

AFTER WORK IS COMPLETE.

GUARDRAIL OFFSITE. NEW GUARDRAIL WILL BE INSTALLED BY OTHERS

EXISTING GUARDRAIL WILL NOT BE REUSED. REMOVE THE EXISTING 4.

REMOVED DURING CONSTRUCTION.

EXISTING GUARDRAIL ON WEST SIDE OF COUNTY ROAD 21 SHALL BE 3.

ALL ITEMS NOT MARKED FOR REMOVAL MUST BE PROTECTED.2.

TO VERIFY ALL EXISTING UTILITIES.

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR MUST BE RESPONSIBLE 1.

GENERAL SHEET NOTES

T F

R O

S T

SHEET KEYNOTES

EXISTING ONE-WAY TRAFFIC CONTROL SYSTEM TO BE REMOVED BY OTHERS7.

SAW CUT PAVEMENT ALONG REMOVAL EDGE6.

REMOVE W1-8 CHEVRON SIGNS5.

BARRICADE AND TRAFFIC CONTROL BARRELS TO BE REMOVED BY OTHERS4.

PROPOSED EXISTING GUARDRAIL REMOVAL3.

PROPOSED AREA FOR EXISTING PAVEMENT2.

PROPOSED AREA FOR TREE CLEARING1.

LEGEND

CONTRACTOR WORK LIMITS

REMOVAL OF LINEAR ITEM

REMOVAL OF EXISTING CONCRETE

TREE CLEARING

B G

R E

G O

R Y

N

F

IS

C H

E

CD102

S

M

O L

IT

IO

N P

L A

N

A1

DEMOLITION PLAN 1 OF 2

1"=20'SCALE: 20' 40'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

12"

X

X

MATCH LINE SEE SHEET CD103

MATCH LINE SEE SHEET CD102

N 1,300,356.34

E 1,140,779.97

N 1,300,349.83

E 1,140,753.13

N 1,300,292.39

E 1,140,781.95

N 1,300,240.49

E 1,140,787.08

N 1,300,252.15

E 1,140,834.56

N 1,300,326.13

E 1,140,787.43

N 1,300,367.64

E 1,140,806.56

N 1,300,358.28

E 1,140,806.62

N 1,300,392.14

E 1,140,786.78

N 1,300,437.41

E 1,140,763.79

N 1,300,400.34

E 1,140,762.66

N E R

D H

M A

TIMBER

12"

VERMI

LL

IO

N

RI

VER

MI

DDLE

FORK

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

CONSTRUCTION YET NOT CREATE FURTHER EROSION.

6. TREE CLEARING SHOULD BE PERFORMED IN SUCH A FASHION TO FACILITATE

EXCESS MATERIAL SHALL BE DISPOSED ACCORDING TO SPEC 02 41 00.

EXISTING RIP RAP CAN BE REUSED FOR STONE AT THE TOE BANK. ANY 5.

AFTER WORK IS COMPLETE.

GUARDRAIL OFFSITE. NEW GUARDRAIL WILL BE INSTALLED BY OTHERS

EXISTING GUARDRAIL WILL NOT BE REUSED. REMOVE THE EXISTING 4.

REMOVED DURING CONSTRUCTION.

EXISTING GUARDRAIL ON WEST SIDE OF COUNTY ROAD 21 SHALL BE 3.

ALL ITEMS NOT MARKED FOR REMOVAL MUST BE PROTECTED.2.

TO VERIFY ALL EXISTING UTILITIES.

PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR MUST BE RESPONSIBLE 1.

GENERAL SHEET NOTES

T F

R O

S T

SHEET KEYNOTES

EXISTING ONE-WAY TRAFFIC CONTROL SYSTEM TO BE REMOVED BY OTHERS7.

SAW CUT PAVEMENT ALONG REMOVAL EDGE6.

REMOVE W1-8 CHEVRON SIGNS5.

BARRICADE AND TRAFFIC CONTROL BARRELS TO BE REMOVED BY OTHERS4.

PROPOSED EXISTING GUARDRAIL REMOVAL3.

PROPOSED AREA FOR EXISTING PAVEMENT2.

PROPOSED AREA FOR TREE CLEARING1.

LEGEND

CONTRACTOR WORK LIMITS

REMOVAL OF LINEAR ITEM

REMOVAL OF EXISTING CONCRETE

TREE CLEARING

B G

R E

G O

R Y

N

F

IS

C H

E

CD103

S

M

O L

IT

IO

N P

L A

N

A1

DEMOLITION PLAN 2 OF 2

1"=20'SCALE: 20' 40'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

U

U

U

U

12"

CS102

CS103

10+00

11+00

0+0

1+0

2+0

3+

4+

N

E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

12"

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

FO

R K

V E R

M

ILLIO

N R

IV

E R

F L O

W

FLOW

E X

IS

T

IN

G B

R

ID

G E

F L

O W

RIPRAP DITCH CENTERLINE

RIPRAP SLOPE CENTERLINE

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED.8.

NO IN-WATER WORK WILL BE ALLOWED BETWEEN MAY 1 AND JULY 31.7.

ROAD RECONSTRUCTION TO BE COMPLETED BY OTHERS.6.

VEGETATED STONE PROTECTION.

ADDITIONAL MINIMUM 40" THICK OF REVETMENT. SEE SPEC 35 42 37.00 06

OFFSITE. LOWER BANK IS MINIMUM 8" THICK OF BEDDING STONE WITH AN

FROM THE SLOPE. ADDITIONAL REVETMENT STONE TO BE PROCURED FROM

RIP RAP AT TOE SHALL BE CONSTRUCTED WITH MIN 48" RIP RAP RECLAIMED 5.

BANK AT BEGINNING AND END OF PROJECT.

TAPER TOE AND NEW RIP RAP AT A 30 DEGREE ANGLE TO MATCH EXISTING 4.

CONSTRUCTION.

FULL CLOSURES OF COUNTY ROAD 21 WILL BE REQUIRED TO COMPLETE 3.

SEE SHEET CS201 FOR RIPRAP PROFILE.2.

SHEET CS202 FOR DITCH PROFILE

SEE SHEET CS501, DETAIL A1 FOR TYPICAL RIPRAP CROSS SECTION AND SEE 1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

CONTRACTOR WORK LIMITS

PROPOSED TIE-IN RIPRAP

N

F

IS

C H

E R

B G

R E

G O

R Y

PROPOSED RIPRAP

PROPOSED RIPRAP DITCH

CS101

S

E

R A

L L

S

IT

E P

L A

N

A1

OVERALL SITE PLAN

1"=40'SCALE: 40' 80'0

A M

E N

D M

E N

T

F

E B

W

2Q R

BA

5_

Pl an s-

U

MATCH LINE SEE SHEET CS103

MATCH LINE SEE SHEET CS102

10+00

11+00

POBSTA 10+00.00N 1,300,565.64E 1,140,675.80

POESTA 11+26.12N 1,300,687.78E 1,140,707.22

2+0

3+

4+

PI STA = 2+61.38

N 1,300,488.09

E 1,140,743.32

R = 400.00'

D = 14°19'26.20"

Δ = 27°14'51.48" L = 190.22' T = 96.95' E = 11.58'

PI

STA

2+61

.38

PO

E

ST

A 4+

.5

N 1, 0, 0.

E 1, 0, 2.

PT

ST

A 3+

.6

N

E R

D H

M A

TIMBER

VERM

ILLIO

N RIVER

M

IDDLE FO

RK

FLOW

RIPRAP DITCH CENTERLINE

CENTERLINE

RIPRAP SLOPE

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED.8.

NO IN-WATER WORK WILL BE ALLOWED BETWEEN MAY 1 AND JULY 31.7.

ROAD RECONSTRUCTION TO BE COMPLETED BY OTHERS.6.

VEGETATED STONE PROTECTION.

ADDITIONAL MINIMUM 40" THICK OF REVETMENT. SEE SPEC 35 42 37.00 06

OFFSITE. LOWER BANK IS MINIMUM 8" THICK OF BEDDING STONE WITH AN

FROM THE SLOPE. ADDITIONAL REVETMENT STONE TO BE PROCURED FROM

RIP RAP AT TOE SHALL BE CONSTRUCTED WITH MIN 48" RIP RAP RECLAIMED 5.

BANK AT BEGINNING AND END OF PROJECT.

TAPER TOE AND NEW RIP RAP AT A 30 DEGREE ANGLE TO MATCH EXISTING 4.

CONSTRUCTION.

FULL CLOSURES OF COUNTY ROAD 21 WILL BE REQUIRED TO COMPLETE 3.

SEE SHEET CS201 FOR RIPRAP PROFILE.2.

SHEET CS202 FOR DITCH PROFILE

SEE SHEET CS501, DETAIL A1 FOR TYPICAL RIPRAP CROSS SECTION AND SEE 1.

GENERAL SHEET NOTES

T F

R O

S T

SHEET KEYNOTES

PROPOSED GRADING LIMITS4.

DETAIL J11.

PROPOSED RIPRAP DITCH. SEE RIPRAP TIE-IN DETAIL ON SHEET CS501, 3.

PROPOSED RIPRAP TOE2.

DETAIL J1.

PROPOSED RIPRAP TIE-IN. SEE RIPRAP TIE-IN DETAIL ON SHEET CS501, 1.

LEGEND

N

F

IS

C H

E R

B

G R

E G

O R

Y

CONTRACTOR WORK LIMITS

PROPOSED TIE-IN RIPRAP

CS102

S

P

O

P O

S E

D S

IT

E

P L

A N

A1

PROPOSED SITE PLAN 1 OF 2

1"=20'SCALE: 20' 40'0

A M

E N

D M

E N

T

F

E B

W

2Q R

BA

5_

Pl an s-

12"

MATCH LINE SEE SHEET CS103

MATCH LINE SEE SHEET CS102

0+0

1+0

2+0

POB

STA 0

+00 .00

N 1, 300, 234.

E 1, 140, 805.

PC

STA 1

+64 .43

N E R

D H

M A

TIMBER

12"

VERMI

LL

IO

N

RI

VER

MI

DDLE

FORK

E X

IS

T

IN

G B

R

ID

G E

F L

O W

RIPRAP SLOPE CENTERLINE

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED.8.

NO IN-WATER WORK WILL BE ALLOWED BETWEEN MAY 1 AND JULY 31.7.

ROAD RECONSTRUCTION TO BE COMPLETED BY OTHERS.6.

VEGETATED STONE PROTECTION.

ADDITIONAL MINIMUM 40" THICK OF REVETMENT. SEE SPEC 35 42 37.00 06

OFFSITE. LOWER BANK IS MINIMUM 8" THICK OF BEDDING STONE WITH AN

FROM THE SLOPE. ADDITIONAL REVETMENT STONE TO BE PROCURED FROM

RIP RAP AT TOE SHALL BE CONSTRUCTED WITH MIN 48" RIP RAP RECLAIMED 5.

BANK AT BEGINNING AND END OF PROJECT.

TAPER TOE AND NEW RIP RAP AT A 30 DEGREE ANGLE TO MATCH EXISTING 4.

CONSTRUCTION.

FULL CLOSURES OF COUNTY ROAD 21 WILL BE REQUIRED TO COMPLETE 3.

SEE SHEET CS201 FOR RIPRAP PROFILE.2.

SHEET CS202 FOR DITCH PROFILE

SEE SHEET CS501, DETAIL A1 FOR TYPICAL RIPRAP CROSS SECTION AND SEE 1.

GENERAL SHEET NOTES

T F

R O

S T

SHEET KEYNOTES

PROPOSED GRADING LIMITS4.

DETAIL J11.

PROPOSED RIPRAP DITCH. SEE RIPRAP TIE-IN DETAIL ON SHEET CS501, 3.

PROPOSED RIPRAP TOE2.

DETAIL J1.

PROPOSED RIPRAP TIE-IN. SEE RIPRAP TIE-IN DETAIL ON SHEET CS501, 1.

LEGEND

N

F

IS

C H

E R

B G

R E

G O

R Y

CONTRACTOR WORK LIMITS

PROPOSED TIE-IN RIPRAP

F

E B

E N

D M

E N

T

CS103

S

O

P O

S E

D S

IT

E

P L

A N

A1

PROPOSED SITE PLAN 2 OF 2

1"=20'SCALE: 20' 40'0

W

2Q R

BA

5_

Pl an s-

U

U

U

U

12"

CG102

CG103

N

E R

D H

M A

N E R

D H

M A

TIMBER

TIMBER

12"

MI

DDLE

FORK

VERMI

LL

IO

N

RI

VER

M

ID

D

LE

FO

R K

V E R

M

ILLIO

N R

IV

E R

F L O

W

FLOW

E X

IS

T

IN

G B

R

ID

G E

F L

O W

10+00

11+00

0+0

1+0

2+0

3+

4+

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED4.

FOR VEGETATIVE RIPRAP, SEE SPECIFICATION SECTION 35 42 37.00 06.3.

FOR TOPSOIL, SEE SPECIFICATION SECTION 32 92 19.2.

CONTOUR INTERVAL IS 1.0 FT1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

N

F

IS

C H

E R

B G

R E

G O

R Y

CONTRACTOR WORK LIMITS

DITCH CENTERLINE

PROPOSED BREAKLINE

F

E B

E N

D M

E N

T

CG101

S

E

R A

L L

G R

A D

IN

G

P L

A N

A1

OVERALL GRADING PLAN

1"=40'SCALE: 40' 80'0

W

2Q R

BA

5_

Pl an s-

U

MATCH LINE SEE SHEET CG103

MATCH LINE SEE SHEET CG102

.9

639.25

636.97

10+00

11+00

POBSTA 10+00.00N 1,300,565.64E 1,140,675.80

POESTA 11+26.12N 1,300,687.78E 1,140,707.22

2+0

3+

4+

PI STA = 2+61.38

N 1,300,488.09

E 1,140,743.32

R = 400.00'

D = 14°19'26.20"

Δ = 27°14'51.48" L = 190.22' T = 96.95' E = 11.58'

PI

STA

2+61

.38

PO

E

ST

A 4+

.5

N 1, 0, 0.

E 1, 0, 2.

PT

ST

A 3+

.6

N

E R

D H

M A

TIMBER

VERM

ILLIO

N RIVER

M

IDDLE FO

RK

FLOW

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED4.

FOR VEGETATIVE RIPRAP, SEE SPECIFICATION SECTION 35 42 37.00 06.3.

FOR TOPSOIL, SEE SPECIFICATION SECTION 32 92 19.2.

CONTOUR INTERVAL IS 1.0 FT1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

CONTRACTOR WORK LIMITS

B

G R

E G

O R

Y

N

F

IS

C H

E R

DISTURB LIMITS

DITCH CENTERLINE

PROPOSED BREAKLINE

SHEET KEYNOTES

TYPICAL SECTION.

PROPOSED RIPRAP DITCH. SEE CS202 FOR PROFILE AND J11/CS501 FOR 1.

CG102

S

O

P O

S E

D G

R A

D

IN

G P

L A

N

A1

PROPOSED GRADING PLAN 1 OF 2

1"=20'SCALE: 20' 40'0

F

E B

A M

E N

D M

E N

T

W

2Q R

BA

5_

Pl an s-

12"

MATCH LINE SEE SHEET CG103

MATCH LINE SEE SHEET CG102

615.53

0+0

1+0

2+0

POB

STA 0

+00 .00

N 1, 300, 234.

E 1, 140, 805.

PC

STA 1

+64 .43

N E R

D H

M A

TIMBER

12"

VERMI

LL

IO

N

RI

VER

MI

DDLE

FORK

E X

IS

T

IN

G B

R

ID

G E

F L

O W

NORTH

PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

V E

R M

IL

IO

N C

O U

N T

Y

IL

L

IN

O

IS

C A

P S

E C

T

IO

N

E M

E R

G E

N C

Y S

T R

E A

M B

A N

K S

T A

B

IL

IZ

A

T

IO

N

V E

R M

IL

IO

N C

O U

N T

Y

IL

P

F

Y

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

N O

V E

M B

E R

N

F

IS

C H

E R

NOT USED4.

FOR VEGETATIVE RIPRAP, SEE SPECIFICATION SECTION 35 42 37.00 06.3.

FOR TOPSOIL, SEE SPECIFICATION SECTION 32 92 19.2.

CONTOUR INTERVAL IS 1.0 FT1.

GENERAL SHEET NOTES

T F

R O

S T

LEGEND

CONTRACTOR WORK LIMITS

B G

R E

G O

R Y

N

F

IS

C H

E R

DISTURB LIMITS

DITCH CENTERLINE

PROPOSED BREAKLINE

SHEET KEYNOTES

TYPICAL SECTION.

PROPOSED RIPRAP DITCH. SEE CS202 FOR PROFILE AND J11/CS501 FOR 1.

CG103

S

O

P O

S E

D G

R A

D

IN

G P

L A

N

A1

PROPOSED GRADING PLAN 2 OF 2

1"=20'SCALE: 20' 40'0

A M

E N

D M

E N

T

F E

B

W

2Q R

BA

5_

Pl an s-

GC101
GC102
GC103
GC104
CD101
CD102
CD103
CS101
CS102
CS103
CG101
CG102
CG103

File details come from the government source that posted it. Updated .