Electrical Distribution Study
Awarded Award Notice Posted
- Solicitation number
- FA5575-16-Q-0003
- Agency
- Air Forces Europe and Africa Air Force, Department of Defense
- Awarded
- to Cobra Instalaciones Y Servicios, S.a.u.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA557516P0017 Federal contract award
- NAICS code
- 221122 Electric Power Distribution
- PSC
- Not on record
- Place of performance
- Moron AB Moron AB, Spain
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Aug 29, 2016 10:26 am
Modified: Sep 09, 2016 5:28 amTrack Changes
Description of Requirement: The contractor shall provide all management, tools, supplies, equipment and labor needed to perform the non-severable service of electrical distribution fault protection coordination study. Calibrate all central Power Plant distribution feeder relays (four circuits), 50/60 frequency rotary converter and 50/60 frequency static converters units (6x750 KW) in relationship to coordination study results from Moron AB distribution system at Power Plant, building 212.
Important Dates To Remember:
Site Visit: A site visit will be held 2 September 2016 at 11:00 a.m
Questions: All questions regarding this requirement should be submitted no later than 6 September 2016 at 1:00 p.m.
Quotes Due: Quotes are due no later than 9 September 2016 @ 1000 Local (Spanish) Time.
Amendment 0001:
The quotes due has been extended from 9 September to 12 September at 1000 Local (Spanish) Time.
Update #1 ·
Added: Aug 29, 2016 10:26 am
Description of Requirement: The contractor shall provide all management, tools, supplies, equipment and labor needed to perform the non-severable service of electrical distribution fault protection coordination study. Calibrate all central Power Plant distribution feeder relays (four circuits), 50/60 frequency rotary converter and 50/60 frequency static converters units (6x750 KW) in relationship to coordination study results from Moron AB distribution system at Power Plant, building 212.
Important Dates To Remember:
Site Visit: A site visit will be held 2 September 2016 at 11:00 a.m
Questions: All questions regarding this requirement should be submitted no later than 6 September 2016 at 1:00 p.m.
Bids Due: Quotes are due no later than9 September 2016 @ 1000 Local (Spanish) Time.
Attachments
| File | Type | Posted |
|---|---|---|
| Power_Plant_Single_Diagram.pdf | ||
| SOO_Coordination_Study_(Spanish).doc | DOC document | |
| Combined_Synopsis_Solicitation.docx | DOCX document | |
| Cost_Estimate_Breakdown.pdf | ||
| SOO_Coordination_Study.doc | DOC document |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity