Electrical Distribution Study

Awarded Award Notice Posted

Solicitation number
FA5575-16-Q-0003
Agency
Air Forces Europe and Africa Air Force, Department of Defense
Awarded
to Cobra Instalaciones Y Servicios, S.a.u.
Set-aside
No set-aside

Opportunity facts

Contract number
FA557516P0017 Federal contract award
NAICS code
221122 Electric Power Distribution
PSC
Not on record
Place of performance
Moron AB Moron AB, Spain

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Aug 29, 2016 10:26 am Modified: Sep 09, 2016 5:28 amTrack Changes Description of Requirement:  The contractor shall provide all management, tools, supplies, equipment and labor needed to perform the non-severable service of electrical distribution fault protection coordination study. Calibrate all central Power Plant distribution feeder relays (four circuits), 50/60 frequency rotary converter and 50/60 frequency static converters units (6x750 KW) in relationship to coordination study results from Moron AB distribution system at Power Plant, building 212.

Important Dates To Remember:
Site Visit:  A site visit will be held 2 September 2016 at 11:00 a.m
Questions:  All questions regarding this requirement should be submitted no later than 6 September 2016 at 1:00 p.m.
Quotes Due:  Quotes are due no later than 9 September 2016 @ 1000 Local (Spanish) Time.


Amendment 0001:

The quotes due has been extended from 9 September to 12 September at 1000 Local (Spanish) Time.

Update #1 ·

Added: Aug 29, 2016 10:26 am Description of Requirement:  The contractor shall provide all management, tools, supplies, equipment and labor needed to perform the non-severable service of electrical distribution fault protection coordination study. Calibrate all central Power Plant distribution feeder relays (four circuits), 50/60 frequency rotary converter and 50/60 frequency static converters units (6x750 KW) in relationship to coordination study results from Moron AB distribution system at Power Plant, building 212.

Important Dates To Remember:
Site Visit:  A site visit will be held 2 September 2016 at 11:00 a.m
Questions:  All questions regarding this requirement should be submitted no later than 6 September 2016 at 1:00 p.m.
Bids Due:  Quotes are due no later than9 September 2016 @ 1000 Local (Spanish) Time.

Attachments

Files attached to this notice, newest first
File Type Posted
Power_Plant_Single_Diagram.pdf PDF
SOO_Coordination_Study_(Spanish).doc DOC document
Combined_Synopsis_Solicitation.docx DOCX document
Cost_Estimate_Breakdown.pdf PDF
SOO_Coordination_Study.doc DOC document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity