E- Design, fabricate, and deliver two prefabricated modular steel girder trail bridges.
Closed Solicitation Posted
- Solicitation number
- 1240BE23Q0122
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- Place of performance
- Baker City, Oregon 97814, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Contract Opportunity involves the design, fabrication, and delivery of two prefabricated modular steel girder trail bridges. One bridge will be 48 feet long and 7 feet wide, while the other will be 46 feet 9 inches long and 4 feet wide. The bridges are to be delivered to the US Forest Service, Wallowa-Whitman NF Compound in Baker City, Oregon by September 15th, 2023.
Products and Services to be provided:
- Design of two prefabricated modular steel girder trail bridges.
- Fabrication of the designed bridges.
- Delivery of the fabricated bridges to the specified location.
- Provision of design calculations and shop drawings for approval prior to fabrication.
- Provision of warranty for the bridges and all parts furnished for a period of one year from the date of acceptance.
Notice text
3 versions
Update #3 · Latest ·
AMENDMENT 003
Purpose for this amendment is to
1. Update Due Date to August 21st, 2023.
2. "Steel or timber proposals will be accepted by
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Period of Performance: 08/10/2023 to 06/01/
This project consists of designing, fabricating, and delivering two prefabricated modular steel girder trail bridges superstructure and additional components with features as described in the specifications and requirements sections, Please see attached Forest Service Supplemental Specifications.
(R6_STD_964-20_PREFABRICATED STEEL GIRDER TRAIL BRIDGE)
(Railing Details_1240BE23Q0122)
Update #2 ·
AMENDMENT 002
Purpose for this amendment is to
1. Update Due Date to August 17th 2023.
2.The current required delivery time of April 1st 2024 is revised to June 1st 2024 for delivery of both bridges. This revised date supersedes the date listed in the original RFQ.
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
This project consists of designing, fabricating, and delivering two prefabricated modular steel girder trail bridges superstructure and additional components with features as described in the specifications and requirements sections, Please see attached Forest Service Supplemental Specifications.
(R6_STD_964-20_PREFABRICATED STEEL GIRDER TRAIL BRIDGE)
(Railing Details_1240BE23Q0122)
Update #1 ·
This project consists of designing, fabricating, and delivering two prefabricated modular steel girder trail bridges superstructure and additional components with features as described in the specifications and requirements sections, Please see attached Forest Service Supplemental Specifications.
(R6_STD_964-20_PREFABRICATED STEEL GIRDER TRAIL BRIDGE)
(Railing Details_1240BE23Q0122)
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside | |
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity