Dworshak Unit 3 Winding Replacement

Awarded Award Notice Posted

Solicitation number
W912EF-15-R-0019
Agency
ENDIST Walla Walla US Army Corps of Engineers, Department of Defense
Awarded
to Andritz Hydro Corp
Set-aside
No set-aside

Opportunity facts

Contract number
W912EF-15-C-0031 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Dworshak Dam, 1428 North Fork Drive, Ahsahka, Idaho Ahsahka, Idaho 83520, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Apr 23, 2015 5:26 pm Modified: Apr 23, 2015 6:00 pmTrack Changes Amended to reflect site visit date is 02 June 2015.

Construction Project: Dworshak Unit 3 is a 266,316 kVA, 13,800 volt, 128.6 RPM Francis type hydro-generating unit built by Allis Chalmers circa 1970, located at Dworshak Dam, Ahsahka, Idaho, Clearwater County.

This contract will be to provide all labor, materials, incidentals, and equipment to, in general, disassemble Dworshak powerhouse generating unit 3, provide and install a new stator core and stator winding, and reassemble and commission the unit. This contract also includes a machine condition monitoring system as well as testing for model validation and compliance with WECC/NERC.


Specific items include, but are not limited to:
a. Perform all work required to comply with site operations, environmental protection, and safety and health provisions.
b. Perform pre-disassembly inspections and alignment measurements.
c. Disassemble generator unit.
d. Establish a centerline for the reassembled unit.
e. Clean and inspect disassembled components, including turbine and generator guide bearing.
f. Replace turbine and generator guide bearing RTDs.
g. Remove and dispose the existing surface air coolers and furnish, install, and test new surface air cooler assemblies, associated piping, and valves.
h. Perform refurbishment of rotor poles.
i. Design, manufacture, shop test, and deliver one complete set of stator bars, stator core laminations and all accessories needed for a complete winding assembly, ensuring circularity.
j. Remove and dispose of the existing stator core and install the new laminations.
k. Remove and dispose of the existing stator windings and install and test the new stator windings and accessories.
l. Remove and dispose of the existing fiberglass air shrouds and install new air shrouds for stator end turns.
m. Repair minor foundation crack repairs near sole plates.
n. Reassemble the generator unit and perform complete alignment of generator unit.
o. Perform post-assembly measurements, inspections, and tests as necessary. This includes model validation once the unit is returned to service.


Due to numerous constraints and environmental requirements for Dworshak powerhouse, generating unit 3 can only be out of service from 01 September 2016 to 01 May 2017. The Contractor shall have sufficient resources to complete the work within the stated duration.


Prior to beginning disassembly of Unit 3, the Contractor shall demonstrate that all necessary materials are on site, or scheduled to arrive in time such that work may begin and be completed within the allowable outage timeframe.



Location of the work is Dworshak Dam, Ahsahka, Idaho, Clearwater County, ID


The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. The resulting contract will be firm-fixed-price.


All solicitation documents for Request for Proposals No. W912EF-15-R-0019 will be posted to the FedBizOpps (FBO) website, https://www.fbo.gov. Posting will be made on or about 15 May 2015. Proposals will be due no sooner than 30 calendar days after the solicitation is issued. See the solicitation for details about the proposal due date.


The solicitation is open to both large and small business concerns. The small business size standard for NAICS Code 237990 is no more than $36,500,000 in average annual receipts.


A site visit will be offered 02 June 2015. See solicitation for details about the site visit date, time, and location. Only one site visit is expected to be offered.


Important Note Regarding Access for Foreign Nationals: It takes from 2-4 weeks to obtain clearance for foreign nationals to enter the project site. If your company wishes to have a foreign national participate in the site visit for this project, you are strongly encouraged to submit the required identification immediately. To request clearance for foreign nationals, submit the names and position titles of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph 9INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to Phyllis.L.Buerstatte@usace.army.mil. Foreign nationals must have received clearance prior to being granted access to the project site.


Important Note Regarding FBO Response Date: The FBO Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual due date for receipt of proposals. The proposal due date and time will be contained in the solicitation and any solicitation amendments that are issued.


No CDs or hard copies will be made available by the Government. Downloads are available only through the FBO website. Bidders are responsible for checking the FBO website frequently for any update(s) to the notice. The Government is not responsible for any loss of internet connectivity or for a bidder's inability to access the document posted on the referenced website. To obtain automatic notifications of updates to this solicitation, you must log in to www.fbo.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation.

Update #1 ·

Added: Apr 23, 2015 5:26 pm Construction Project: Dworshak Unit 3 is a 266,316 kVA, 13,800 volt, 128.6 RPM Francis type hydro-generating unit built by Allis Chalmers circa 1970, located at Dworshak Dam, Ahsahka, Idaho, Clearwater County.

This contract will be to provide all labor, materials, incidentals, and equipment to, in general, disassemble Dworshak powerhouse generating unit 3, provide and install a new stator core and stator winding, and reassemble and commission the unit. This contract also includes a machine condition monitoring system as well as testing for model validation and compliance with WECC/NERC.


Specific items include, but are not limited to:
a. Perform all work required to comply with site operations, environmental protection, and safety and health provisions.
b. Perform pre-disassembly inspections and alignment measurements.
c. Disassemble generator unit.
d. Establish a centerline for the reassembled unit.
e. Clean and inspect disassembled components, including turbine and generator guide bearing.
f. Replace turbine and generator guide bearing RTDs.
g. Remove and dispose the existing surface air coolers and furnish, install, and test new surface air cooler assemblies, associated piping, and valves.
h. Perform refurbishment of rotor poles.
i. Design, manufacture, shop test, and deliver one complete set of stator bars, stator core laminations and all accessories needed for a complete winding assembly, ensuring circularity.
j. Remove and dispose of the existing stator core and install the new laminations.
k. Remove and dispose of the existing stator windings and install and test the new stator windings and accessories.
l. Remove and dispose of the existing fiberglass air shrouds and install new air shrouds for stator end turns.
m. Repair minor foundation crack repairs near sole plates.
n. Reassemble the generator unit and perform complete alignment of generator unit.
o. Perform post-assembly measurements, inspections, and tests as necessary. This includes model validation once the unit is returned to service.


Due to numerous constraints and environmental requirements for Dworshak powerhouse, generating unit 3 can only be out of service from 01 September 2016 to 01 May 2017. The Contractor shall have sufficient resources to complete the work within the stated duration.


Prior to beginning disassembly of Unit 3, the Contractor shall demonstrate that all necessary materials are on site, or scheduled to arrive in time such that work may begin and be completed within the allowable outage timeframe.



Location of the work is Dworshak Dam, Ahsahka, Idaho, Clearwater County, ID


The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. The resulting contract will be firm-fixed-price.


All solicitation documents for Request for Proposals No. W912EF-15-R-0019 will be posted to the FedBizOpps (FBO) website, https://www.fbo.gov. Posting will be made on or about 15 May 2015. Proposals will be due no sooner than 30 calendar days after the solicitation is issued. See the solicitation for details about the proposal due date.


The solicitation is open to both large and small business concerns. The small business size standard for NAICS Code 237990 is no more than $36,500,000 in average annual receipts.


A site visit will be offered approximately 28 May 2015. See solicitation for details about the site visit date, time, and location. Only one site visit is expected to be offered.


Important Note Regarding Access for Foreign Nationals: It takes from 2-4 weeks to obtain clearance for foreign nationals to enter the project site. If your company wishes to have a foreign national participate in the site visit for this project, you are strongly encouraged to submit the required identification immediately. To request clearance for foreign nationals, submit the names and position titles of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph 9INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to Phyllis.L.Buerstatte@usace.army.mil. Foreign nationals must have received clearance prior to being granted access to the project site.


Important Note Regarding FBO Response Date: The FBO Response Date listed elsewhere in this synopsis is for FBO archive purposes only. It may have no relationship to the actual due date for receipt of proposals. The proposal due date and time will be contained in the solicitation and any solicitation amendments that are issued.


No CDs or hard copies will be made available by the Government. Downloads are available only through the FBO website. Bidders are responsible for checking the FBO website frequently for any update(s) to the notice. The Government is not responsible for any loss of internet connectivity or for a bidder's inability to access the document posted on the referenced website. To obtain automatic notifications of updates to this solicitation, you must log in to www.fbo.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation.

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_0003 _W912EF-15-R-0019.pdf PDF
FIOs_Part5.pdf PDF
FIOs_Part7.pdf PDF
FIOs_Part9.pdf PDF
FIOs_Part1.pdf PDF
FIOs_Part2.pdf PDF
Plans_Amend_0002.pdf PDF
FIOs_Part8.pdf PDF
FIOs_Part4.pdf PDF
FIOs_Part3.pdf PDF
Amendment_0002 _W912EF-15-R-0019 _Dworshak_Unit_3.pdf PDF
FIOs_Part6.pdf PDF
Site_Visit_List_of_Attendees _Dworshak_Unit_3 _15-R-0019.pdf PDF
Amendment_0001_W912EF-15-R-0019_(2).pdf PDF
PLANS_15-R-0019_fio3.pdf PDF
Site_Visit_Info _Dworshak_Unit_3.pdf PDF
PLANS_15-R-0019_fio1.pdf PDF
PLANS_15-R-0019_fio2.pdf PDF
PLANS_15-R-0019.pdf PDF
Solicitation_with_specs _W912EF-15-R-0019 _Dworshak_Unit_3.pdf PDF
Show all 20

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity