Amendment_0002 _W912EF-15-R-0019 _Dworshak_Unit_3.pdf

PDF 7 MB Posted

Attached to
Dworshak Unit 3 Winding Replacement Federal contract opportunity
Solicitation number
W912EF-15-R-0019
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 0002 including specs

View the file

Other files for this federal contract opportunity

Other files attached to Dworshak Unit 3 Winding Replacement, newest first.
File Type Posted
Amendment_0003 _W912EF-15-R-0019.pdf PDF
FIOs_Part5.pdf PDF
FIOs_Part7.pdf PDF
FIOs_Part8.pdf PDF
FIOs_Part4.pdf PDF
FIOs_Part3.pdf PDF
FIOs_Part6.pdf PDF
FIOs_Part9.pdf PDF
FIOs_Part1.pdf PDF
FIOs_Part2.pdf PDF
Plans_Amend_0002.pdf PDF
Site_Visit_List_of_Attendees _Dworshak_Unit_3 _15-R-0019.pdf PDF
Amendment_0001_W912EF-15-R-0019_(2).pdf PDF
PLANS_15-R-0019_fio3.pdf PDF
Site_Visit_Info _Dworshak_Unit_3.pdf PDF
PLANS_15-R-0019_fio1.pdf PDF
PLANS_15-R-0019_fio2.pdf PDF
PLANS_15-R-0019.pdf PDF
Solicitation_with_specs _W912EF-15-R-0019 _Dworshak_Unit_3.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV43467731

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This amendment revises the solicitation as show n on the attached.

The due date for receipt of proposals is extended. Proposals are due no later than 2:00pm, local time, on 24 July 2015.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jun-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0019

X 9B. DATED (SEE ITEM 11)

14-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jun-2015

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

PHYLLIS L. BUERSTATTE

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-15-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0002

Amendment 0002 Summary of Changes – Dworshak Unit 3 Stator Replacement

CHANGES TO CLAUSES:

Revised DFARS 252.236-7001, Contract Drawings and Specifications (Aug 2000)

Added UAI Clause 52.232-5000, Payment for Materials Delivered Off-Site (Mar 2013)

CHANGES TO SPECIFICATIONS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

Subpart 1.2: Added submittal requirement for Project Superintendent

Added new subpart 1.16 for Project Superintendent

01 22 MEASUREMENT AND PAYMENT

A second paragraph has been added to subpart 1.13 to allow for off site work

01 33 00 SUBMITTAL PROCEDURES

A new submittal register is provided since a submittal for a Project Superintendent has been added.

48 13 13.02 26 DISASSEMBLY, REASSEMBLY, AND STARTUP OF HYDRAULIC TURBINE

GENERATOR UNIT

Modified subpart 2.1.1 and 2.1.2

Revised Subpart 3.9.3

48 13 16.00 26 UNIT 3 GENERATOR REWIND

Modified subpart 1.3

Modified first paragraph of subpart 2.5 to delete AWG size requirement

Modified subpart 3.3

Updated subpart 3.19.2

Added Unit 3 100% and 115% Heat Run Results attachment to the end of the section

CHANGES TO DRAWINGS

FIO 001-118 reissued to provide better resolution

G-002: Revised to show the addition of FIO drawings FIO-119-121

FIO-119: added

FIO-120: added

FIO-121: added

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 08-Jul-2015 02:00 PM to 24-Jul-2015 02:00 PM.

SECTION 00700 - CONTRACT CLAUSES

The following have been added by full text:

52.232-5000 PAYMENT FOR MATERIALS DELIVERED OFF-SITE ( March 2013) —UAI

(a) Pursuant to FAR 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site shall be limited to:

(1) Materials required by the technical provisions; or

(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or

(3) Items specifically listed below.

(b) Payment for materials delivered off-site shall be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor’s title to the items delivered off site. Payment for materials delivered off-site shall be limited to the following items: CLINs

0003, 0004, and 0009.

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/52_232.htm#P31_3455

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet Number

Title

Revision Number

Date

DWORSHAK DAM

UNIT 3 STATOR REPLACEMENT

GENERAL

DWP-1.14-0/1 G-001 PROJECT LOCATION - AND - VICINITY MAPS

DWP-1.14-0/2 G-002 INDEX TO DRAWINGS A 6/25/15

DWP-1.14-0/3 G-003 SITE LOCATION PHOTOGRAPHS

DWP-1.14-0/4 G-004 SITE LOCATION - OUTSIDE STAGING AREA

DWP-1.14-0/5 G-005 ERECTION BAY STAGING AREA

DWP-1.14-0/6 G-006 FOUNDATION REPAIR

FOR INFORMATION ONLY (FIO)

The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.

0D0.0118- 198134

FIO-001 SECTIONAL DRAWING OF EXCITER

0D0.1800- 198138

FIO-002 ROTOR YOKE COMPLETE EXCITER

0D0.2990- 198164C

FIO-003 HOUSING FOUNDATION, UNIT 3

0D1.3220- 188499

FIO-004 HIGH PRESSURE LUBE SYSTEM

0D1.3249- 188502

FIO-005 OIL WIPER

OD1.3285-

188509

FIO-006 THRUST BEARING PAD

0D1.3290- 188511

FIO-007 THRUST BRACKET

0D1.3290- 199281

FIO-008 THRUST BRACKET - MIDDLE PART

0D1.3295- 188484

FIO-009 SUPPORT RING FOR GUIDE BEARING

0D1.3297- 188515

FIO-010 THRUST BRACKET - MIDDLE PART

0D1.3299- 188516

FIO-011 THRUST BRACKET WELDING DWG

0D1.3370- FIO-012 OIL POT

188517

0D1.6778- 188525

FIO-013 PIPING FOR SEAL AIR & VENTING

0D1.6780- 188553

FIO-014 COOLING WATER PIPING

0D13255- 188503

FIO-015 BEARING SHELL

10-100-552-005 FIO-016 SOLE PLATE

10-101-434-804 FIO-017

AIR COOLER VENT & DRAIN - MATERIAL LIST

- SHEET 1 OF 1

10-101-651-004-

FIO-018

AIR COOLER PIPING - ARRANGEMENT

MATERIAL LIST - SHEET 1 OF 4

FIO-019

MATERIAL LIST - SHEET 2 OF 4

FIO-020

MATERIAL LIST - SHEET 3 OF 4

FIO-021

MATERIAL LIST - SHEET 4 OF 4

10-200-172-020 FIO-022

FLOW INDICATING SWITCH - FOR SURFACE

AIR COOLERS

10-200-190-402 FIO-023

MAIN UNIT GEN 1-3 ROTOR - ERECTION

PEDESTAL

10-200-411-401 FIO-024

FOUNDATION BOLT FOR - LOWER BEARING

HOUSING - SOLE PLATE

10-200-442-402 FIO-025

JUNCTION BOX FOR BEARING - HOUSING PIT

AREA

10-300-299-401 FIO-026 LIFTING DEVICE

10-300-315-401 FIO-027 SOLE PLATE (STATOR YOKE)

10-300-327-402 FIO-028

MOUNTING SKETCH FOR - BEARING

TEMPERATURE - RELAY & OIL SIGHT GLASS

10-300-345-002 FIO-029 OIL COOLER

10-300-349-401 FIO-030

SUPPORT FOR THRUST - BEARING

LOWERING DEVICE

10-300-353-401 FIO-031 DEVICE FOR REMOVING BUSHES

10-400-149-006 FIO-032 AIR COOLER (LEFT HAND)

10-400-149-007 FIO-033 AIR COOLER (RIGHT HAND)

10-400-164-404 FIO-034 AIR COOLER VENT PIPING AND DRAIN

10-400-188-404 FIO-035

HANDLING ARRANGEMENT - FOR ROTOR

SHAFT & SECTION - STATOR FOR

GENERATOR

10-400-290-402 FIO-036 LIFTING DEVICE

10-400-311-404 FIO-037

NEUTRAL LEAD TERMINAL - ARRANGEMENT,

UNIT 3

10-400-312-402 FIO-038 ROTOR SPIDER COVERS

10-400-325-402 FIO-039 STATOR WINDING DIAGRAM

10-400-344-402 FIO-040 SLIP RING

10-400-366-401 FIO-041

THRUST BEARING LOWERING - DEVICE,

SHEET 3

10-400-375-402 FIO-042 PIPING FOR OIL SUPPLY AND - OIL DRAIN

10-400-376-401 FIO-043 LIFTING DEVICE FOR - THRUST BRACKET

10-500-043-411 FIO-044 UPPER COVER & FAN BAFFLE

10-500-188-406 FIO-045 LOWER COVER & FAN BAFFLE

10-500-347-401 FIO-046 OUTLINE A.C. GENERATOR

10-500-348-401 FIO-047 PLAN OUTLINE U3 - A.C. GENERATOR

10-500-364-401 FIO-048 ROTOR SHAFT

10-500-365-402 FIO-049 AIR COOLER PIPING - ARRANGEMENT

10-500-366-401 FIO-050 ROTOR SPIDER

10-500-372-401 FIO-051

STATOR MAIN LEAD TERMINAL -

ARRANGEMENT, UNIT 3

10-500-376-401 FIO-052 BRAKE & JACK

10-500-384-401 FIO-053 DIMENSION DRAWING OF EXCITER

10-500-397-401 FIO-054 AIR HOUSING DECK PLATES

10-500-415-401 FIO-055

STATOR ASSY & LEAD ARRANGEMENT, U-3 -

ARRANGEMENT, U-3

10-500-423-402 FIO-056 THRUST & GUIDE BEARING - ASSEMBLY

10-500-423-403 FIO-057

THRUST & GUIDE BEARING - ASSEMBLY BILL

OF MATERIALS

10-500-425-401 FIO-058 MOUNTING DEVICE FOR BEARING

10-500-426-401 FIO-059

SHEET 1

10-500-427-401 FIO-060

SHEET 2

10-500-431-402 FIO-061 CURRENT LEADS, UNIT 3

10-500-437-402 FIO-062 SUPERVISORY EQUIPMENT

10-500-438-401 FIO-063 COOLING WATER PIPING

1123-ARE-1 FIO-064 UNIT 3 TURBINE BEARING HOUSING

1123-ARU-1 FIO-065 TURBINE BEARING SHELL PLAN

1123-ARV-1 FIO-066

TURBINE BEARING SHELL - SECTIONS &

DETAILS

1123-ARW-1 FIO-067 55" DIAMETER BEARING ASSEMBLY

1310-QW-1 FIO-068 SPIRAL CASE MAN DOOR - ARRANGEMENT

1D0.1352- 198140A

FIO-069 FAN, UNIT 3

1D0.1389- 198141

FIO-070 SLIPRING LEADS, UNIT 3

1D1.1270- 188481

FIO-071 THRUST BEARING RUNNER

1D1.1352- 207172C

FIO-072 FAN/DRIVE & NONDRIVE SIDE, - UNIT 3

2507-XH-1 FIO-073 BEARING OIL PIPING PANEL

2507-YF-4 FIO-074 TURBINE LUBRICATION SYSTEM

2507-YG-1 FIO-075 VALVE DETAILS

2507-YH-1 FIO-076 LUBRICATION SYSTEM LAYOUT

2D0.1000- 198137

FIO-077 ROTOR COMPLETE, UNIT 3

2D0.1831- 199216

FIO-078 FAN HUB, UNIT 3

3268-XL-1 FIO-079 STAY RING ELEVATIONS

3268-XM-1 FIO-080 STAY RING PLAN

3629-AOV-1 FIO-081 HEAD COVER PLAN

3629-AOW-1 FIO-082 HEAD COVER ELEVATIONS

3630-WZ-1 FIO-083 BOTTOM RING

3D0-1700-19843 FIO-084 COMMUNTATOR COMPLETE- EXCITER

5128-BY-1 FIO-085 GATE OPERATING MECHANICAL - ASSEMBLY

5840-AGA- FIO-086 TURBINE DISTRIBUTOR SECTION

5840-AGB-1 FIO-087 TURBINE DISTRIBUTOR - SECTION, RH

5845-AWS-1 FIO-088 TURBINE SHAFT

5947-IU-5 FIO-089 THRUST COLLAR MODIFICATIONS

6130-T-1 FIO-090 GENERAL ARRANGEMENT

6130-U-1 FIO-091 GENERAL ARRANGEMENT, - UNITS 1-3

6255-AN-2 FIO-092 GATE SEAL ASSEMBLY

6522-AD-1 FIO-093 AUTOMATIC GATE LOCK - ASSEMBLY

6558-DP-1 FIO-094 WEARING RING

L110709-2 FIO-095

THRUST BEARING OIL COOLERS - FIT-UP

ASSEMBLY

L110709-1 FIO-096

THRUST BEARING OIL COOLERS - GENERAL

ARRANGEMENT

L110709-3 FIO-097

THRUST BEARING OIL COOLERS - SHELL

L110709-4 FIO-098

THRUST BEARING OIL COOLERS - CHANNEL

L110709-5 FIO-099

THRUST BEARING OIL COOLERS - BODY

FLANGES, FRONT

L110709-6 FIO-100

THRUST BEARING OIL COOLERS - BODY

FLANGES, RETURN

L110709-7 FIO-101 THRUST BEARING OIL COOLERS - GASKET

L110709-8 FIO-102

THRUST BEARING OIL COOLERS - BUNDLE

L110709-10 FIO-103 THRUST BEARING OIL COOLERS - BAFFLES

L110709-9 FIO-104

THRUST BEARING OIL COOLERS -

TUBESHEETS

L110709-11 FIO-105

THRUST BEARING OIL COOLERS - BILL OF

MATERIALS

DWP-1-3-9/4 FIO-106

GENERATOR COOLING AND GLAND - WATER

SYSTEMS PIPING DIAGRAM

DWP-1-6-

9E21_2

FIO-107 MAIN UNITS ONE LINE DIAGRAM

70624-2 FIO-108 MAIN UNITS THREE LINE DIAGRAM

DWP-1-6-

9E24_5

FIO-109 MAIN UNIT CONTROL SCHEMATIC

OD1-1560-

188486

FIO-110 FIELD COIL

1D1-1570- 188487

FIO-111 POLE

10-101-325-003 FIO-112 DOWEL

DWP-1-9-0_1 FIO-113 POWERHOUSE PLAN EL. 1005

DWP-6-0-0_7 FIO-114

ERECTION BAY & CONTROL STRUCT.

TRANSVERSE SECTION

DWP-1-4-4.41 FIO-115 GENERATOR BARREL DETAILS

10-200-411-402 FIO-116 SOLE PLATE FOR ROTOR ASSEMBLY

10-200-411-402 FIO-117 FOUNDATION BOLT FOR BRAKE SOLE PLATE

10-500-381-401 FIO-118 AIR HOUSING DECK PLATES UNITS 1 & 2

01D.1560- 188486

FIO-119 POLWICKLUNG FZ, FIELD COIL

6/25/15

1D1.1570- 188487

FIO-120 FOL EISENFERTIG FZ, POLE

1D1.7816-

199ABC

FIO-121 POLE MOUNTING DEVICE

(End of drawing list)

(End of clause)

Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.

(End of Summary of Changes)

Dworshak Unit 3 Stator Replacement W912EF-15-R-0019 amendment 0002

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 22 00.00 28 MEASUREMENT AND PAYMENT

01 32 01.00 28 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 28 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 28 CONTRACTOR QUALITY CONTROL

01 51 00.00 28 TEMPORARY UTILITIES

01 54 19.10 28 CRANES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

01 78 00.00 28 CLOSEOUT SUBMITTALS

01 78 23.00 28 OPERATION AND MAINTENANCE DATA

DIVISION 03 - CONCRETE

03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND

MAJOR EQUIPMENT FOUNDATION REPAIR

DIVISION 05 - METALS

05 05 23.20 26 WELDING

05 50 03.00 26 METALWORK, FABRICATION, MACHINE WORK, AND MISCELLANEOUS

PROVISIONS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT

DIVISION 40 - PROCESS INTEGRATION

40 05 13.00 26 SURFACE AIR COOLER PIPING

40 05 13.96 26 WELDING, PIPING

DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT

42 13 19.00 26 SURFACE AIR COOLERS

DIVISION 48 - ELECTRICAL POWER GENERATION

48 08 00.00 28 COMMISSIONING OF ELECTRICAL POWER GENERATION

48 13 13.02 26 DISASSEMBLY, REASSEMBLY, AND STARTUP OF HYDRAULIC TURBINE

GENERATOR UNIT

48 13 13.07 26 GUIDE BEARING INSPECTION

48 13 16.00 26 UNIT 3 GENERATOR REWIND

48 13 16.01 26 MACHINE CONDITION MONITORING OF HYDRAULIC TURBINE

GENERATOR UNIT

48 70 01.00 26 NERC COMPLIANCE FOR HYDROGENERATORS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 FIELD VERIFICATION OF SITE CONDITIONS

1.4 REGULAR CLEANUP AND DEBRIS DISPOSAL

1.5 EQUIPMENT LIST

1.6 TESTING OF EQUIPMENT

1.7 DISPOSITION OF REMOVED EQUIPMENT

1.8 SALVAGE

1.9 RECORD OF PARTS REMOVED FROM THE SITE

1.10 PRE-WORK AND POST WORK SURVEYS

1.11 CARE OF DRAINS

1.12 PROTECTION OF POWERHOUSE FLOORS

1.13 AIR PURITY CONTROL IN THE POWERHOUSE

1.14 FIRE CONTROL

1.15 NOISE CONTROL

1.16 PROJECT SUPERINTENDENT

1.17 KEY PERSONNEL SUBSTITUTION

1.18 POST AWARD MEETINGS

1.18.1 Pre-Work Meeting

1.18.2 Pre-Construction Meeting

1.18.2.1 Minutes

1.18.2.2 Demobilizes And Remobilizes

1.19 WEEKLY PRODUCTION MEETINGS

1.19.1 Minutes

1.20 RED ZONE MEETING

1.21 SCAFFOLDING AND SPECIAL TOOLS

1.22 TOOL AND PARTS ACCOUNTABILITY PROGRAM

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

ATTACHMENTS:

Weekly Production Meeting Agenda Template

Tool and Equipment Checklist

-- End of Section Table of Contents --

SECTION 01 11 01.00 28 Page 1

SECTION 01 11 01.00 28

SUPPLEMENTARY REQUIREMENTS

PART 1 GENERAL

The work covered by this section of the specifications consists of work common to more than one section of these TECHNICAL SPECIFICATIONS.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

Website for the safety manual is http://www.usace.army.mil/SafetyandOccupationalHealth.aspx

The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.95 Occupational Noise Exposure

29 CFR 1926.52 Occupational Noise Exposure

29 CFR 1926.101 Hearing Protection

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Equipment List; I C

Pre-Work Survey Photos And Report; I C

Air Purity Control Program; G C

Project Superintendent; G C

Record of Parts Removed from the Site; G C

Scaffolding and Special Tools; G C

SECTION 01 11 01.00 28 Page 2

G4EDDMTJ

Line

Tool and Parts Accountability Program; G C

SD-07 Certificates

Key Personnel Substitution; G C

SD-11 Closeout Submittals

Post-Work Survey Photos And Report; I C

1.3 FIELD VERIFICATION OF SITE CONDITIONS

The Contractor shall field verify all elevations, dimensions, and coordinates of existing features indicated on the contract drawings that affect new construction. Any deviations shall be updated as per Section 01 33 00, SUBMITTAL PROCEDURES, paragraph MAINTAIN WORKING AS-BUILT

CONTRACT DRAWINGS AND FIO DRAWINGS.

1.4 REGULAR CLEANUP AND DEBRIS DISPOSAL

With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials shall become the property of the Contractor and shall be removed from the job site daily in accordance with Federal, State, and local regulations. The Contractor shall furnish waste containers, all waste containers provided by the contractor shall be emptied weekly.

1.5 EQUIPMENT LIST

The Contractor shall furnish a complete list of all equipment to be used on the project within 180 days after receipt of Notice to Proceed. The Contractor shall submit a revised list in the event of change of equipment. Lists shall include rented equipment as well as lease-purchase or sale-leaseback equipment. The initial list and the revised lists shall indicate dates equipment is assigned to or removed from the project and adequate identification or description of each item of equipment including manufacturer's name (abbreviated), model number, manufacturer's serial number, year of manufacture, and Contractor's assigned serial or record number.

1.6 TESTING OF EQUIPMENT

Before any machinery or mechanized equipment is put to use on the job, it shall be inspected and tested by a qualified person and determined to be in safe operating condition. Cranes or derricks shall be tested by the Contractor or a qualified testing agency in accordance with EM 385-1-1.

Equipment shall be large enough to safely handle proposed picks or tasks without exceeding the crane rating established by these tests.

1.7 DISPOSITION OF REMOVED EQUIPMENT

With the exception of the items listed in the paragraph below titled "SALVAGE" or as otherwise specified in other sections of the specifications, all existing equipment removed and not reinstalled shall become the property of the Contractor, removed from the Project site, and disposed of in a legal manner. Materials that cannot be removed daily may

SECTION 01 11 01.00 28 Page 3 be temporarily stored on-site at an approved area. Salvaged materials shall not be sold on the project site.

1.8 SALVAGE

Some items will remain the property of the Government during the contract and after completion. Salvage shall include removal of the material, equipment, etc., from its present location and transporting, bundling, protecting, cleaning, and storing it on-site as directed. Salvage items will be those specified. Adequate property control records shall be maintained for all materials or equipment specified to be salvaged. These records may be in accordance with the Contractor's system of property control. The Contractor shall be responsible for the adequate storage and protection of all salvaged materials and equipment and shall replace all salvage materials and equipment which are stolen, broken, or damaged during the salvage operations as the result of the Contractor's negligence, or while in the Contractor's care.

The following items shall be salvaged:

1. Thrust Bearing Coolers.

1.9 RECORD OF PARTS REMOVED FROM THE SITE

Record of parts shipped from the project for repair shall be provided weekly at the coordination meeting. A complete written record for parts control shall be maintained of the location and estimated date of return of all parts shipped from the project for repair. This record shall be kept up to date continuously at all times.

1.10 PRE-WORK AND POST WORK SURVEYS

The Contractor shall conduct a pre-work survey and a post-work survey, with the Contracting Officer Representative, of the Government facilities at the proposed work areas. The results of the surveys shall be documented by digital photographs and descriptive narrative reports. A color copy of the survey photographs and narrative reports shall be submitted to the Contracting Officer.

1.11 CARE OF DRAINS

Existing powerhouse floor drains shall not be used for disposal of any solid material or any liquids other than clear water. The Contractor shall demonstrate that the pipes and drains are unobstructed when so directed.

1.12 PROTECTION OF POWERHOUSE FLOORS

Care shall be taken to prevent damage to terrazo floors within the powerhouse. Minimum protection shall include continuous cover of three-layer, oil-impervious craft paper over all loading/unloading, traffic and work areas. Place continuous layer of 3/4-inch-thick tongue and groove plywood in aninterlocking pattern on floor areas to receive equipment or stored items. Pipe trenches shall remain accessible even if covered. All designations relating to fire protection equipment that get covered shall be remarked after covering. Provide additional blocking and timbers when required. Also suitably protect other surfaces of work. Damage to floor caused by Contractor's operation shall be repaired at no additional cost to Government. Repairs shall match surrounding area in color, texture, and surface finish and are subject to approval. Work in the powerhouse shall

SECTION 01 11 01.00 28 Page 4 not start until floor protection meets the requirements stated above.

The Contractor is responsible for restoring the floor to its preconstruction condition with the exception of stripping and waxing. The Government will strip and wax the floor.

1.13 AIR PURITY CONTROL IN THE POWERHOUSE

The Contractor shall take such measures as are necessary to effect maximum control, and prevent escape into the powerhouse, of all dust and fumes created by operations under this contract. To the maximum extent possible, all dust and dirt shall be removed by vacuum cleaning. At least 10 working days prior to commencement of work in the powerhouse, the Contractor shall submit for approval, in writing, a proposed Air Purity Control Program.

Air Purity Control Program shall include, but not necessarily be limited to, the following:

(1) Adequate isolation and ventilation of air arcing, welding, burning, and grinding operations.

(2) Provision of exhaust ducts that shall discharge outside the powerhouse structure where mechanical ventilation is used.

(3) Controlled operation of power driven tools.

(4) Furnishing and removing of oiled sawdust or other dust preventatives in areas that cannot be properly rendered free from excessive dusting by vacuum cleaning or other methods.

(5) Vacuum cleaning of spaces within the work areas where dust accumulates.

(6) Air-, electrical-, or battery-driven equipment may be used inside the powerhouse.

(7) Internal-combustion engine powered equipment will not be permitted to operate inside the powerhouse unless exhausted to the exterior except for short periods of time to unload materials and equipment.

Depending upon the Contractor's plant, equipment, and methods of operation, additional provisions for satisfactory air purity control will be required and shall be included in the proposed Air Purity Control Program.

1.14 FIRE CONTROL

Each piece of internal combustion engine driven equipment used at the work site shall be equipped with a fire extinguisher in accordance with recommendation NFPA as appropriate. The minimum approved rating of extinguishers shall not be less than 5-B:C.

1.15 NOISE CONTROL

Noise control and noise levels shall conform to requirements set forth in the appropriate regulations, including EM 385-1-1, Section 05.C, 29 CFR 1910.95, 29 CFR 1926.52 and 29 CFR 1926.101. The most conservative requirement shall govern.

SECTION 01 11 01.00 28 Page 5

1.16 PROJECT SUPERINTENDENT

The Project Superintendent shall be technically qualified to supervise the installation, preparation, and testing of stator bars and cores, rewinding stators, disassembly and reassembly of hydraulic turbine driven generators, and perform field tests shall be present at the work site at all times. The representative shall report immediately in writing to the Contracting Officer any work not in accordance with the manufacturer's recommendation or any special conditions which may result in an unsatisfactory job. The Project Superintendent shall be employed by the Prime Contractor and shall be at the work site any time active work is underway. The Project Superintendent shall have supervised the disassembly, rewind, and reassembly of at least two (2) similar units of 50 MW or larger over the past ten years, and at least five (5) years experience working as a supervisor on similar projects. The Project Superintendent's qualifications shall be submitted in resume format to the Contracting Officer for approval.

1.17 KEY PERSONNEL SUBSTITUTION

If the Contractor plans on replacing any Key personnel (Project Superintendent, Site and Safety Health Officer (SSHO), CQC System Manager, or CQC staff Members) they must have the approval of the Contracting Officer. Personnel shall possess the qualifications that meet or exceed those stated in the specifications for the position they are replacing.

Submit qualifications of new personnel at least 15 calendar days in advance of date of replacement.

1.18 POST AWARD MEETINGS

1.18.1 Pre-Work Meeting

Within 10 days after receipt of Notice to Proceed, the Contractor shall attend a Pre-Work meeting. The meeting will be held at Dworshak Dam.

Senior Level members of the Contractor's staff involved with this contract shall participate in this meeting in person to discuss the overall contract requirements. The Government will lead this meeting and take the meeting minutes.

1.18.2 Pre-Construction Meeting

The Project Superintendent shall coordinate with the Contracting Officer and establish the date of the Pre-Construction Meeting. The meeting will be held at the project site at least one (1) week prior to mobilizing to the job site. The Project Superintendent shall lead the Pre-Construction Meeting discussing the Contractor's plan on executing the work at the project site, schedule, required clearances and timeframe for them, and plan for implementing safety and quality control. The Government will have key members from the Project staff to discuss environmental and clearance issues. Key members of the contractor staff shall attend this meeting including the Quality Control (QC) System Manager, Site Safety and Health Officer (SSHO).

1.18.2.1 Minutes

The Project Superintendent shall be responsible for taking the meeting minutes and shall send them electronically within 48 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.

SECTION 01 11 01.00 28 Page 6

1.18.2.2 Demobilizes And Remobilizes

Anytime the Contractor demobilizes from the site and remobilizes at a later date, another Pre-Construction meeting shall be held and shall follow the requirements listed above.

1.19 WEEKLY PRODUCTION MEETINGS

During all onsite construction work the Project Superintendent shall lead a weekly production meeting using the attached "Weekly Production Meeting Agenda Template" to brief the Government on the status of the project. All elements listed in the agenda shall be thoroughly discussed. For example, the Project Superintendent shall provide the Government a three (3) week "look-ahead" that describes all the planned construction activities, onsite and offsite, over the next three (3) weeks. The "look-ahead" shall be generated in P6 and then copied into Excel for more detail (see examples at the end of this section). These activities shall align to the overall construction schedule submitted under SECTION 01 32 01.00 28 PROJECT SCHEDULE, and if the three (3) week "look-ahead" differs from the construction schedule, the construction schedule shall be updated to include these changes by the next scheduled update. Key members of the Contractor's staff shall attend this meeting, including the Quality Control System Manager, who is responsible for discussing QC aspects of the work as outlined under SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL and SSHO.

The Government reserves the right to require any person from the Contractor's staff, such as the Project Manager, Engineer, scheduler, etc., or key subcontractor personnel to attend this meeting, if Government feels their participation is required.

1.19.1 Minutes

The Project Superintendent shall be responsible for taking the meeting minutes and shall send them electronically within 24 hours of the meeting to the Government's Project Engineer, Quality Assurance Representative, and Resident Engineer.

1.20 RED ZONE MEETING

Within one (1) month of completing the project or when the project is 80 percent completed, the Contractor’s Superintendent shall set up and lead a Red Zone meeting. The Contractor’s Superintendent shall contact the Contracting Officer to Schedule this meeting. The Government’s representative will include key personnel from the Project, Project Engineer, Quality Assurance Representative, and Resident Engineer. The key people from the Contractor shall be, at a minimum, the Project Superintendent, Quality Control System Manager, Scheduler, key subcontractors personnel, and Project Manager.

The purpose of this meeting is to develop an overall schedule for all activities required by both the Government and Contractor and to complete the project. The Government will come prepared with all their activities, key dates, and durations for all work required by the Government to complete the project. The Contractor shall provide the same information for all of their activities. The Contractor’s scheduler shall input all of this information into the Contractor’s project schedule during the meeting.

This schedule shall be updated weekly, or as needed, based on the information from the weekly production meetings for both the Government and

SECTION 01 11 01.00 28 Page 7

Contractor activities.

1.21 SCAFFOLDING AND SPECIAL TOOLS

a. Scaffolding shall comply in every respect with EM 385-1-1 and as applicable with SECTION 05 50 03.00 26 METALWORK FABRICATION, MACHINE WORK, AND MISCELLANEOUS PROVISIONS. Any scaffolding, ladder, stairway, or other access schemes proposed to be used shall be submitted to include type, layout, connections and product literature. Approved anti-slip surface material shall be installed on scaffolding platforms. Specific EM 385-1-1 scaffolding requirements include:

EM 385-1-1 Section 22.B.05: Contractors shall use a scaffold tagging system in which all scaffolds are tagged by the Competent Person. Tags shall be color-coded: green indicates the scaffold has been inspected and is safe to use; red indicates the scaffold is unsafe to use. Tags shall be readily visible, made of materials that will withstand the environment in which they are used, be legible and shall include:

a. The Competent Person's name and signature;

b. Dates of initial and last inspections.

EM 385-1-1 Section 22.B.06: Anyone involved in erecting, disassembling, moving, operating, using, repairing, maintaining or inspecting a scaffold shall be trained by a Competent Person to recognize any hazards associated with the work in question. Proof of training shall be available upon request.

The Competent Person shall be trained in accordance with EM 385-1-1 Section 22.B.02.

b. The existing draft tube platform will be made available for use by the contractor. The Government will install the draft tube platform.

The Government will cover the platform with pre-fitted fire rated plywood to prevent the release of material below the grating.

c. The Contractor shall provide all special tools necessary to perform the work. Any special tools provided by the original turbine or generator manufacturers and still in the possession of the Government will be made available to the Contractor. Only tools necessary for assembly and disassembly will be made available. The list of tools available for Contractor use is contained in in the "LISTING OF GOVERNMENT-FURNISHED PROPERTY" table located in Section 00800.

1.22 TOOL AND PARTS ACCOUNTABILITY PROGRAM

Unit 3 is considered a critical work area. Tool and part control and accountability, including personal items, is necessary to ensure that foreign objects are not left behind when a job is complete. This is especially important in areas where loose objects can cause serious damage to critical equipment. Loose objects in identified areas are not desirable, and inspections must be conducted to ensure that loose objects are not left behind. Tools, parts, and personal items will be controlled and accounted for. All job plans and AHAs for work inside these areas shall document the requirement for this accountability process.

Implement the tool and part accountability program prior to reinstalling

SECTION 01 11 01.00 28 Page 8 the rotor.

The following procedure apply:

Tools and Parts Control and Accountability Procedure

a. Purpose: Provide tools and parts control and accountability.

1. Tool and parts control and accountability, including personal items, are necessary to ensure that foreign objects are not left loose within the following confined areas. This confined area is defined as the inside diameter or the air housing above the lower bearing bracket.

2. Loose objects inside the above-described area are not desirable, and inspections must be conducted to ensure that loose objects are not left in place.

3. Pieces of equipment are stored and/or repaired/replaced inside and outside the confined area. There is not a practical means of controlling all access to the equipment outside the confined area and therefore, control of tools, small parts, and other foreign objects outside the confined area is not practical.

4. Tools, parts, and personal items shall be controlled and accounted for inside the confined area. Tools, parts, and personnel should only access the confined area from the balcony, the turbine pit access, and air housing door. The Contractor shall be responsible for overall control of tools, parts, and people. The Government construction representatives will ensure compliance by Government personnel and Government visitors.

5. Special meetings to announce start of this control and to emphasize performance for everyone will be conducted jointly with Contractor and Government personnel.

b. Inspections:

1. The confined area shall be inspected independently by each representative of the Contractor and Government personnel after all repairs/replacements are made to the stator.

2. All equipment shall likewise be inspected independently by the Contractor and Government after all repair/replacement and just prior to reinstallation.

3. Personnel shall remove all personal items and tools from their person prior to making the inspections. Removal of the personal items shall be verified by the Contractor's representative.

4. At the end of each shift, during reassembly, the Contractor's supervisor shall inspect the area within the air housing inside the diameter and above the lower cover plates for any loose tools and parts. Loose tools and parts shall be removed and accounted for each day. No personnel will leave the area until everything logged into the confined area is logged out of the area.

5. The confined area shall be independently inspected by the

SECTION 01 11 01.00 28 Page 9

Contractor and Government personnel just prior to reinstallation of the upper and lower air deflectors. A cleanout inspection procedure/plan shall be developed with the Contractor and the Government. A trial hunt shall be utilized to fine tune the procedure. In addition, just prior to unit startup, an independent inspection by the Contractor and Government personnel shall be performed on all those areas still visible within the confined area.

c. Tools, Parts, and Personal Items Control and Accountability:

1. To control the tools entering the confined area, all personal transportable tools shall be checked out of a controlled space, such as large tool bins of fenced cages, and checked back in on each shift. A dedicated tool person (laborer) on each shift shall be responsible to assure that inventoried tools for each craftsman are checked out to that craftsperson at the beginning of the shift and checked back in at the end of each shift. The inventory shall be specified; that is, each tool shall be identified for each craftsperson and a checklist with all the tools listed shall be checked for tools checked out and in each day and signed by the tool person. If a tool is lost during the shift, the craftsperson shall be directed to find the tool before he is allowed to leave the site. A sample Tool and Equipment Checklist is attached.

2. To control small personally transportable parts entering the confined area, the dedicated tool control person shall inventory and issue the parts at the start of each shift. At the end of each shift, a count shall be made of the installed parts to ensure that the number checked out was actually installed. The Contractor's supervisor shall reconcile any shortage of small parts.

d. Responsibility and Records:

1. The Contractor's supervisors shall be responsible that all tools are accounted for and signed in and out on a daily basis.

2. A copy of the Tool Equipment Daily Checklist shall be turned in to the Contracting Officer at the end of each shift.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 11 01.00 28 Page 10

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 RETAINAGE OF PAYMENT

1.2 ITEM 0001 MOBILIZATION AND DEMOBILIZATION

1.3 ITEM 0002 DESIGN AND MANUFACTURE STATOR LAMINATION STAMPING DIE

1.4 ITEM 0003 DESIGN, MANUFACTURE, TEST, AND DELIVER STATOR LAMINATIONS

1.5 ITEM 0004 FURNISH COMPLETE SET OF STATOR BARS

1.6 ITEM 0005 FURNISH FOR TEST AND HAVE TESTED 13 PROTOTYPE BARS

1.7 ITEM 0006 FURNISH SPARE GENERATOR PARTS

1.8 ITEM 0007 PRE-DISASSEMBLY MEASUREMENTS

1.9 ITEM 0008 GENERATING UNIT DISASSEMBLY INCLUDING INSPECTIONS OF

COMPONENTS

1.10 ITEM 0009 PROVIDE SURFACE AIR COOLER ASSEMBLIES AND ASSOCIATED

PIPING

1.11 ITEM 0010 PROVIDE AIR SHROUDS

1.12 ITEM 0011 SPECIAL TOOLS AND SCAFFOLDING

1.13 ITEM 0012 ON-SITE GUIDE BEARING INSPECTIONS AND RTD REPLACEMENT

1.14 ITEM 0013 REMOVE STATOR WINDING AND STATOR CORE

1.15 ITEM 0014 INSTALL AND TEST NEW GENERATOR STATOR CORE

1.16 ITEM 0015 INSTALL AND TEST STATOR WINDING

1.17 ITEM 0016 INSTALL AND TEST MACHINE CONDITION MONITORING SYSTEM

1.18 ITEM 0017 OIL STORAGE SYSTEM

1.19 ITEM 0018 REFURBISH AND FACTORY TEST ROTOR FIELD POLES

1.20 ITEM 0019 INSPECT, CLEAN, AND TEST ROTOR

1.21 ITEM 0020 GENERATING UNIT ALIGNMENT AND REASSEMBLY

1.22 ITEM 0021 POST-ASSEMBLY MEASUREMENTS, INSPECTIONS, AND TESTS

1.23 ITEM 0022 PERFORM MODEL VALIDATION TESTING FOR GENERATOR

1.24 ITEM 0023 UNIT FOUNDATION CRACK REPAIR

1.25 ITEM 0024 ADDITIONAL CRACK REPAIR

1.26 ITEM 0025 UNIT FOUNDATION GROUT REPAIR

1.27 ITEM 0026 ADDITIONAL GROUT REPAIR

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

SECTION 01 22 00.00 28 Page 1

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.

1.1 RETAINAGE OF PAYMENT

Retainage in the amount of 10% of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10% retainage for final submittals will not be held until such time as the Contractor has earned 90% of the original contract value. See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" for additional information.

1. Final Operation and Maintenance Manuals and Parts Catalogs.

2. Final Approved Versions of Contractor Prepared Drawings.

3. As-built contract drawings and FIO drawings.

4. Return of Government Issued Items.

1.2 ITEM 0001 MOBILIZATION AND DEMOBILIZATION

Measurement and payment for mobilization and demobilization will be in accordance with Contract CLAUSE: PAYMENT FOR MOBILIZATION AND DEMOBILIZATION. This item will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001, "Mobilization and demobilization," which price and payment shall be full compensation for mobilizing and demobilizing all plant and equipment required for performance of the work, as specified and approved.

1.3 ITEM 0002 DESIGN AND MANUFACTURE STATOR LAMINATION STAMPING DIE

Payment for designing and manufacturing the new stator lamination stamping die shall be made on a lump sum basis under Line Item No. 0002. Payment shall include, labor, material, and equipment required to design and manufacture the stator lamination stamping die as specified in SECTION

48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.4 ITEM 0003 DESIGN, MANUFACTURE, TEST, AND DELIVER STATOR LAMINATIONS

Payment for designing, manufacturing, testing, and delivering the stator laminations shall be made on a lump sum basis under Line Item No. 0003.

Payment shall include, labor, material, and equipment required to design, manufacture, test, and deliver stator laminations (to include vent duct spacers) as specified in SECTION 48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.5 ITEM 0004 FURNISH COMPLETE SET OF STATOR BARS

Payment shall be made under Line Item No. 0004 on a per set basis.

Payment shall include the furnishing of a complete set of stator bars, including factory testing and all supplies and accessories to make up a

SECTION 01 22 00.00 28 Page 2 complete new winding, including design, manufacturing, and factory testing as specified in SECTION 48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.6 ITEM 0005 FURNISH FOR TEST AND HAVE TESTED 13 PROTOTYPE BARS

Payment shall be made on a lump sum basis under Line Item No. 0005.

Payment shall include furnishing and testing thirteen (13) prototype stator bars, and having them tested by an independent testing laboratory, as specified in SECTION 48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.7 ITEM 0006 FURNISH SPARE GENERATOR PARTS

Payment shall be made at the contract lump sum price under Line Item No.

0006. Payment shall include the furnishing of all spare parts to include bars, RTDs, vent spacers, and laminations as specified in SECTION 48 13

16.00 26, UNIT 3 GENERATOR REWIND.

1.8 ITEM 0007 PRE-DISASSEMBLY MEASUREMENTS

Payment for measurements prior to disassembly shall be made on a lump sum basis under Line Item No. 0007. Payment shall include labor, material, and equipment required to perform pre-disassembly operational testing and measurements and un-watered unit inspections and measurements in accordance with SECTION 48 13 13.02 26.

1.9 ITEM 0008 GENERATING UNIT DISASSEMBLY INCLUDING INSPECTIONS OF

COMPONENTS

Payment for disassembly including inspections of components shall be made on a lump sum basis under Line Item No. 0008. Payment shall include, labor, material, and equipment required to disassemble the generating unit, perform disassembly measurements, cleaning, and inspections in accordance with the Contractor's approved disassembly procedure, as shown on the drawings, and in accordance with the specifications. For additional information see SECTION 48 13 13.02 26.

1.10 ITEM 0009 PROVIDE SURFACE AIR COOLER ASSEMBLIES AND ASSOCIATED PIPING

Payment for providing surface air cooler assemblies and associated piping shall be made on a lump sum basis under Line Item No. 0009. Payment shall include, labor, material, and equipment required to furnish, install, and test air surface coolers and all associated water and vent piping and valves in accordance with the specifications. See SECTION 40 05 13.00 26, SECTION 40 05 13.96 26, and SECTION 42 13 19.00 26 for additional information.

1.11 ITEM 0010 PROVIDE AIR SHROUDS

Payment for the providing air shrouds shall be made on a lump sum basis under Line Item No. 0010. Payment shall include, labor, material, and equipment required to furnish, install, and test air shrouds for stator winding end turns in accordance with the specifications. See SECTION 48 13

16.00 26 for additional information.

1.12 ITEM 0011 SPECIAL TOOLS AND SCAFFOLDING

Payment for special tools and scaffolding shall be made on a lump sum basis under Line Item No. 0011. Payment shall include labor, material, and equipment required to transport on site special tools and scaffolding and

SECTION 01 22 00.00 28 Page 3 includes erection and labor in accordance with SECTION 01 11 01.00 28.

1.13 ITEM 0012 ON-SITE GUIDE BEARING INSPECTIONS AND RTD REPLACEMENT

Payment for turbine and generator guide bearing site inspections and RTD replacement shall be made on a lump sum basis under Line Item No. 0012.

Payment shall include labor, material, and equipment required to clean guide bearings, and miscellaneous components, Babbitt surface finish, bearing insulation, pressure test cooling coils, replace guide bearing RTDs, and to perform turbine guide, generator guide, and miscellaneous component site inspections including NDT in accordance with the specifications. For additional information see SECTION 48 13 13.02 26 and

SECTION 48 13 13.07 26.

Item 0012 work may be performed at a vendor's shop provided that the contract requirements for RTD replacement (Section 48 13 13.02 26) and guide bearing inspections (Section 48 13 13.07 26) are met.

1.14 ITEM 0013 REMOVE STATOR WINDING AND STATOR CORE

Payment shall be made under Line Item No. 0013 on a lump sum basis.

Payment shall include labor, material, and equipment required for the removal of the stator winding and stator core and for cleaning of the area, components, and mating surfaces as specified in SECTION 48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.15 ITEM 0014 INSTALL AND TEST NEW GENERATOR STATOR CORE

Payment for installing and testing the new generator stator core shall be made on a lump sum basis under Line Item No. 0014. Payment shall include, labor, material, and equipment required to install and test the new stator core as specified in SECTION 48 13 16.00 26, UNIT 3 GENERATOR REWIND.

1.16 ITEM 0015 INSTALL AND TEST STATOR WINDING

Payment shall be made under Line Item No. 0015 on a lump sum basis.

Payment shall include the installation and testing of the new stator windings, clamping system,…