Site_Visit_Info _Dworshak_Unit_3.pdf
PDF 180 KB Posted
- Attached to
- Dworshak Unit 3 Winding Replacement Federal contract opportunity
- Solicitation number
- W912EF-15-R-0019
About this file
SITE VISIT information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003 _W912EF-15-R-0019.pdf | ||
| FIOs_Part9.pdf | ||
| FIOs_Part8.pdf | ||
| FIOs_Part4.pdf | ||
| FIOs_Part3.pdf | ||
| Amendment_0002 _W912EF-15-R-0019 _Dworshak_Unit_3.pdf | ||
| FIOs_Part6.pdf | ||
| FIOs_Part5.pdf | ||
| FIOs_Part7.pdf | ||
| FIOs_Part1.pdf | ||
| FIOs_Part2.pdf | ||
| Plans_Amend_0002.pdf | ||
| Site_Visit_List_of_Attendees _Dworshak_Unit_3 _15-R-0019.pdf | ||
| Amendment_0001_W912EF-15-R-0019_(2).pdf | ||
| PLANS_15-R-0019_fio1.pdf | ||
| PLANS_15-R-0019_fio2.pdf | ||
| PLANS_15-R-0019_fio3.pdf | ||
| PLANS_15-R-0019.pdf | ||
| Solicitation_with_specs _W912EF-15-R-0019 _Dworshak_Unit_3.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Tuesday, 02 June 2015 at 10:00 a.m. local time
(c) Participants will meet at—the parking lot located roughly ¼ mile downstream of the
Dworshak Dam powerhouse. At 10:00am, Government personnel will bring participants into the Project, and we expect the site visit to end by 2:00pm. Participants should bring hard hats, safety shoes, and safety glasses.
There will be only one site visit offered. Offerors planning to attend must register for the site visit by sending an email to: Phyllis.L.Buerstatte@usace.army.mil and Jani.C.Long@usace.army.mil
Firms must register no later than the day before the site visit.
Site visit attendees must provide the following information: 1) Solicitation Number; 2) Project Title; 3)
Name(s) of individual(s) attending site visit; 4) Are all individuals U.S. Citizens? If not, please refer to
ACCESS FOR FOREIGN NATIONALS in Section 00800; 5) Name of Company; 6) Phone Number of
Company. Each individual must have picture identification on his/her person while at the project site. There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.
Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements
Manual (EM 385-1-1, latest version) in accordance with Section 5, “Personal Protective and Safety Equipment.” It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation.
Failure to comply could result in denial of access to site visit location.
The latest version of EM 385-1-1 is available online at:
http://www.usace.army.mil/SafetyandOccupationalHealth.aspx.
(End of provision)
Participants will be led into the powerhouse to look at spare parts, tooling, lifting beams, Unit 3. On Unit 3, the expectation is to remove a top hatch cover and a top air shroud to allow access to the top of the end winding for inspection and measurements. Will also remove some of the inspection hatches on the barrel on the perimeter of the stator to allow visual view of the back of the core.
Vendors will not be allowed to crawl around the whole top of the rotor, but only in the small restricted area designated by the Government. Only 2-3 people will be allowed to enter the unit at one time; 10 minutes maximum until all visitors have had access, then the unit will remain open for others who wish to reenter.