Dutch Joe Bridge Replacement
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 1240LT24R0037
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Wyoming, United States
- Points of contact
-
- Derrick A Dodson derrick.dodson@usda.gov (801) 625-5605
- Katy Bilisoly katy.bilisoly@usda.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Bridger-Teton National Forest (BTNF) is seeking to remove and replace the existing 44-foot timber Dutch Joe Bridge with an 80-foot rolled girder bridge as part of the Dutch Joe Bridge Replacement project. The project will also include the furnish and installation of a temporary bridge to allow for road access during construction activities. The project must be completed between July 1st and October 14th due to wildlife migration corridor requirements. This procurement is being solicited as a Small Business set-aside, with the intent to award a Firm-Fixed Price contract.
The anticipated contract value is between $500,000 and $1,000,000, with a period of performance of 480 days. This procurement is being conducted under a Small Business set-aside, and all prospective contractors must be registered in the System for Award Management (SAM) before award of contract. The complete solicitation package will be made available through SAM.gov, with a due date of May 31, 2024 for proposal submissions.
Notice text
The Bridger-Teton National Forest (BTNF) Dutch Joe Bridge Replacement project will remove and replace the existing Dutch Joe Bridge (370850-2.011). The existing bridge is 44-foot timber structure and will be replaced with an 80-foot rolled girder bridge. The project will also include furnish and install of a temporary bridge located downstream from existing to allow for temporary road access during construction activities. Project must start and be complete between July 1st and October 14th as it is part of a wildlife migration corridor.
Files
| File | Type | Posted |
|---|---|---|
| Presolicitation Notice 1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Dutch Joe Bridge Replacement | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| YELL 338223 - Bridge Preservation | National Office | No set-aside | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity