DRAFT: USACE SPK Design-Bid-Build (DBB) Construction F-35 East Campus Infrastructure Hill AFB, UT
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9123825R0007
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers (USACE) Sacramento District has issued a Special Notice for a Design-Bid-Build (DBB) construction project at Hill Air Force Base in Utah. The solicitation, identified by number W9123825R0007 (also W9123825RA002), is a pre-solicitation announcement for a Single Award Task Order Contract (SATOC) Indefinite Delivery Indefinite Quantity (IDIQ) project. The contract will focus on infrastructure development on the east campus of Hill AFB, with a total contract capacity not exceeding $115 million and a 799-day ordering period. The project is anticipated to be awarded around April 30, 2025, and will involve comprehensive utility infrastructure construction. The solicitation falls under NAICS category 237990 for Other Heavy and Civil Engineering Construction.
Contractors interested in this opportunity must be registered in both the Procurement Integrated Enterprise Environment (PIEE) and System for Award Management (SAM) systems, with electronic proposal submission through PIEE being mandatory. The draft solicitation will be officially issued around February 19, 2025, with full and open competition available. A pre-proposal conference is scheduled for March 5, 2025, at Hill AFB, and contractors must register for attendance by February 26, 2025. The project encompasses extensive infrastructure work including taxiways, tow-ways, airfield lighting, roadways, parking areas, pump houses, lift stations, an IT node building, and TACAN facility relocation. The construction will require complex coordination with public, privatized, and government utilities across water, sewer, electrical, storm, natural gas, and communication systems. The estimated construction magnitude ranges between $100-250 million, presenting a significant opportunity for qualified contractors in the heavy civil engineering construction sector.
Notice text
2 versions
Update #2 · Latest ·
Solicitation number is W9123825R0007, due to the new contracting writing system W9123825RA002 will be used interchangeably. UPDATE TO THE PRESOLICITATION NOTICE: DRAFT SOLICITATION IS ATTACHED TO THIS NOTICE FOR YOUR PLANNING AND READ AHEAD FOR THE UPCOMING ISSUANCE OF THE OFFICIAL SOLICITATION ON OR AROUND 19 FEBRUARY 2025. NO QUESTIONS WILL BE ACCEPTED AT THIS TIME.
It is currently anticipated that the Government will conduct a pre-proposal conference and/or site visit on: Meeting Place:
Hill AFB USACE Resident Office (Building 367)
7227 6th St Ste S560, Hill AFB, Ut 84056Date/Time: 5 March 2025 @ 0900 – 1200
The information below is requested via email for each attendee NLT 5:00PM MDT on Tuesday, 26 February 2025Please put "HAFB East Campus Infrastructure Project 26 FEB 2025" in the subject line.
-Complete legal name of employee
- Date of Birth- Driver License Number and State of Issuance
- Company
- Email Address Please provide the information to: Lee Roach, lee.t.roach@usace.army.mil
Update #1 ·
Solicitation number is W9123825R0007, due to the new contracting writing system W9123825RA002 will be used interchangeably. UPDATE TO THE PRESOLICITATION NOTICE: DRAFT SOLICITATION IS ATTACHED TO THIS NOTICE FOR YOUR PLANNING AND READ AHEAD FOR THE UPCOMING ISSUANCE OF THE OFFICIAL SOLICITATION ON OR AROUND 19 FEBRUARY 2025. NO QUESTIONS WILL BE ACCEPTED AT THIS TIME.
Files
| File | Type | Posted |
|---|---|---|
| Updated Pre-Solicitation Notice W9123825R0007 - W9123825RA002.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| USACE SPK Design-Bid-Build (DBB) Construction - F-35 East Campus Infrastructure - Hill AFB, UT | Award Notice | |
| USACE SPK Design-Bid-Build (DBB) Construction - F-35 East Campus Infrastructure - Hill AFB, UT | Solicitation | |
| This notice | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID | ENDIST Seattle | No set-aside | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity