Douglas Harbor Floating Breakwater, Douglas Alaska

Awarded Award Notice Posted

Solicitation number
W911KB-09-R-0009
Agency
ENDIST Alaska US Army Corps of Engineers, Department of Defense
Awarded
to Concrete Technology Corporation
Set-aside
No set-aside

Opportunity facts

Contract number
W911KB-09-C-0020 Federal contract award
NAICS code
327390 Other Concrete Product Manufacturing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: Apr 01, 2009 2:35 pm

Amendment 0004 has been issued.

Update #4 ·

Added: Mar 27, 2009 6:35 pm

Amendment 0003 has been issued

Update #3 ·

Added: Mar 23, 2009 7:46 pm

Amendment 0002 has been issued.

Update #2 ·

Added: Mar 09, 2009 9:42 pm

Amendment 0001 is posted

Update #1 ·

Added: Jan 28, 2009 8:27 pm

A Request for Proposal in electronic format only will be available for download on or about February 11, 2009 at www.fbo.gov  No disks shall be mailed.  Any resulting contract will be firm-fixed priced.  The North American Industrial Classification System code is 327390, which has a size standard of 500 employees.  Joint ventures must also be registered in CCR as a joint venture.  We advise contractors begin this process as soon as possible should they be selected for the award.  The solicitation shall be issued as a commercial solicitation in accordance with FAR Parts 12 and 13.  The requirement for the submission of both performance and payment bonds, in an amount equivalent to 100% of the award price, therefore, the successful firm shall have the capability to acquire such bonding.  DESCRIPTION OF WORK:  Scope is to procure a 230' long, floating breakwater and to transport the floating breakwater to the Juneau/Douglas area and turn it over to the City and Borough of Juneau.  A full design is included for a monolithic, 18' wide by 8' deep, foam filled, post-tensioned concrete, barge-type structure.  Exhibit drawings will show the anticipated moorage for this structure.  A performance specification for the floating breakwater will also be included.  The floating breakwater must provide stable transient moorage space and undergo only limited movement during tidal fluctuations and under wind and wave related loading.  The west end of the floating breakwater must accommodate a future gangway and there is limited depth under the west end.  It is expected that pile moorage is the only way to achieve the necessary stability of the floating breakwater.

Attachments

Files attached to this notice, newest first
File Type Posted
W911KB-09-R-0009-0004 with specs.pdf PDF
Amendment 0003 Dwgs-DGH180942A.pdf PDF
W911KB-09-R-0009-0003 with specs.pdf PDF
W911KB-09-R-0009-0002.pdf PDF
W911KB-09-R-0009-0001.pdf PDF
09R0009 Maxview Dwgs.zip ZIP file
09R0009 Dwgs.dwf DWF file
09R0009 Dwgs.pdf PDF
09R0009 Sol and Specs.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity