W911KB-09-R-0009-0004 with specs.pdf
PDF 39 KB Posted
- Solicitation number
- W911KB-09-R-0009
About this file
Amendment 0004 with specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003 Dwgs-DGH180942A.pdf | ||
| W911KB-09-R-0009-0003 with specs.pdf | ||
| W911KB-09-R-0009-0002.pdf | ||
| W911KB-09-R-0009-0001.pdf | ||
| 09R0009 Maxview Dwgs.zip | ZIP file | |
| 09R0009 Dwgs.pdf | ||
| 09R0009 Dwgs.dwf | DWF file | |
| 09R0009 Sol and Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Project Title and Location: Douglas Harbor Floating Breakw ater
a. The above numbered Solicitation is hereby amended to add Questions and Answ ers, and revise the specifications. The specific changes are identified on Page 2, Summary of Changes.
b. The dated and time for receipt of offers is changed from 3 Apr 2009 at 4:00 PM to 9 Apr 2009 at 4:00 PM.
c. Point of contact for this amendment is R. David Williams at (907) 753-5571.
d. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-09-R-0009
X 9B. DATED (SEE ITEM 11)
20-Feb-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2009
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
ELMENDORF AFB AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-09-R-0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Apr-2009 04:00 PM to 09-Apr-2009 04:00 PM.
The following are additional Questions and Answers:
Question 401: My question is in regards to Specification 03-31-29-1.8.1 which calls for the plant that produces this structure to have PCI C-3 Certification. I question whether this is in fact the correct designation for this type of work. As you may be aware, PCI does not actually have a category for concrete floating docks. The typical classification for a product is determined by the type of reinforcing in the product. Classification C-3 is for Pre-Stressed Straight Strand Structural Members. This project, whether bidding the specified or alternate design, is going to be a Pre- Cast Structure with a Post Tensioned Component. There actually isn’t any Pre-Stressing required.
It seems that the proper designation for this product would be C-1 which is for Pre-Cast Concrete Products (No Pre-Stressed Reinforcement). I would respectively request that you consider revising the specification to allow for C-1 Certification.
Answer 401: Please see revised Section 01 19 41, FLOATING BREAKWATER PERFORMANCE
REQUIREMENTS, Paragraph 1.5, QUALITY REQUIREMENTS, which is part of this amendment (AM0004).
The Following Specification Sections Have Been Changed: Replacement pages are attached.
Section 01 19 41, Paragraph 1.5 Added new PCI plant certification requirement for multiple units not post-tensioned at the precast concrete plant Added assembly/post-tensioning plan to requirements for professional engineer stamped design drawings and calculations
(End of Summary of Changes)
AM0004 DOUGLAS HARBOR FLOATING BREAKWATER DGH180942A
DOUGLAS, ALASKA
1.3.8 Transient Moorage Provisions
The floating breakwater shall be provided with rub strips or fenders and bullrails. Materials for these items shall be suitable for the marine environment and shall allow for transient moorage along the full perimeter of the floating breakwater, with the exception of the location of the future ramp.
1.3.9 Floating Breakwater Moorage Requirements
The design of the floating breakwater shall accomodate 20 inch diameter pile pile moorage as shown in the EXHIBIT drawings. Minor variations shall be considered acceptable, however, a proposal for a floating breakwater design requiring a major departure from the mooring scheme shown shall not be accepted.
1.4 DESIGN REQUIREMENTS
The floating breakwater material shall be post-tensioned concrete. The configuration shall be such as to provide a minimum width of 18 feet and a minimum unladen draft of 6.0 feet. The design drawings and calculations shall be stamped by a registered professional engineer. While it is understood that some designs may be proprietary, full disclosure of all calculations required to fully demonstrate the performance and safety of the floating breakwater for all listed environmental and loading conditions is required. Proprietary information will be protected and will not be made available to the public. Calculations shall be presented in a fully coordinated manner allowing a coastal engineer reviewer to readily understand and follow the calculations. Calculation packages submitted which require reviewers to perform parallel calculations to produce numbers or generate understanding shall not be considered acceptable.
1.5 QUALITY REQUIREMENTS
The floating breakwater will be placed in service in a harsh marine environment at Douglas which is adjacent to Juneau Alaska. The corrosion typical of marine environments is present as well as a high number of annual freeze-thaw cycles. The materials selected for use in the floating breakwater shall be such as to provide for a minimum 25-year service life with only minor maintenance. Acceptance of alternate designs shall be dependent on providing documentation of similar structures, in similar environmental conditions, which have been in service for a time period approaching or exceeding 25-years, with a documented record of low maintenance. Alternate designs shall include a minimum of three references of owners or operators of facitities where similar floating breakwaters, in similar environmental conditions, have been in service for a minimum of 15-years. While it is recognized that alternate designs may incorporate casting the breakwater in multiple units, rather than the single unit shown, increasing numbers of units shall be considered a detriment to long term performance, especially as it concerns maintenance. If mulitiple units are incorporated, the units shall be match-cast to ensure that they may be properly assembled and post-tensioned. If multiple units are incorporated and post-tensioning is not accomplished at the precast concrete plant, the precast plant shall be certified by the PCI Plant Certification Program for Category C1 work for casting of floating breakwater modules. PCI Plant quality control program records shall be available for review. If multiple units are not post-tensioned at the precast concrete plant the assembly/post-tensioning plan shall be included as part of the professional engineer's stamped design drawings and
SECTION 01 19 41 Page 3
AM0004 DOUGLAS HARBOR FLOATING BREAKWATER DGH180942A
DOUGLAS, ALASKA
calculations.
1.6 TURN OVER REQUIREMENTS
If assembly after transport is required, the floating breakwater shall be turned over to the City and Borough of Juneau in a fully assembed condition, ready for permanent moorage. Any such field assembly shall be accomplished in compliance with EM 385-1-1.
PART 2 PRODUCTS
2.1 Concrete
Concrete for the floating breakwater shall be as specified in SECTION 03 31 29 MARINE CONCRETE. Relaxation of the PCI Plant Certification requirements shall not be acceptable.
2.2 CONCRETE REINFORCEMENT
Reinforcement shall be coated in accordance with: ASTM A 767/A 767M, including compliance with the recommendations of Appendices X1 and X2; or ASTM A 775/A 775M, including compliance the recommendations of Appendix X2. Where zinc-coated (galvanized reinforcement is used, coating repairs shall be made in accordance with ASTM A 780 zinc rich paint, using power tool cleaning, and to a dry film thickness matching the surrounding coating.
2.3 STRESSING TENDONS AND ACCESSORIES
Concrete post-tensioning strands and accessories shall be as indicated in
SECTION 03 23 00 STEEL STRESSING TENDONS AND ACCESSORIES FOR PRESTRESSED
CONCRETE.
2.4 TIMBER BULLRAILS
If timber is used as the material for the required bullrails, timber bullrails shall meet the requirements of SECTION 06 13 33 PRESERVATIVE
TREATED LUMBER AND TIMBERWORK.
PART 3 EXECUTION - NOT USED
-- End of Section --
SECTION 01 19 41 Page 4
| Specs-DGH180942A-AM0004.pdf |
| 1.5 QUALITY REQUIREMENTS |