Domestic Liquid Phase Epitaxy of Yttrium Iron Garnet Films for Resilient Microwave Filter Supply Chains
Open Pre-Solicitation Posted
- Solicitation number
- DAF27BZ02-DV026
- Agency
-
Air Force Materiel Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Points of contact
-
- Michael Page michael.page.16@us.af.mil
- Michael Newberger michael.newberger.1@us.af.mil
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
About this opportunity
The Department of the Air Force Materiel Command is soliciting proposals under DoD SBIR Phase II topic DAF27BZ02-DV026 for a fully domestic liquid phase epitaxy (LPE) facility to produce yttrium iron garnet (YIG) films, with responses due January 6, 2027. The Set Aside line is Total Small Business. The notice is a pre-solicitation posted November 4, 2026.
The work requires designing, procuring, and commissioning an LPE growth facility that produces device-grade YIG films on gadolinium gallium garnet (GGG) substrates across the 10-150 m thickness range. Required thresholds are film thickness uniformity of 5% across 1-inch wafers, surface roughness below 5 nm RMS, and saturation magnetization (4pMs) within 50 Gauss of specification. Offerors should use a systematic process characterization approach, such as design-of-experiments (DOE), covering flux composition, growth temperature, rotation rate, and cooling profile. The proposed material qualification program must incorporate X-ray diffraction (XRD), profilometry, vibrating sample magnetometry (VSM), and FMR spectroscopy. Qualified films must be suitable for delivery to government-designated filter manufacturers.
The topic is ITAR-controlled (ITAR: Yes) and requires CMMC Level 2 (Self). The notice cites NAICS 541715 and PSC AC12, with Electronics and Sensors technology areas and a Microelectronics focus area. The source states that no domestic LPE-grown YIG production capability currently exists and that the supply chain depends on foreign sources.
Notice text
DoD SBIR topic DAF27BZ02-DV026
Component: USAF
Command: AFMC
Phase: SBIR Program Phase II Action
Technology Areas: Electronics; Sensors
Focus Areas: Microelectronics
Keywords: Yttrium Iron Garnet; YIG; Liquid Phase Epitaxy; LPE
ITAR: Yes
CMMC: Level 2 (Self)
Objective:
The United States Air Force relies on yttrium iron garnet (YIG)-based microwave filters for critical radar, electronic warfare, and communications systems. These components require high-quality YIG epitaxial films in the 10–150 µm thickness range grown by liquid phase epitaxy (LPE). Domestic production capability for LPE-grown YIG films does not currently exist, and the entirety of this supply chain depends on foreign sources — representing a significant vulnerability to Air Force readiness, modernization programs, and long-term system sustainment.
Description:
This topics seeks proposals to design, procure, and commission a fully domestic LPE growth facility capable of producing device-grade YIG films on gadolinium gallium garnet (GGG) substrates across the 10–150 µm thickness range. Efforts shall demonstrate system integration, process optimization, and material qualification sufficient for insertion into operational microwave filter architectures. Required technical performance thresholds include film thickness uniformity of ±5% across 1-inch wafers, surface roughness below 5 nm RMS, and saturation magnetization (4πMs) values within ±50 Gauss of specification. Offerors shall employ a systematic process characterization approach — such as design-of-experiments (DOE) methodology — to establish repeatable, production-ready growth processes governing flux composition, growth temperature, rotation rate, and cooling profile.Proposed solutions shall include a structured material qualification program incorporating X-ray diffraction (XRD), profilometry, vibrating sample magnetometry (VSM), and FMR spectroscopy. Qualified films shall be suitable for delivery to government-designated filter manufacturers and laboratories for device-level insertion and performance verification.Successful Phase II performance shall result in a domestic LPE production capability with documented process controls, material qualification data packages, and a clear transition roadmap to Phase III commercialization and direct supply to DoW prime contractors. This topic directly supports the AFRL strategic priority of eliminating foreign single-source dependencies for critical electronic materials and establishing a sovereign U.S. industrial base for high-performance garnet magnetic films.
Phase I:
This topic is intended for a technology proven ready to move directly into a Phase II program. A Phase I SBIR award will not be made. The offeror is required to provide details and documentation in the Direct to Phase II (D2P2) proposal which demonstrates accomplishments of a 'Phase I-like' effort, including demonstrating the expertise needed to grow, characterize, and qualify device-grade magnetic garnet epitaxial films. The offeror should have demonstrated experience with liquid phase epitaxy (LPE) or a comparable epitaxial growth method for yttrium iron garnet (YIG) or related magnetic garnet films on gadolinium gallium garnet (GGG) substrates, and should be able to show prior films characterized for crystalline quality, thickness, surface roughness, saturation magnetization, and ferromagnetic resonance (FMR) linewidth. Demonstration of prior films approaching device-grade quality - low FMR linewidth, good thickness uniformity, and low surface roughness - is desired, as is evidence of a systematic process characterization approach (such as design-of-experiments methodology) governing flux composition, growth temperature, rotation rate, and cooling profile. The offeror should also demonstrate an understanding of the material qualification tools required for device insertion, including X-ray diffraction (XRD), profilometry, vibrating sample magnetometry (VSM), and FMR spectroscopy. The proposal should illustrate past success at the aforementioned activities with magnetic garnet or comparable single-crystal oxide film technologies fitting the above descriptions, sufficient to substantiate that the small business is positioned to design, commission, and operate a domestic LPE production capability without a preceding Phase I effort.
Phase II:
The desired outcome of this topic is a domestic liquid phase epitaxy (LPE) production capability for device-grade yttrium iron garnet (YIG) films grown on gadolinium gallium garnet (GGG) substrates across the 10-150 um thickness range. During Phase II, the offeror shall design, procure, and commission the LPE growth system and supporting infrastructure, and shall demonstrate system integration, process optimization, and material qualification sufficient for insertion into operational microwave filter architectures. The effort shall establish repeatable, production-ready growth processes using a systematic process characterization approach, such as design-of-experiments (DOE) methodology, governing flux composition, growth temperature, rotation rate, and cooling profile. Required technical performance thresholds for qualified films include film thickness uniformity of +/-5% across 1-inch wafers, surface roughness below 5 nm RMS, and saturation magnetization (4-pi-Ms) values within +/-50 Gauss of specification. The offeror shall implement a structured material qualification program incorporating X-ray diffraction (XRD), profilometry, vibrating sample magnetometry (VSM), and FMR spectroscopy, and shall produce documented process controls and material qualification data packages. Qualified films shall be suitable for delivery to government-designated filter manufacturers and laboratories for device-level insertion and performance verification. Successful Phase II performance shall result in a domestic LPE production capability with documented process controls, material qualification data packages, demonstrated repeatability across multiple growth runs, and a clear transition roadmap to Phase III commercialization and direct supply to DoW prime contractors. The minimum acceptable deliverables are: a commissioned and operational LPE growth capability; a documented, repeatable growth process; a material qualification data package demonstrating films meeting the threshold metrics above; and delivery of qualified sample films to government-designated recipients. This effort is expected to advance the domestic-production capability from approximately TRL 3-4 at project start to TRL 5/6 at the end of Phase II.
Phase III:
Phase III is accomplished when the DoD/DoW and/or commercial applications of this SBIR-funded R&D are developed using non-SBIR/STTR funds. The most direct military application is the supply of domestically produced, device-grade LPE-grown YIG films to manufacturers of YIG-based microwave filters, oscillators, resonators, and related ferrite components used in Air Force and DoW radar, electronic warfare (EW), signals intelligence (SigInt), and communications systems. These films are an enabling material for tunable and fixed microwave filter architectures - including the wide pass bandwidth, high selectivity, continuously tunable notch filters needed to protect wideband receivers from large interferers - and a sovereign supply directly reduces a critical single-source foreign dependency. Additional DAF and DoW transition opportunities include YIG-tuned oscillators for spectrum analyzers and frequency-agile sources, magnetically tunable preselectors and delay lines for wideband receivers, and non-reciprocal devices such as circulators and isolators used across airborne, ground, and space-based RF systems. Potential commercial applications include test and measurement instrumentation (spectrum analyzers and signal generators), commercial communications and SATCOM hardware, spectrum-monitoring equipment, and emerging magnonic and spintronic device research, all of which depend on low-loss single-crystal garnet films. The expected Phase III effort would advance the domestic production capability from its Phase II exit point of TRL 5/6 toward TRL 7 and beyond by scaling the LPE process to sustained production quantities, qualifying the films and process to applicable industry and military quality standards, establishing screening and lot-acceptance procedures, and integrating qualified films into fielded microwave component product lines. Transition planning anticipates direct supply agreements with DoW prime contractors and established YIG component manufacturers, with the small business operating as a qualified domestic material source. Known government activities that may be required prior to broad adoption include security and export-control (ITAR) determination, material and process qualification by government-designated filter manufacturers and laboratories, and any platform- or program-specific component qualification associated with the receiving systems. Early engagement with AFRL, DAF program offices, and DoW prime contractors during Phase II is recommended to identify committed transition partners and to align film specifications with the requirements of targeted filter and component architectures.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Wide Pass Bandwidth, High Selectivity, Continuously Tunable Notch Filters | Air Force Materiel Command | Total Small Business | |
| Wafer-scale low-loss hyperbolic optical material | Office of the Secretary of Defense | Total Small Business | |
| Domestic Fabrication Of High-Purity Precursor Materials For Advanced Radiation Detection Scintillator Crystals | Defense Threat Reduction Agency | Total Small Business | |
| Domestic Scalable Growth Of Large-Format Pixelated CZT Crystals For Advanced Radiation Detection | Defense Threat Reduction Agency | Total Small Business | |
| US Production of Ultra-High Temperature Ceramic-Yielding Preceramic Polymers | Air Force Materiel Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity