Dillon Dam, Intake Roof Replacement
Closed Solicitation Posted
- Solicitation number
- W9123725QA051
- Agency
- ENDIST Huntington US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- US Army Corps of Engineers, 4969 Dillon Dam Rd, Zanesville, OH 43701 43701
- Points of contact
-
- Katrina Lazare katrina.d.lazare@usace.army.mil (304) 399-5183
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Huntington District is procuring complete membrane roof replacement services for the Dillon Dam intake structure. The contractor must remove the existing membrane roof and install a new membrane roof system with a minimum 20-year warranty and zero-leak guarantee, along with all necessary flashing for proper waterproofing around roof penetrations. The scope includes providing all tools, equipment, labor, and materials needed to complete the project, relocating ballast for reuse after installation, and removing all waste materials from the site while maintaining access for government workers to perform intake operations and maintenance. The contractor must keep the work area clean and organized throughout the project duration. Proposals are due by September 3, 2025, with the solicitation posted on August 21, 2025, allowing approximately two weeks for response preparation.
This opportunity is designated as a Total Small Business set-aside under NAICS code 238160 for Roofing Contractors. The work will be performed at the Dillon Dam facility located at 4969 Dillon Dam Road in Zanesville, Ohio. The roof area is estimated at approximately 75 feet by 38 feet, though the solicitation recommends a site visit to confirm exact measurements. No incumbent contractor or specific award value is mentioned in the solicitation notice. The project timeline and duration are not specified beyond the requirement for the contractor to maintain site access for ongoing government operations during construction.
Notice text
The contractor shall remove existing membrane roof, supply and install new membrane roof. New roof must have 20-year (minimum) warranty and have no leaks. All flashing needed is also to be supplied by contractor to ensure any roof penetrations are also flashed correctly, not allowing any water to enter the intake structure. Roof is an estimated 75? by 38?, a site visit is suggested to confirm measurement. All trash and waste will be removed from site by the contractor. The contractor shall keep the site/ work area neat and ensure govt workers have access to intake for needed gate operations or maintenance tasks. The Contractor is to provide all tools, equipment, labor and materials to complete the job. Relocate Ballast so it can be reused after new membrane roof is installed. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity