Design Build Construction of JPRA Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DW20R0032
- Agency
-
ENDIST Seattle
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Spokane Wa Usa
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Seattle District seeks to procure design and construction services for a two-phase project through a competitive solicitation. Phase one involves the submission of technical proposals by May 11, 2020 to design and construct a Joint Personnel Recovery Agency Command/Control Mission Support Facility. This will include a two-story, approximately 2,781 square meter facility located at the White Bluff Site near Fairchild Air Force Base in Washington that meets high-performance building standards and receives third-party sustainability certification. Phase two will involve negotiations with selected offerors.
There is no set-aside designation for this opportunity. The project is estimated to cost $12.4 million and shall be completed within 720 calendar days of notice to proceed. The NAICS code is 237910 for site preparation contractors and the PSC code covers general construction of buildings. The place of performance is Spokane, Washington. Funds have not been appropriated and no award will be made until such funding is received by the Army Corps of Engineers.
Notice text
4 versions
Update #4 · Latest ·
Two Phase Design-Build Construction of a Joint Personnel Recovery Agency (JPRA) Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA.
This is an Unrestricted procurement.
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for the design and construction of a multi-level Command and Control Mission Support Facility of approximately 2781 square meters located at the Department of Defense’s White Bluff Installation, also known as JPRA West. White Bluff is approximately 9 miles north-east of Fairchild Air Force Base, Washington. Building will require High Performance and Sustainable Building Guiding Principles Compliance (HPSB). HPSB GPC third party certification using either US Green Building Council (USGBC) or Green Building Initiative (GBI). The facility will have concrete masonry veneer exterior and insulated metal roof, and be outfitted with automatic fire sprinklers, mass notification and alarm systems, and infrastructure for intrusion detection for connection to the Installation. All associated infrastructure (including cybersecurity) and pavement necessary for the building, its access, and occupant parking are included as part of this project. This project also includes a new access control features into the White Bluff Site, with control gate and Security Check House of approximately 93 square meters , as well as partial demolition of existing buildings totaling approximately 153 square meters.
See Attached Request for Proposal (RFP) W912DW20R0032 for Phase 1.
Amendment 0001 is issued 22 April 2020.
Amendment 0002 is issued 6 May 2020.
Amendment 0003 is issued 7 May 2020.
Update #3 ·
Two Phase Design-Build Construction of a Joint Personnel Recovery Agency (JPRA) Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA.
This is an Unrestricted procurement.
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for the design and construction of a multi-level Command and Control Mission Support Facility of approximately 2781 square meters located at the Department of Defense’s White Bluff Installation, also known as JPRA West. White Bluff is approximately 9 miles north-east of Fairchild Air Force Base, Washington. Building will require High Performance and Sustainable Building Guiding Principles Compliance (HPSB). HPSB GPC third party certification using either US Green Building Council (USGBC) or Green Building Initiative (GBI). The facility will have concrete masonry veneer exterior and insulated metal roof, and be outfitted with automatic fire sprinklers, mass notification and alarm systems, and infrastructure for intrusion detection for connection to the Installation. All associated infrastructure (including cybersecurity) and pavement necessary for the building, its access, and occupant parking are included as part of this project. This project also includes a new access control features into the White Bluff Site, with control gate and Security Check House of approximately 93 square meters , as well as partial demolition of existing buildings totaling approximately 153 square meters.
See Attached Request for Proposal (RFP) W912DW20R0032 for Phase 1.
Amendment 0001 is issued 22 April 2020.
Amendment 0002 is issued 6 May 2020.
Update #2 ·
Two Phase Design-Build Construction of a Joint Personnel Recovery Agency (JPRA) Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA.
This is an Unrestricted procurement.
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for the design and construction of a multi-level Command and Control Mission Support Facility of approximately 2781 square meters located at the Department of Defense’s White Bluff Installation, also known as JPRA West. White Bluff is approximately 9 miles north-east of Fairchild Air Force Base, Washington. Building will require High Performance and Sustainable Building Guiding Principles Compliance (HPSB). HPSB GPC third party certification using either US Green Building Council (USGBC) or Green Building Initiative (GBI). The facility will have concrete masonry veneer exterior and insulated metal roof, and be outfitted with automatic fire sprinklers, mass notification and alarm systems, and infrastructure for intrusion detection for connection to the Installation. All associated infrastructure (including cybersecurity) and pavement necessary for the building, its access, and occupant parking are included as part of this project. This project also includes a new access control features into the White Bluff Site, with control gate and Security Check House of approximately 93 square meters , as well as partial demolition of existing buildings totaling approximately 153 square meters.
See Attached Request for Proposal (RFP) W912DW20R0032 for Phase 1.
Amendment 0001 is issued 22 April 2020.
Update #1 ·
Two Phase Design-Build Construction of a Joint Personnel Recovery Agency (JPRA) Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA.
This is an Unrestricted procurement.
The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for the design and construction of a multi-level Command and Control Mission Support Facility of approximately 2781 square meters located at the Department of Defense’s White Bluff Installation, also known as JPRA West. White Bluff is approximately 9 miles north-east of Fairchild Air Force Base, Washington. Building will require High Performance and Sustainable Building Guiding Principles Compliance (HPSB). HPSB GPC third party certification using either US Green Building Council (USGBC) or Green Building Initiative (GBI). The facility will have concrete masonry veneer exterior and insulated metal roof, and be outfitted with automatic fire sprinklers, mass notification and alarm systems, and infrastructure for intrusion detection for connection to the Installation. All associated infrastructure (including cybersecurity) and pavement necessary for the building, its access, and occupant parking are included as part of this project. This project also includes a new access control features into the White Bluff Site, with control gate and Security Check House of approximately 93 square meters , as well as partial demolition of existing buildings totaling approximately 153 square meters.
See Attached Request for Proposal (RFP) W912DW20R0032 for Phase 1.
Files
| File | Type | Posted |
|---|---|---|
| Phase1_Amend 3_W912DW20R0032.pdf | ||
| Phase 1Amend 2_W912DW20R0032.pdf | ||
| PH 1 Amend 0001_W912DW20R0032.pdf | ||
| RFP_Phase1_W912DW20R0032_Final.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design Build Construction of JPRA Command/Control Mission Support Facility, Fairchild AFB (White Bluff Site), WA | Award Notice | |
| This notice | Solicitation | |
| Design-Build Construction of JPRA CCMSF | Pre-Solicitation | |
| Design-Build Construction of JPRA CCMSF | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224 | ENDIST Seattle | Total Small Business | |
| Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222 | ENDIST Seattle | Total Small Business | |
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT | ENDIST Wilmington | No set-aside | |
| RFI: Fort Wolters H Barracks | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity