Design-Build Construction of ARS/WSU Plant Bioscience Research Facility, Pullman, WA

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W912DW22R0015
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Pullman, Washington 99163, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Seattle District is soliciting design-build proposals for the construction of a new ARS/WSU Plant Biosciences Research Building on the campus of Washington State University in Pullman, Washington. Interested firms must submit Phase 1 proposals by May 5, 2022 to be evaluated based on their specialized experience, past performance, and technical approach. Up to five offerors will be shortlisted to submit Phase 2 proposals including pricing, with award of a firm fixed-price contract to the responsible offeror determined to represent the best overall value to the government. The project must meet goals for LEED Silver certification as well as energy efficiency and sustainability standards.

There is no set-aside designated for this procurement. The project involves the construction of a new 113,703 square foot research facility to house approximately 320 researchers and students. Proposals are due by May 5, 2022 and award will be made based on best value. The place of performance is Pullman, Washington and the project is subject to a cost ceiling of $89 million for design and construction services.

Notice text

The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure design and construction services for a new ARS/WSU Plant Biosciences Research Building (PBRB), located on the Washington State University (WSU) campus, within the Research Education Complex (REC). The site is approximately 2.5 acres and will be developed with supporting infrastructure utilities, paved surfaces, site lighting and landscaped areas. The building will be a maximum 113,703 GSF (per calculations as outlined in UFC 3-101-02) and shall provide research and office space representing a diverse mix of disciplines, programs, and groups of approximately 320 researchers and students. The building provides key connections within the REC complex with a direct connection to the Vogel Plant Sciences building to the west, providing office space for researchers with labs in Vogel.  

The U.S. Department of Agriculture (USDA) Agricultural Research Service (ARS) and Washington State University (WSU) have a long-standing history of joint research dating back to 1931 which has been noted as one of the strongest federal-state partnerships in the nation. The research partnership is segregated by research units which study 1) animal diseases and vaccine development; 2) plant genetics, breeding, genomics, physiology, and disease; 3) grain quality; 4) soil health, conservation, and erosion; 5) long-term agroecosystems research (LTAR); and 6) plant germplasm collection, testing and preservation. 

The new ARS/WSU Plant Biosciences Research Building (PBRB) shall foster and enhance connectedness and provide state-of-the-art research space supporting further collaboration. The PBRB is also referred to as REC3 in the WSU and REC Complex masterplans. Research programs include Hatch Projects (HP) which are comprised of both ARS and WSU scientists with each researcher focusing on a different part of a common research goal. The laboratories required to support the important research missions range from typical Micro/Molecular Biology laboratories to Plant/Soil focused laboratories and other specific research-focused labs as well as many proposed shared research support laboratories. The laboratories are designed utilizing a Laboratory Typology Approach which utilizes a flexible and modular approach to allow space to change and adapt with the needs of the research groups over time. The adjacent Vogel and Plant Sciences buildings (REC5) must remain operational during construction with limited impact to existing building occupants where demolition is required to achieve the desired building connections. 

The project is projected to achieve the goals outlined by the ARS Policy and Procedure for Energy, Water and Sustainability, achieve minimum LEED Silver certification, respond to the Washington Energy Executive Order 20-01 for state efficiency and environmental performance and provide a healthy environment for all building occupants. 

The project is subject to a cost ceiling of $89,000,000 for design and construction. 

Responses to Phase 1 Solicitation responses are due by 10:00AM (Pacific Time) on 5 May 2022. Responses to Phase 1 Solicitation will ONLY be received electronically by email.  Please refer to attached Solicitation for more information.

Files

File Type Posted
W912DW22R0015_PHASE 1 SOLIC_1Apr2022_.pdf PDF

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors