Special Notice- Industry Day -for Design-Build Construction of ARS/WSU Plant Bioscience Research Building
Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912DW22R0LFP-IndustryDay
- Agency
-
ENDIST Seattle
US Army Corps of Engineers, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Pullman, Washington 99163, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Special Notice announced a virtual Industry Day event on December 7, 2021 hosted by the U.S. Army Corps of Engineers Seattle District to provide an overview of the upcoming design-build construction requirement for an Agricultural Research Service and Washington State University Plant Bioscience Research Building. The anticipated acquisition is a firm-fixed price design-build contract with an estimated value between $25-100 million.
The Industry Day event will inform contractors about the project requirement and acquisition strategy which includes a tentative solicitation release date of February 2022. The project scope involves the construction of a new approximately 100,000 gross square foot research facility on the WSU campus in Pullman, Washington to provide joint laboratory and office space for plant bioscience research. All interested contractors must register via the provided link to receive login information for the webinar. Eligible contractors will have the opportunity to learn about the project details and share any observations or concerns with the agency during the event.
Notice text
SPECIAL NOTICE: INDUSTRY DAY
The U.S. Army Corps of Engineers, Northwestern Division (CENWD) – Seattle District (CENWS) conducting a VIRTUAL Industry Day event for an upcoming project requirement Design-Build (DB) Agricultural Research Service (ARS) Plant Biosciences Research Building Washington State University (WSU) at Pullman, Washington on Tuesday, 7 December 2021, from 0900 AM to 1200 PM (Pacific Standard Time (PST)).
The U.S. Army Corps of Engineers Seattle District intends to collaborate with industry as we prepare the acquisition plan and solicitation for a Plant Bioscience Research Building project on the Washington State University Pullman Campus.
The purpose of the virtual event is for the Government to provide an update and overview of ARS Plant Biosciences Research Building requirement. We understand the importance to the construction industry to have advance knowledge of the project, and we welcome industry’s participation and input in the development of the requirement’s acquisition plan.
The webinar will take approximately one-hour where the Government will present information and invite industry to share observations and concerns. The anticipated acquisition strategy is a firm-fixed price type contract Design-Build project with a tentative solicitation publication of February 2022.
Requirement Information:
NAICS Code: 236220 – Commercial and Institutional Building Construction, with a small business size standard of $39.5 million.
Recovery Act? No
PROJECT SYNOPSIS:
DB construction of a new ~105,000GSF Research Facility on the WSU campus. The new facility will provide joint ARS and WSU laboratory and office space for plant biosciences for the U.S. Department of Agriculture/ARS. The proposed project will be a firm fixed-price construction project. The magnitude of the construction project is between $25 million and $100 million (Construction Cost Limitation $90 million). For this potential project, 100 percent payment and performance bonds will be required.
Key considerations include connection to the existing Vogel Plant Biosciences Building which has laboratory but no office space for ARS and WSU scientists. Inclusion of additional offices to support ARS scientists with labs, but no offices, in the Vogel building is critical. Connection to the Research and Education Complex (REC) Spine which includes collaborative space, loading docks and utility connections.
The new facility will provide joint ARS and WSU laboratory and office space for plant biosciences. The project site selected, in accordance with the WSU Research and Education Complex (REC) master plan, is located on the WSU campus. The A-E will register the design for third-party certification using either the U.S. Green Building Council or Green Building Initiative.
Industry Day event registration:
https://us02web.zoom.us/webinar/register/WN_8B60CLOTTOCzvFsSNsd50Q
ALL INTERESTED PARTICIPANTS MUST REGISTER VIA REGISTRATION LINK PROVIDED IN ORDER TO RECEIVE EMAIL INFORMATION FOR WEBINAR ACCESS.
Files
| File | Type | Posted |
|---|---|---|
| Flyer Industry Day ARS-WSU Plant Bio Lab DB Const W912DW22R0LFP.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mueller Cast Iron Screwed End Y Strainers | Special Notice | |
| Emerson Kunkle Safety Valve | Special Notice | |
| Design-Build Construction of ARS/WSU Plant Bioscience Research Facility, Washington State University Campus, Pullman, WA | Award Notice | |
| Lenel Intrusion Detection System | Pre-Solicitation | |
| Design-Build Construction of ARS/WSU Plant Bioscience Research Facility, Pullman, WA | Solicitation | |
| Design-Build Construction of ARS/WSU Plant Bioscience Research Facility, Pullman, WA | Pre-Solicitation | |
| Special Notice-Industry Day Results-for W912DW22R0LFP-DB Construction of ARS/WSU Plant Bioscience Research Building | Special Notice | |
| This notice | Special Notice | |
| Design-Build Construction of ARS/WSU Plant Bioscience Research Building | Special Notice | |
| Design-Build Construction of ARS/WSU Plant Bioscience Research Building | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity