DDJC Various Tracy Paving
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123824B0005
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Points of contact
-
- Jessica Padilla jessica.padilla@usace.army.mil (916) 557-6783
- Julie Maxwell julie.maxwell@usace.army.mil (916) 557-7989
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Sacramento District is seeking contractors to repair and replace pavement at various locations within the Defense Distribution Depot in San Joaquin, California. The project involves expanding the parking lot east of Warehouse 30, removing and replacing the parking lot at Building 38, the loading/unloading area at Building 72, pavement west of the C Street and 4th Street intersection, and installing concrete trailer landing gear bearing strips west of Warehouse 29. The design for all projects must meet applicable codes, standards, and specifications. Offers are due by May 14, 2024.
This solicitation is set aside for HUBZone small businesses. Based on the Abstract of Offers, two offerors submitted proposals - Vet Con Souza a JV and West Point Contractors Inc. The government estimate for the work is $2,897,875. The contract items include removing and replacing pavement, parking lots, and loading/unloading areas, with estimated quantities ranging from 210 to 57,705 square feet and unit prices between $21.00 and $362.00 per unit. All work will be performed at the Defense Distribution Depot in San Joaquin, California.
Notice text
9 versions
Update #9 · Latest ·
**05 June 2024 - Uploaded revised Abstract of Offers page 1 of 2 to reflect IGE amounts. The units costs for the IGE reflected are not precise therefore the line item totals for the IGE that end in ".99" are off by one (1) cent. The actual line item totals for those line items are one (1) cent more than displayed.
**15 May 2024 - This notice provides the bid abstracts from the 14 May 2024 bid opening**
** The purpose of solicitation amendment 0005 is to update Attachment 6 - DBA Construction Wage Rates. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number*** The purposes of solicitation amendment 0004 are to extend the offer due date to 14 May 2024 and extend the period of performance of the requirement to 240 days. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number.* ** The purpose of solicitation amendment 0003 is to update Attachment 6 - DBA Construction Wage Rates and extend offer due date to 13 May 2024****The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #8 ·
**15 May 2024 - This notice provides the bid abstracts from the 14 May 2024 bid opening**
** The purpose of solicitation amendment 0005 is to update Attachment 6 - DBA Construction Wage Rates. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number*** The purposes of solicitation amendment 0004 are to extend the offer due date to 14 May 2024 and extend the period of performance of the requirement to 240 days. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number.* ** The purpose of solicitation amendment 0003 is to update Attachment 6 - DBA Construction Wage Rates and extend offer due date to 13 May 2024****The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #7 ·
** The purpose of solicitation amendment 0005 is to update Attachment 6 - DBA Construction Wage Rates. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number*** The purposes of solicitation amendment 0004 are to extend the offer due date to 14 May 2024 and extend the period of performance of the requirement to 240 days. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number.* ** The purpose of solicitation amendment 0003 is to update Attachment 6 - DBA Construction Wage Rates and extend offer due date to 13 May 2024****The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #6 ·
* The purposes of solicitation amendment 0004 are to extend the offer due date to 14 May 2024 and extend the period of performance of the requirement to 240 days. Please use the link here to view amendments: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml then hit the search button located in the top left of the screen and enter the solicitation number.* ** The purpose of solicitation amendment 0003 is to update Attachment 6 - DBA Construction Wage Rates and extend offer due date to 13 May 2024****The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #5 ·
** The purpose of solicitation amendment 0003 is to update Attachment 6 - DBA Construction Wage Rates and extend offer due date to 13 May 2024****The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #4 ·
**The purpose of solicitation amendment 0002 is to revise Attachment 4 - DDJC Entry Instructions to include accurate link to DBIDS Pre-Enrollment Portal. Due to PIEE system error please use this link: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml to view this solicitation amendment.**The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #3 ·
** Due to an external PIEE error please view amendment and amendment documents using the link here: https://piee.eb.mil/sol/xhtml/unauth/index.xhtml. ** **The purpose of solicitation amendment 0001 is add revised Attachment 4 - DDJC Entry Instructions and add Attachment 8 - Tracy DBIDS Contractor Pre-Registration**.The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #2 ·
**The purpose of solicitation amendment 0001 is add revised Attachment 4 - DDJC Entry Instructions and add Attachment 8 - Tracy DBIDS Contractor Pre-Registration**.The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Update #1 ·
The purpose of this project is to repair and replace pavement base wide by providing a design and constructing an expanded parking lot East of Warehouse 30, remove and replace the parking lot at Building 38, remove and replace the loading/unloading area at Building 72, remove and replace the pavement west of the intersection of C street and 4th street, install concrete trailer landing gear bearing strips west of Warehouse 29 at the Defense Distribution Depot, San Joaquin. The design for all projects shall meet all applicable codes, standards, and specifications.
Attachments
| File | Type | Posted |
|---|---|---|
| Abstract of Offers_1419_ page 1 of 2_revised.pdf | ||
| Abstract of Offers -OF_1419_ page 1 of 2_signed.pdf | ||
| Abstract of Offers -OF_1419A_page 2 of 2.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| DDJC Various Tracy Paving | Award Notice | |
| DDJC Various Tracy Paving | Solicitation | |
| DDJC Tracy Various Paving | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity