Dark Fiber
Closed Solicitation Posted
- Solicitation number
- F2B0BB0164AW0100000
- Agency
-
AFLCMC Hanscom AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541519 Other Computer Related Services
- Place of performance
- Hanscom Afb Ma 01731 USA
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
**8/7/2020 UPDATED COMBO**
The Contractor shall lease existing dark fiber, 2-strand, single mode fiber owned by Crown Castle Fiber that provides connectivity between the demarcation point for Hanscom AFB, Bldg. 1646A, and the demarcation point for MITRE Corporation, Building D (main distribution frame room), 202 Burlington Road, Bedford, MA. The Period of Performance is for one year of service with 4, one year option periods. The fiber transport connection must be terminated at both demarcation points. The Contractor shall maintain connectivity as described below throughout the contract’s
entire Period of Performance.
Update #2 ·
**8/6/2020 UPDATED COMBO**
The Contractor shall lease existing dark fiber, 2-strand, single mode fiber owned by Crown Castle Fiber that provides connectivity between the demarcation point for Hanscom AFB, Bldg. 1646A, and the demarcation point for MITRE Corporation, Building D (main distribution frame room), 202 Burlington Road, Bedford, MA. The Period of Performance is for one year of service with 4, one year option periods. The fiber transport connection must be terminated at both demarcation points. The Contractor shall maintain connectivity as described below throughout the contract’s
entire Period of Performance.
Update #1 ·
The Contractor shall lease existing dark fiber, 2-strand, single mode fiber owned by Crown Castle Fiber that provides connectivity between the demarcation point for Hanscom AFB, Bldg. 1646A, and the demarcation point for MITRE Corporation, Building D (main distribution frame room), 202 Burlington Road, Bedford, MA. The Period of Performance is for one year of service with 4, one year option periods. The fiber transport connection must be terminated at both demarcation points. The Contractor shall maintain connectivity as described below throughout the contract’s
entire Period of Performance.
Files
| File | Type | Posted |
|---|---|---|
| v2 Combined Synopsis Solicitation Dark Fiber.docx | DOCX document | |
| v1 Combined Synopsis Solicitation Dark Fiber.docx | DOCX document | |
| Dark Fiber QA.xlsx | XLSX spreadsheet | |
| v0 Combined Synopsis Solicitation Dark Fiber.docx | DOCX document | |
| FY20_Dark Fiber SOW Mitre and Hanscom Revised 15 Jul 20.pdf | ||
| Dark Fiber Bid Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity