Dallas Firing Range Services
Closed Solicitation Posted
- Solicitation number
- 70T05025Q6115N004
- Agency
-
Transportation Security Administration
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 713990 All Other Amusement and Recreation Industries
- Place of performance
- Texas 75019, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Transportation Security Administration (TSA) is seeking to procure firing range services in the Dallas area through solicitation 70T05025Q6115N004_0004, requiring the use and rental of an existing indoor firearms range facility. The range must be located within a 17-mile radius of Airline Drive and Freeport Parkway in Coppell, Texas, and meet extensive operational requirements including 10 firing points, mechanical target systems, capabilities for various firearms and ammunition types, low-light training accommodations, and compliance with OSHA, ATF, EPA, and NIOSH regulations. The facility must also provide restroom facilities, parking for 25 vehicles, storage areas, CCTV security systems, and maintain appropriate ventilation and fire suppression equipment. The procurement will utilize a Lowest Price Technically Acceptable (LPTA) evaluation process, assessing quotes on technical acceptability, past performance, and price reasonableness. The current solicitation requires quotes to be submitted by September 22, 2025, at 1:00 PM Eastern Time, though this solicitation has undergone multiple amendments and cancellations throughout its procurement history.
This opportunity is designated as a small business set-aside under NAICS code 713990 (All Other Amusement and Recreation Industries) with a size standard of $9 million, and recent amendments indicate it may also qualify as a Women-Owned Small Business (WOSB) set-aside. The government documents reference that this contract is intended to replace an expired previous contract (70T05021P6115N003), though no specific incumbent contractor is identified. DHS anticipates using the range facility for approximately 104 days annually, with 10 personnel conducting training twice weekly on Wednesdays and Thursdays from 8:00-11:00 AM, totaling approximately 312 annual range hours and firing approximately 24,000 rounds quarterly. The contract structure includes a base year with four option years, and the government will provide ammunition, targets, and firearms instructors while requiring the contractor to maintain strict confidentiality through a Non-Disclosure Agreement. Performance will take place at the contractor's facility in the Dallas-Coppell area, with the contractor responsible for meeting all operational and safety requirements at their established indoor firing range.
Notice text
6 versions
Update #6 · Latest ·
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004_0004 The solicitation is issued as a request for quotation (RFQ).
(iii) All quotes must be submitted to the above email no later than September 22, 2025 at 1:00 pm (noon) Eastern Time.
(iv) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(v) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the SF1449 Section II for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis
-Subcontractor Agreement if Applicable
Update #5 ·
THIS SOLICITATION IS CANCLLLED.
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004_0003 The solicitation is issued as a request for quotation (RFQ).
(iii) All questions must be submitted via email to Delisa Hawkins at Delisa.Hawkins@tsa.dhs.gov no later than June 10, 2025 at 1:00 pm. (noon) Eastern Time.
(iv) All quotes must be submitted to the above email no later than June 13, 2025 at 1:00 pm (noon) Eastern Time.
(v) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(vi) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the SF1449 Section II for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis
-Subcontractor Agreement if Applicable
Update #4 ·
THIS SOLICITATION IS CANCLLLED.
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004_0001 The solicitation is issued as a request for quotation (RFQ).
(iii) All questions must be submitted via email to Delisa Hawkins at Delisa.Hawkins@tsa.dhs.gov no later than May 2, 2025 at 1:00 pm. (noon) Eastern Time.
(iv) All quotes must be submitted to the above email no later than May 9, 2025 at 1:00 pm (noon) Eastern Time.
(v) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(vi) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the SF1449 Section II for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis
-Subcontractor Agreement if Applicable
Update #3 ·
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004_0001 The solicitation is issued as a request for quotation (RFQ).
(iii) All questions must be submitted via email to Delisa Hawkins at Delisa.Hawkins@tsa.dhs.gov no later than May 2, 2025 at 1:00 pm. (noon) Eastern Time.
(iv) All quotes must be submitted to the above email no later than May 9, 2025 at 1:00 pm (noon) Eastern Time.
(v) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(vi) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the SF1449 Section II for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis
-Subcontractor Agreement if Applicable
Update #2 ·
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004. The solicitation is issued as a request for quotation (RFQ).
(iii) All questions must be submitted via email to Delisa Hawkins at Delisa.Hawkins@tsa.dhs.gov no later than April 18, 2025 at 4:00 pm. (noon) Eastern Time.
(iv) All quotes must be submitted to the above email no later than April 25, 2025 at 4:00 pm (noon) Eastern Time.
(v) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(vi) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the SF1449 Section II for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis
-Subcontractor Agreement if Applicable
Update #1 ·
In accordance with Federal Acquisition Regulation (FAR) 4.1102 quoters are required to be registered in the System for Award Management (SAM) at the time an offer or quotation is submitted.
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
(ii) The solicitation number is70T05025Q6115N004. The solicitation is issued as a request for quotation (RFQ).
(iii) All questions must be submitted via email to Delisa Hawkins at Delisa.Hawkins@tsa.dhs.gov no later than April 18, 2025 at 4:00 pm. (noon) Eastern Time.
(iv) All quotes must be submitted to the above email no later than April 22, 2025 at 4:00 pm (noon) Eastern Time.
(v) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03.
(vi) This acquisition is issued as a small business set aside. The associated NAICS code is 713990 with a small business size standard of $9M.
(vii) Description of requirements for the items to be acquired: Use/rental of an existing/established firing range. See attached Statement of Work for specific requirements for an acceptable firing range.
(ix) Delivery, acceptance, and FOB point are at the contractor's facility.
The evaluation procedures to be used are as follows:
Award will be made using the lowest price technically acceptable (LPTA) selection process. Award may be made on initial quotations. Therefore, each initial quote should contain the quoter's best terms from a technical, all submission requirements and price standpoint. However, the Government reserves the right to contact quoters if it is later determined by the contracting officer to be necessary or in the government's best interests. The LPTA process will proceed as follows:
1) Quotes may be removed from consideration for, but not limited to, the following reasons:
•Quotes that are not received timely
• Quotes that fail to follow the instructions in FAR Provision 52.212-1
• Quotes that fail to submit ALL required documentation/provisions
• Quotes that have language inconsistent with the terms and conditions set forth in the solicitation
2) Quotes will be ordered by price from lowest to highest.
3) The Government will then review Factor 1 of the lowest priced quote. If the review finds that Factor 1 of the lowest priced quote is acceptable, the Government will then evaluate Factor 2 of the lowest priced quote. If the review finds that Factor 2 of the lowest priced quote is acceptable, that quote represents the best value to the Government and the technical evaluation process stops at this point. Contingent upon a subsequent determination of price reasonableness (Factor 3) and of contractor responsibility by the Contracting Officer, an award will be made to that quoter without further consideration of any other quoters.
If the lowest quote is determined not to be acceptable for any reason, then the next lowest priced quote will receive an evaluation as described above. The process will continue in order by price until a quote from a responsible contractor is determined to be acceptable and priced fairly and reasonably.
4) USING THIS PROCEDURE, THE GOVERNMENT MAY NOT EVALUATE ALL QUOTES.
(e) Each Factor will be evaluated as follows:
Factor 1. Technical Acceptability
Technical Acceptability will be rated on an "acceptable" or "unacceptable" basis as follows: Acceptable - The quoted range meets all technical criterion stated in the Statement of Work.
Unacceptable - The quoted range does not meet all technical criterion stated in the Statement of Work.
Factor 2. Past Performance
Past performance will be rated on an "acceptable" or "unacceptable" basis as follows:
Acceptable - Based on the quoter's performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoter's performance record is unknown. (See note below.)
Unacceptable - Based on the quoter's performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort
Note: In the case of a quoter without a record of relevant past performance, or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
Note: Quoters are not required or requested to submit past performance references. The Government will use public and Government-restricted sources (e.g. CPARS) to evaluate past performance.
Factor 3. Price
Price will not be rated. Price analysis will be conducted to determine reasonableness.
(xii) Quoters are required to include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items with its quote. Quoters shall complete only paragraph (b) of this provision if they have completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Quoter has not completed the annual representations and certifications electronically, it shall complete only paragraphs (c) through (q) of this provision.
Submission Requirements
-Completed Pricing schedule: Refer to the attached RFQ Fillable Requirement for structure of pricing schedule
-Acknowledgement of Statement of Work requirements
-Most Recent Lead Testing results in accordance with OSHA
-Applicable fill in clauses and provisions located throughout the Combined synopsis and the attached RFQ fillable requirements
-Subcontractor Agreement if Applicable
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Dallas Firing Range Services | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Indoor Firing Range Cleaning | Army National Guard | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity