Construct Redundant Electrical Supply, Buckley SFB, CO

Closed Solicitation Posted

Solicitation number
W9128F24R0066
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Omaha is seeking a construction contractor to replace end-of-life electrical infrastructure at Buckley Space Force Base in Colorado. The project involves installing a redundant commercial power feed to the PL-1 area, improving electrical system resiliency to meet Uptime Institute Tier IV Standards. Specific project goals include installing a new external power feed line, replacing the primary power feed line, providing a new redundant power feed line, installing new ATO-Type switchgear, demolishing the existing switchgear area, and removing the current primary power feed line inside the PL-1 area. The solicitation is classified under the Commercial and Institutional Building Construction NAICS category (236220) and is structured as a total small business set-aside. The proposal is due by February 28, 2025, with the opportunity initially posted on July 17, 2024.

The contract is specifically designated for small businesses and will require close coordination with the local power utility (XCEL) to execute the electrical infrastructure upgrades. While specific award values are not detailed in the solicitation, the project involves comprehensive electrical system replacement and redundancy improvements at a critical military facility. The place of performance is Buckley Space Force Base in Colorado, with work focused on eliminating existing high-risk single points of failure in the electrical distribution system. The project aligns with Air Force Instruction 32-1062 and aims to significantly enhance mission reliability through infrastructure modernization. Contractors interested in this opportunity will need demonstrated expertise in complex electrical infrastructure replacement, utility coordination, and military facility construction standards.

Notice text

10 versions

Update #10 · Latest ·

AM-0009 - Provide Appendix B - Xcel Energy ATO design for use in CLIN 0003 // AM-0008 - Revised Proposal Due Date and Updated Wage Determination // AM-0007 - Revised Proposal Due Date // AM-0006 - Updated Wage Determination and Revised Proposal Due Date // AM-0005 - Updated Wage Determination and Revised Proposal Due Date // AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #9 ·

AM-0008 - Revised Proposal Due Date and Updated Wage Determination // AM-0007 - Revised Proposal Due Date // AM-0006 - Updated Wage Determination and Revised Proposal Due Date // AM-0005 - Updated Wage Determination and Revised Proposal Due Date // AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #8 ·

AM-0007 - Revised Proposal Due Date // AM-0006 - Updated Wage Determination and Revised Proposal Due Date // AM-0005 - Updated Wage Determination and Revised Proposal Due Date // AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #7 ·

AM-0006 - Updated Wage Determination and Revised Proposal Due Date // AM-0005 - Updated Wage Determination and Revised Proposal Due Date // AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #6 ·

AM-0005 - Updated Wager Determination and Revised Proposal Due Date // AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #5 ·

AM-0004 - Updated Specifications/Drawings, Updated Wage Determination and Revised Proposal Due Date // AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #4 ·

AM-0003 - Updated Drawings/Specifications and Revised Proposal Due Date // AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #3 ·

// AM-0002 - Updated Drawings/Specifications, Revised DIV 00 22 00, Updated Wage Determination, and Revised Proposal Due Date // AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #2 ·

AM-0001 - Updated Drawings and Site Visit Sign-In Sheet // This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Update #1 ·

This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-1062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).2. Replace the primary power feed line inside the PL-1 area3. Provide new redundant power feed line to the PL-1 area.4. Provide new ATO-Type switchgear lineups5. Demolish the existing igloo switchgear area.6. Remove the existing primary power feed line inside the PL-1 area

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Construct Redundant Electrical Supply, Buckley SFB, CO Pre-Solicitation
Sources Sought - ERCIP Energy Resilience: PL-1 Electrical Power Supply, Buckley SFB, CO Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) Bolling AFB, District of Columbia 20032, United States · NAICS 238210 District Washington No set-aside
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback Dyess AFB, Texas, United States · NAICS 237130 ENDIST Fort Worth No set-aside
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business
Repair Electrical Systems Wright-Patterson AFB, OH 45433 (Area A, Area B and all other properties owned by Wright-Patterson Air Force Base, Ohio) 45433 · NAICS 238210 AFLCMC Wright Patterson AFB No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors