Concrete materials

Closed Solicitation Posted

Solicitation number
W912HZ26R7067
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Vicksburg, Mississippi 39180, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Engineer Research and Development Center Directorate of Public Works at the Department of the Army Corps of Engineers seeks concrete materials and related supplies for Building 2026 dust reduction, with quotes due August 13. This is a Total Small Business set-aside.

Place of performance is Vicksburg, Mississippi. The requirement includes 181 cubic yards of 4,000 psi MDOT Class AA concrete with superplasticizer (8-inch slump) to be delivered in three separate non-consecutive shipments of approximately 39, 58, and 84 cubic yards, scheduled by the technical point of contact with potential gaps of up to two weeks between deliveries for site preparation. Supporting materials—336 pieces of #4 rebar, 83 welded wire flat sheets, 2,800 chairs, bar ties, pressure-treated boards, plastic sheeting, rubber expansion joint, curing compound, and application equipment including sprayers and extension poles—must be delivered in a single shipment within 14 calendar days of award. All delivery costs must be included in pricing. Delivery is to Tony King, DPW, 3909 Halls Ferry Road, Vicksburg, MS 39180, (601) 415-6607 or Anthony.M.King@usace.army.mil. Quotes remain valid for 60 days from submission and may be submitted under an existing BPA contract. The Government accepts equivalent products meeting ASTM and MDOT specifications and federal Buy American requirements. Concrete delivery is material only; no pump trucks, washout, testing, or onsite services are required. NAICS 423390; PSC 5610.

Notice text

The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS has a requirement for concrete materials at Building 2026 to help reduce dust. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award. The concrete shall be delivered in 3 separate (39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries are approximate in size, could be in any order, and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Construction material PBO, 2/75 Ranger RegimentBLDG 3463, 3rd Division Dr./Mastin Ave.Jblm, WA 98433 98433 · NAICS 327390 MICC Fort Drum Total Small Business
Concrete Urn liners 1 Memorial DriveArlington, VA 22211 22211 · NAICS 327390 MICC Fort Drum Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity