This is a Request for Quote (RFQ) from the Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, Mississippi for concrete materials and related supplies needed at Building 2026 to reduce dust.

The RFQ specifies 17 line items including 181 cubic yards of 4,000 psi MDOT Class AA concrete with superplasticizer (slump of 8), reinforcement materials (#4 rebar, welded wire sheets, chairs, bar ties), formwork materials (pressure treated boards, nail stakes), protective and finishing materials (plastic sheeting, rubber expansion joint, curing compound), and application equipment (sprayers, paint roller frames, covers, extension poles, and cleaner). All materials excluding concrete must be delivered in a single shipment within 14 calendar days of award to Tony King at 3909 Halls Ferry Road, Vicksburg, MS 39180. Concrete shall be delivered in three separate non-consecutive shipments (approximately 39, 58, and 84 cubic yards) scheduled by the technical point of contact, with potential gaps of up to two weeks between deliveries to allow site preparation. Quotes are valid for 60 days from submission. Delivery costs must be included in the pricing. The technical and delivery point of contact is Tony King, DPW, at (601) 415-6607 or Anthony.M.King@usace.army.mil.

View the file

Other files

File Type Posted
Concrete Materials.pdf PDF
Request for quote Building 2026 Concrete Materials.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quote

Materials for Additional Concrete in B2026

Directorate of Public Works

ERDC Vicksburg, MS

Summary:

The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS has a requirement for concrete materials at Building 2026 to help reduce dust. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award. The concrete shall be delivered in 3 separate (39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries are approximate in size, could be in any order, and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).

Requirements Description:

A. All quotes are good for 60 days unless otherwise noted.

B. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award.

C. The concrete shall be delivered in 3 separate (approximately 39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries could be in any order and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).

D. Deliver to: Tony King, DPW, 3909 Halls Ferry Road, Vicksburg, MS 39180. Delivery shall be included in Quote.

E.

F. Technical and Delivery Point of Contact:

Tony King (601) 415-6607

Anthony.M.King@usace.army.mil

Line Description QTY Unit $/Unit Amount

4,000 psi MDOT Class AA Concrete with superplasticizer (slump of 8)

181 yd3

2 #4 rebar x 30' 336 ea

3 6x6 - W4.0 x 4.0 Welded Wire Flat sheets (8' x 15') 83 ea

4 3.5" Chairs 2800 ea

5 Bar Tie (Bag of 1000) 4 Bag

6 2" x 6" x 20' pressure treated board 25 ea

7 3/4" x 18" Nail Stake 200 ea

8 3/4" x 24" Nail Stake 100 ea

9 #8 x 2" star head coarse thread construction screws 20 lb mailto:Anthony.M.King@usace.army.mil

10 20ft x 100 ft roll of 10 mil plastic sheeting 6 Roll

11 1/2" x 6" rubber expansion joint 500 ft

ASTM C 309 TYPE 2 White Pigmented Membrane-forming curing compound

100 gal

13 2 Gallon chemical resistant pump-up sprayer 5 ea

14 9-inch paint roller frame 5 ea

15 9-inch x 3/8 inch paint roller cover 15 ea

4 ft to 8 ft adjustable extension pole for paint roller frame

5 ea

Xylene, Toluene, or manufacturer-approved cleaner for curing compound 5 gal