Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Dinosaur, Colorado 81610, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks rehabilitation of approximately 14 miles of Harpers Corner Road within Dinosaur National Monument in Colorado. The Central Federal Lands Highway Division of the Federal Highway Administration, in cooperation with the National Park Service, will rehabilitate the existing pavement and curb conditions. Key requirements include full depth reclamation, asphalt concrete pavement, guardrails, culverts and drainage improvements. Proposals will be evaluated based on technical qualifications, past performance, and price. The deadline for proposals is October 18, 2022.
There is no set-aside designation. The primary NAICS code is 237110 and PSC code R499. The estimated budget range for the project is between $10-20 million. Key scope details include 4,200 cubic yards of subexcavation, 2,400 cubic yards of embankment, 7,000 tons of roadway aggregate, 46,000 tons of asphalt concrete pavement, and rehabilitation along 14 miles of roadway.
Notice text
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME
PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) is proposing to rehabilitate (3R) the pavement and curb conditions for Harpers Corner Road within the Dinosaur National Monument. The project is located in Moffat County near Dinosaur, CO and will consist of rehabilitating approximately 14 miles of the road and one (1) parking area. Harpers Corner Road needs rehabilitation due to deterioration that is typical of aging pavements and due to several subgrade failures.
SCOPE OF THE WORK: The project scope is rehabilitation of existing roads, pullouts and parking areas so that visitors can continue to safely access park destinations.
The existing pavement along Harpers Corner Road is generally in moderate condition with several moderate to high severity subgrade failures. The existing posted speed along the route is 45 mph. This roadway is classified as an NPS Class 1 roadway; a principal park road/rural parkway with one lane in each direction. The existing roadway is paved and varies from 22 to 30 feet in width along the entire 14 miles with an approximate 2% normal crown and superelevation and corner widening, as needed on curves. Existing drainage is adequate with the exception of one subgrade failure where a new culvert is proposed. The asphalt curb and gutter is completely buried in several locations and overrun with vegetation and debris on others. Guardrail is generally in good condition but will be replaced to be meet current MASH requirements.
The project will be split into a base schedule encompassing 4.33 miles, and 2 options, encompassing 2.73 miles and 7.06 miles. It will require minor widening where the existing width is less than 24 feet, as well as the addition of minor drainage improvements and concrete curbs. Improvements also include embankment, full-depth reclamation, asphalt concrete pavement, guardrail, concrete curb, culverts, gates, ADA improvements, pavement markings and subexcavation.
The project will be constructed under temporary single lane closures requiring temporary traffic control. All work occurs within environmentally sensitive settings which will require best management practices and restrictions to protect identified resources.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items (Schedules and Options):
- 4,200 cubic yards of subexcavation
- 2,400 cubic yards of embankment
- 7,000 tons of roadway aggregate
- 225,000 square yards of full depth reclamation
- 46,000 tons of asphalt concrete pavement (superpave)
- 840 linear feet of underdrain system
- 33,000 linear feet of concrete curb
ESTIMATED COST RANGE: The project is between $10,000,000 and $20,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CO FTNP DINO 11(1) Harpers Corner Road | Solicitation | |
| This notice | Pre-Solicitation | |
| CO FTNP DINO 11(1) Harpers Corner Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CO-rocky MTN arsnl NWR-patch hill road | — | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| ND NP THRO 204(1) Buck Hill Road | Federal Highway Administration | No set-aside | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity