About this opportunity

This pre-solicitation notice seeks rehabilitation of approximately 14 miles of Harpers Corner Road within Dinosaur National Monument in Colorado. The Central Federal Lands Highway Division of the Federal Highway Administration, in cooperation with the National Park Service, will rehabilitate the existing pavement and curb conditions. Key requirements include full depth reclamation, asphalt concrete pavement, guardrails, culverts and drainage improvements. Proposals will be evaluated based on technical qualifications, past performance, and price. The deadline for proposals is October 18, 2022.

There is no set-aside designation. The primary NAICS code is 237110 and PSC code R499. The estimated budget range for the project is between $10-20 million. Key scope details include 4,200 cubic yards of subexcavation, 2,400 cubic yards of embankment, 7,000 tons of roadway aggregate, 46,000 tons of asphalt concrete pavement, and rehabilitation along 14 miles of roadway.

Notice text

THIS IS NOT A REQUEST FOR BID

PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME

PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) is proposing to rehabilitate (3R) the pavement and curb conditions for Harpers Corner Road within the Dinosaur National Monument.  The project is located in Moffat County near Dinosaur, CO and will consist of rehabilitating approximately 14 miles of the road and one (1) parking area. Harpers Corner Road needs rehabilitation due to deterioration that is typical of aging pavements and due to several subgrade failures.

SCOPE OF THE WORK: The project scope is rehabilitation of existing roads, pullouts and parking areas so that visitors can continue to safely access park destinations.

The existing pavement along Harpers Corner Road is generally in moderate condition with several moderate to high severity subgrade failures. The existing posted speed along the route is 45 mph. This roadway is classified as an NPS Class 1 roadway; a principal park road/rural parkway with one lane in each direction. The existing roadway is paved and varies from 22 to 30 feet in width along the entire 14 miles with an approximate 2% normal crown and superelevation and corner widening, as needed on curves. Existing drainage is adequate with the exception of one subgrade failure where a new culvert is proposed. The asphalt curb and gutter is completely buried in several locations and overrun with vegetation and debris on others. Guardrail is generally in good condition but will be replaced to be meet current MASH requirements.

The project will be split into a base schedule encompassing 4.33 miles, and 2 options, encompassing 2.73 miles and 7.06 miles. It will require minor widening where the existing width is less than 24 feet, as well as the addition of minor drainage improvements and concrete curbs.  Improvements also include embankment, full-depth reclamation, asphalt concrete pavement, guardrail, concrete curb, culverts, gates, ADA improvements, pavement markings and subexcavation.

The project will be constructed under temporary single lane closures requiring temporary traffic control.  All work occurs within environmentally sensitive settings which will require best management practices and restrictions to protect identified resources.

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items (Schedules and Options):

  • 4,200 cubic yards of subexcavation
  • 2,400 cubic yards of embankment
  • 7,000 tons of roadway aggregate
  • 225,000 square yards of full depth reclamation
  • 46,000 tons of asphalt concrete pavement (superpave)
  • 840 linear feet of underdrain system
  • 33,000 linear feet of concrete curb

ESTIMATED COST RANGE: The project is between $10,000,000 and $20,000,000.

Notice history

Notice Type Posted
CO FTNP DINO 11(1) Harpers Corner Road Latest solicitation Solicitation
This notice Pre-Solicitation
CO FTNP DINO 11(1) Harpers Corner Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
CO-rocky MTN arsnl NWR-patch hill road NAICS 237310 — No set-aside
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity