Clearwater Station Water Tank Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12970223Q0055
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Clovis, California 93611, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is soliciting proposals to replace the water tank at the Clearwater Station in Clovis, California under solicitation number 12970223Q0055. Offerors will furnish all labor, equipment, and materials to demolish the two existing tanks totaling 10,000 gallons, install a new 31,000 gallon water tank, connect it to the distribution lines and controls, install approximately 350 feet of waterline and a new fire hydrant, and disinfect the water system. Proposals are due by May 23, 2023 and will be evaluated based on past performance, experience, technical approach, and price, with award being made on a firm-fixed price basis to the offer representing the best value.
This is a total small business set-aside to be performed within 45 days of notice to proceed. Work will be carried out in Clovis, CA and involves demolishing approximately 10,000 gallons of existing water storage and installing a new 31,000 gallon tank to codes under NAICS 237910 and PSC C-421. The solicitation provides specifications, drawings, and a site map for reference. Quotes were due May 15, 2023 and award will be made to a single awardee with a project completion date of 45 days after notice to proceed.
Notice text
Title: Clearwater Station Water Tank Replacement, Sierra National Forest
Description: Furnish all labor, equipment (including new 31,000-gallon water tank) and material to accomplish the Work under this contract. Work includes but is not limited to the following major items:
- Demolish and disposed of two water tanks and base (approximately 5,000 gallons each).
- Full installation of new water tank 31,000 gallons.
- Connecting water tank back to the distribution lines for the station.
- Connecting electrical controls for the tank.
- Disinfecting the entire water system.
- Install approximately 350 LF of 4¿ waterline for the new hydrant.
- Installing a new tanker fire hydrant, control valve, and box.
The USFS intends to award one (1) Firm-Fixed-Price (FFP) contract resulting from this solicitation.
Attachments
| File | Type | Posted |
|---|---|---|
| J.3 Drawings_G-01 Clearwater Station Site Map.pdf | ||
| J.4 MAP_Clearwater Station Water Tank Replacement.pdf | ||
| J.1 SPECS_Clearwater Station Water Tank Replacement.pdf | ||
| 12970223Q0055 Clearwater Fire Station Water Tank Replacement.pdf | ||
| J.2 Fire Plan 2013_North Fork_Clearwater Station Water Tank Replacement.doc | DOC document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Clearwater Station Water Tank Replacement | Award Notice | |
| Clearwater Station Water Tank Replacement | Solicitation | |
| Clearwater Station Water Tank Replacement | Solicitation | |
| Clearwater Station Water Tank Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity