J.3 Drawings_G-01 Clearwater Station Site Map.pdf

PDF 493 KB Posted

Attached to
Clearwater Station Water Tank Replacement Federal contract opportunity
Solicitation number
12970223Q0055
Issued by
Department of Agriculture Forest Service

About this file

This document includes drawings and specifications for the Clearwater Station Water Tank Replacement project. The project scope involves demolishing two existing water tanks totaling 10,000 gallons and installing a new 31,000 gallon water tank. Additional work includes connecting the new tank to the station's water distribution lines and controls, installing approximately 350 linear feet of 4-inch waterline and a new fire hydrant with control valves and box, and disinfecting the entire water system. The solicitation is being issued by the US Department of Agriculture Forest Service to furnish all labor, equipment, and materials for the project under a firm-fixed-price contract to one awardee.

View the file

Other files for this federal contract opportunity

Other files attached to Clearwater Station Water Tank Replacement, newest first.
File Type Posted
J.2 Fire Plan 2013_North Fork_Clearwater Station Water Tank Replacement.doc DOC document
J.4 MAP_Clearwater Station Water Tank Replacement.pdf PDF
J.1 SPECS_Clearwater Station Water Tank Replacement.pdf PDF
12970223Q0055 Clearwater Fire Station Water Tank Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R05)

PACIFIC SOUTHWEST REGION

CLEARWATER

STATION

WATER TANK

REPLACEMENT

SIERRA NATIONAL

FOREST

BASS LAKE

RANGER DISTRICT

CLEARWATER SITE MAP

4/15/2023

MRIOS

MRIOS

ANTONIO C.

G-01 01 01

NOTES FOR PROJECT

INSTALL ONE VALVE AT TANK FOR

MAINLINE.

INSTALL ONE VALVE W/ BOX TO DRAIN

THE TANK.

INSTALL ONE VALVE W/ BOX BEFORE

THE FIRE HYDRANT.

ADJUSTMENT TO LAYOUT MAY BE

NEEDED ONCE CONSTRUCTION BEGINS.

CLEARWATER STATION SITE MAP

ENGINE BAY

BARRACKS

PUMP HOUSE

EXISTING TANKS

AND PROPOSED

LOCATION FOR

NEW TANK

PROPOSED LAYOUT

OF WATER LINE

PROPOSED

LOCATION FOR

FIRE HYDRANT

VALVE

VALVEVALVES

DRAIN LINE

N

S

EW

Feet

0 50 100

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

Sheets and Views
G-01 Clearwater Station Site Map

File details come from the government source that posted it. Updated .