About this opportunity

The Department of the Army Ohio Army National Guard is soliciting construction of approximately 3,850 linear feet of FE-6 security fencing with two 20-foot manual sliding gates at Load Line 6, Camp James A. Garfield in Ravenna, Ohio, with quotations due September 21, 2026 at 10:00 AM EDT and questions due September 15 at 10:00 AM EDT. This is a Total Small Business set-aside under a Firm-Fixed-Price Request for Quotation, with a small business size standard of $19,000,000.

Place of performance is Ravenna, Ohio. The fence must meet DoD Unified Facilities Supplement 4-022-03 specifications: minimum eight feet total height with seven feet of 9-gauge galvanized chain-link fabric in two-inch mesh, 45-degree outriggers with three strands of barbed wire, Schedule 40 pipe posts with 42-inch minimum post-hole depth (10-inch diameter concrete footing for line posts, 12-inch for terminal, corner, and gate posts), and maximum two-inch clearance between fabric and finished grade. The contractor must verify all field measurements before quotation submission. All contractor employees must complete AT Level 1 Awareness Training, iWATCH training, and OPSEC training within 30 calendar days of assignment. The contractor provides all labor, materials, equipment, permits, supervision, and quality control. Work is performed Monday through Friday, 0730–1630 hours, excluding federal holidays.

Period of performance is six months from award, with preference for completion prior to December 1, 2026. The contractor must comply with Davis-Bacon Act prevailing wage determination (OH20260001), obtain Storm Water Construction Permit training, manage sediment and erosion controls, develop and submit a Quality Control Plan within 10 days of award, and restore the site with grass seeding and straw mulching. Evaluation criteria are technical capability, past performance, and price. Site visits are encouraged; contact CW2 Grant Stoner (614-336-6580) or MAJ Kyle Miller to schedule. Electronic submission to barry.b.beale.civ@army.mil. Quotations must remain valid for 60 calendar days after the due date. NAICS code 238990; PSC Y1PZ.

Notice text

3 versions

Update #3 · Latest ·

Amendment 1 – Q&A – 16 Sep 26

Question1. The PWS references two 20-foot manual sliding security gates and also states that two 20-foot manual gate openings are to be installed. Please confirm whether the requirement is for two separate 20-foot manual sliding gate openings, or one 40-foot opening consisting of two 20-foot sliding gate leaves that close together.

Answer 1: The requirement is for two separate 20-foot manual sliding gates.

Question 2. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references “swing clearance.” Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration.

Answer 2: The requirement is for two separate 20-foot manual sliding gates.

Question 3. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date?

Answer 3: Site visits can be scheduled by contacting CW2 Grant Stoner (614-336-6580, grant.m.stoner.mil@army.mil) or MAJ Kyle Miller (kyle.r.miller56.mil@army.mil).

Question 4. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates?

Answer 4: Yes, drawing is attached and ARNG will perform layout prior to fencing installation after the vegetation clearing is complete.

Question 5. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award.

Answer 5: The contractor will receive a six-month period to complete the work, but the work should be scheduled immediately upon award of the contract, and if possible, the government would like completion prior to 1 December.

Question 6. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation?

Answer 6: There are no live underground utilities in the area.

Question 7. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for.

 Answer 7: The contractor must comply with the Ohio National Guard Environmental requirements, but no additional permits are required for this project.

Question 8. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor?

Answer 8: Fence line installation will be cleared to a minimum of 30 feet left and right of center via another project prior to fence installation. The area will be graded so that grass is planted and mowing can be accomplished.

Question 9. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site?

 Answer 9: A minimum amount of excess soil may remain on the site if it can be spread to conform to the natural grade on the site.

Question 10. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule?

 Answer 10: All access requirements are provided in the post award kick off meeting. There are no fees and no badging requirements.

Question 11. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination.

 Answer 11: Wage determination for Ohio Heavy and highway applies and will be updated prior to award if a new version is available.  OH20260001 07/30/2026

Question 12. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria.

Answer 12: There are no additional requirements that are not in the PWS or applicable UFS criteria.

Question 13. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due?

Answer 13: 01_sheets-fence-v3_redacted is the only drawing included.  Request a site visit if additional information is required.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Amendment 1 - 10 Sep 2026 - Add POC for site visit, Added drawing, Added Q&A.

Site Visits Encouraged - Call to schedule - Call 1SG Brian Persing 614-336-6975 or CW2 Grant Stoner 614-336-6580.

Attachment added: 01_SHEETS-FENCE-V3.pdf

Q&A

Question 1. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references “swing clearance.” Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration.

Answer 1. Manual sliding gates

Question 2. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date?

Answer 2. Can either have a scheduled site visit day or be available when needed by appointment with prospective contactors, although until clearing is complete not much to see.

Question 3. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates?

Answer 3. Fence Alignment drawing was provided (also see attached here, once clearing is complete, BDE 12T assets will be used to layout alignment.

Question 4. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award.

Answer 4. Complete prior to December 1 is preferred, also cant start until after clearing is complete in late September / October

Question 5. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation?

Answer 5. no active utilities in the area

Question 6. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for.

Answer 5. This project is covered under the C-JAG Storm Water Construction Permit and the contractor will have to attend a brief training on the SWP3, submit a co-permittee NOI, sign a Contractor certification form, install additional sediment and erosion controls if necessary, comply with fueling requirements and spill kits, comply with concrete outwash, level ruts, prepare seed bed, and seed and straw all bare earth areas they create.

Question 7. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor?

Answer 7. A site visit is authorized

Question 8. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site?

Answer 8. Soil can be spread in the clear zone and a seed bed prepared and all bare earth areas seeded with a C-JAG approved turf grass mix and mulched with 2” to 3” of straw cover.

Question 9. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule?

Answer 9. An access roster will be provided, valid drivers license or photo ID must be present at all times.

Question 10. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination.

Answer 10.  Yes Davis-Bacon Act applies.

Question 11. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria.

Answer 11. There are no additional hardware requirements besides those contained in the PWS and UFS.

Question 12. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due?

Answer 12. No

Question 13. What is the Height of the fence?

Answer 13. The fence height is 8 feet, with a minimum of 7 feet of fabric plus the top guard outrigger and barbed wire.

Question 14. Is the contractor to install a slide gate or swing gate?

Answer 14. Slide Gate

Question 15. Are the fence and footers to be removed by installation contractor?

Answer 15.  Old fence will be removed prior to start of work.

Question 16. Can the footers and fence be left on site?

Answer 16. No

Question 17. Does the fence need to be grounded? If so, how often does it need to be grounded?

Answer 17. Grounding is not required for this project.

Question 18. What your spec on FE-6, we want to make sure we don’t have tension wire, rods, barbed wire on the inside and outside ect.

Answer 18. Not sure what the question is.

Question 19. Confirm which specific portions of the project require integrated intrusion detection systems (sensored) versus standard perimeter fencing (non-sensored) to select the correct detail (FEN-03 vs. FEN-04).

Answer 19. There will be no intrusion detection systems on the fence.

Question 20. Review Hardware: High-security specifications (ASTM F626) mandate specific fittings, tension bands, and tie wires. Ensure your material take-off accounts for these high-security grade accessories rather than standard commercial hardware.

Answer 20. Not high security specs

Question 21. Confirm Gate Requirements: Refer to the FEN-09 detail specifically for any swing or cantilever gates, as these have distinct framing, post size (often 4-inch or 6 5/8-inch OD depending on width), and bracing requirements compared to the main fence line.

Answer 21. Manual sliding gates

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Construction of approximately 3,850 linear feet of FE-6 security fencing, including two 20-foot manual security gates, at Load Line 6, Camp James A. Garfield, Ravenna, Ohio

Site visits are encouraged - call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580.  Only contact for site visits, all other questions are submitted to barry.b.beale.civ@army.mil

Update #2 ·

Amendment 1 - 10 Sep 2026 - Add POC for site visit, Added drawing, Added Q&A.

Site Visits Encouraged - Call to schedule - Call 1SG Brian Persing 614-336-6975 or CW2 Grant Stoner 614-336-6580.

Attachment added: 01_SHEETS-FENCE-V3.pdf

Q&A

Question 1. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references “swing clearance.” Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration.

Answer 1. Manual sliding gates

Question 2. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date?

Answer 2. Can either have a scheduled site visit day or be available when needed by appointment with prospective contactors, although until clearing is complete not much to see.

Question 3. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates?

Answer 3. Fence Alignment drawing was provided (also see attached here, once clearing is complete, BDE 12T assets will be used to layout alignment.

Question 4. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award.

Answer 4. Complete prior to December 1 is preferred, also cant start until after clearing is complete in late September / October

Question 5. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation?

Answer 5. no active utilities in the area

Question 6. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for.

Answer 5. This project is covered under the C-JAG Storm Water Construction Permit and the contractor will have to attend a brief training on the SWP3, submit a co-permittee NOI, sign a Contractor certification form, install additional sediment and erosion controls if necessary, comply with fueling requirements and spill kits, comply with concrete outwash, level ruts, prepare seed bed, and seed and straw all bare earth areas they create.

Question 7. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor?

Answer 7. A site visit is authorized

Question 8. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site?

Answer 8. Soil can be spread in the clear zone and a seed bed prepared and all bare earth areas seeded with a C-JAG approved turf grass mix and mulched with 2” to 3” of straw cover.

Question 9. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule?

Answer 9. An access roster will be provided, valid drivers license or photo ID must be present at all times.

Question 10. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination.

Answer 10.  Yes Davis-Bacon Act applies.

Question 11. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria.

Answer 11. There are no additional hardware requirements besides those contained in the PWS and UFS.

Question 12. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due?

Answer 12. No

Question 13. What is the Height of the fence?

Answer 13. The fence height is 8 feet, with a minimum of 7 feet of fabric plus the top guard outrigger and barbed wire.

Question 14. Is the contractor to install a slide gate or swing gate?

Answer 14. Slide Gate

Question 15. Are the fence and footers to be removed by installation contractor?

Answer 15.  Old fence will be removed prior to start of work.

Question 16. Can the footers and fence be left on site?

Answer 16. No

Question 17. Does the fence need to be grounded? If so, how often does it need to be grounded?

Answer 17. Grounding is not required for this project.

Question 18. What your spec on FE-6, we want to make sure we don’t have tension wire, rods, barbed wire on the inside and outside ect.

Answer 18. Not sure what the question is.

Question 19. Confirm which specific portions of the project require integrated intrusion detection systems (sensored) versus standard perimeter fencing (non-sensored) to select the correct detail (FEN-03 vs. FEN-04).

Answer 19. There will be no intrusion detection systems on the fence.

Question 20. Review Hardware: High-security specifications (ASTM F626) mandate specific fittings, tension bands, and tie wires. Ensure your material take-off accounts for these high-security grade accessories rather than standard commercial hardware.

Answer 20. Not high security specs

Question 21. Confirm Gate Requirements: Refer to the FEN-09 detail specifically for any swing or cantilever gates, as these have distinct framing, post size (often 4-inch or 6 5/8-inch OD depending on width), and bracing requirements compared to the main fence line.

Answer 21. Manual sliding gates

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Construction of approximately 3,850 linear feet of FE-6 security fencing, including two 20-foot manual security gates, at Load Line 6, Camp James A. Garfield, Ravenna, Ohio

Site visits are encouraged - call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580.  Only contact for site visits, all other questions are submitted to barry.b.beale.civ@army.mil

Update #1 ·

Construction of approximately 3,850 linear feet of FE-6 security fencing, including two 20-foot manual security gates, at Load Line 6, Camp James A. Garfield, Ravenna, Ohio

Site visits are encouraged - call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580.  Only contact for site visits, all other questions are submitted to barry.b.beale.civ@army.mil

Files

File Type Posted
Combined SS Fence Install_Amendment 2_16 Sep 26.docx DOCX document
01_SHEETS-FENCE-V3_Redacted.pdf PDF
Combined SS Fence Install_Amendment 1.docx DOCX document
PWS_Security Fencing Installation.docx DOCX document
Combined SS Fence Install.docx DOCX document

Notice history

Notice Type Posted
CJAG Fence Install Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WV-canaan VLY NWR-chain link fence NAICS 236220 — Total Small Business
36C25627R0012_presolicitation_notice_replace perimeter security fence Arkansas 72703, United States · NAICS 236220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
10-Miler Fencing Patrick AFB, Florida 32925, United States · NAICS 532490 Air Force Space Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity